Chevrolet 2011 Volt Owner's Manual page 146

Hide thumbs Also See for 2011 Volt:
Table of Contents

Advertisement

5-34
Instruments and Controls
5. Press Edit Summer Schedule or
Edit Winter Schedule to edit the
daily electric rate schedule.
Electric Rate Schedule Editing
From the Enter Summer/Winter
Start Dates screen, press Edit
Summer Schedule or Edit Winter
Schedule.
From the Select Electric Rate Plan
screen, press Yearly Schedule and
then press Edit.
1. Press Weekday or Weekend.
2. Press Edit next to the row to be
changed.
Weekdays are Monday
through Friday and use the
same rate schedule.
Weekends are Saturday
and Sunday and use the
same rate schedule.
Both weekday and weekend
schedules must be set. The rate
schedule only applies for a 24-hour
period, starting at 12:00 AM and
ending at 12:00 AM. There can be
five rate changes for each day; not
all must be used.
The finish times must be
consecutive. If a finish time does
not follow a start time, the error
message displays An invalid entry
was found in the data entered.
Please re enter data.
Electric Rate Finish Time Editing
From the Edit (Summer, Winter,
or Yearly) Electric Rate Schedule
screen, press Edit next to the row
to change.

Advertisement

Table of Contents
loading

Table of Contents