Handle Assembly - MTD 500 series Operator's Manual

Two-stage
Hide thumbs Also See for 500 series:
Table of Contents

Advertisement

2-Way& 4-WayAssembly
Remove all loose parts before assembling.
Handle Assembly
1.
Place the shift lever in the Forward-6
position
2.
Observe the lower rear area of the snow thrower
to be sure
both cables are aligned
with roller guides
before pivoting
the handle
upward.
Pivot the handle
upward. See Fig. 3-1.
Figure 3-1
NOTE: Make certain the upper ends of each cable are
seated properly
in its pulley. See Fig. 3-2.
ChuteAssembly
1.
Remove cotter pin, wing nut and hex screw from chute
control
head and clevis pin and bow-tie
cotter
pin from
chute support
bracket. See Fig. 3-3.
f
t
Chute Control Head
Chute Support
Bracket
...........
Chute Base
Figure
3-3
2.
Insert hex rod into chute control
head. Push rod as far into
chute control
head as possible,
keeping
the holes in the
hex rod pointing
upward.
See Fig. 3-4.
\
/
/
/
Figure 3-4
3.
Figure 3-2
Secure the handle by tightening
the plastic knob located
on both the left and right sides of the handle. Remove
and discard any rubber
bands, if present. They are for
packaging
purposes
only.
8
I
SECTION3--
ASSEMBLY &
SET-UP

Advertisement

Table of Contents
loading

This manual is also suitable for:

600 series

Table of Contents