Operation - Cub Cadet RT-75 Operator's Manual

Rear tine
Hide thumbs Also See for RT-75:
Table of Contents

Advertisement

Operation

Starting the Engine
WARNING!
instructions and warnings on the machine and in
this manual before operating.
NOTE: When pushing the tiller with the engine off, you will hear a
ratcheting sound or gear noise; this is normal.
WARNING!
the tiller while the engine is running or being
started.
1.
Place the neutral lever in the NEUTRAL position by pulling
back on the neutral lever and moving it to the right. See
Figure 5-1.
Drive
2.
Move the throttle control into the run
follow the instructions in the Engine Operator's manual to
start the engine.
Stopping the Engine
To stop the engine place the throttle in the STOP
refer to the Engine Operator's Manual.
12
Read, understand, and follow all
Be sure no one is standing in front of
Neutral
Figure 5-1
position and
position and
Setting The Depth
Tilling depth is controlled by the depth stake which can be
adjusted to seven different settings. Adjust the side shields as
you adjust the depth stake.
1.
Pull back on the depth adjustment lever (a), move the lever
up or down into the desired tilling depth (b) and move back
forward to lock into place (c). See Figure 5-2.
C
Figure 5-2
2.
When using the tiller for the first time, use the second
adjustment slot from the top. See Figure 5-2.
5
A
B

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents