CLEARANCES TO COMBUSTIBLES
It is of utmost importance that the clearances to combustible materials be strictly adhered to during
installation of the stove. Refer to the tables below :
Key
Inches
Metric (mm)
• Floor to ceiling height must be at least 7ft (2.13m) in all cases.
• The clearance between the flue pipe and a wall are valid only for vertical walls and for vertical flue
pipe.
•
The chimney connector shall not pass through an attic or roof space,closet or similar concealed
space, or a floor, or ceiling.
• A flue pipe crossing a combustible wall must have a minimum clearance of 18"(457mm).
• To reduce flue clearances from combustible materials, contact your local safety department.
Ussc
Single pipe / Double pipe
A
B
7/6
23/24
178/152
584/610
C
D
16/17
13.7/12.7 34.9/35.9 27.9/28.9
406/432
348/323
E
F
886/912
709/734
9