Mitsubishi G-50A Operating Manual page 37

For mn converter & g-50a building air conditioning control system
Hide thumbs Also See for G-50A:
Table of Contents

Advertisement

2) Clicking
displaying the horizontal grid line in the number being
set to the graph.
(e) Starting the graph
Clicking
each one minute. The sampling time to allow graphing by
online system is limited to 500 minutes maximum. If 500
minutes are exceeded, the data of old time is eliminated by
the excess time.
(2) Screen function and operation
- The current monitor data is displayed on [Lower column].
- Clicking [Graph number] makes the graph line bold.
- [Current time] is displayed.
- Clicking
suspends the monitoring.
At suspension, [Scaler] will be displayed on the graph.
Dragging the scaler displays the data on the scaler at the
current value column and [Time] at the under part of the graph
number.
- Moving [Scroll bar] by dragging or clicking
display range of the graph.
can be operated as same as the local remote
controller.
[Refer to 3.10 Operation control.]
* Here, BC operation cannot be carried out.
- Clicking
clears the graph being displayed. The set values of the graph setting items and other
setting items will remain unchanged.
(3) Ending the graph
To finish Trend Graph Screen and return to Operation Status Monitor Screen, click [Return] on the
menu bar or click
displayed. For returning, click
Operation Status Monitor Screen.
returns to Trend Graph Screen
initiates monitoring to graph the data for
. A message of [Finish the trend graph and return to the monitor?] will be
, while not returning, click
moves the
36
[Graph number]
. Clicking
(3)
returns to

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mn converterMaintenance tools

Table of Contents