Cub Cadet 900 series Operator's Manual page 10

Two-stage snow thrower
Hide thumbs Also See for 900 series:
Table of Contents

Advertisement

Clean-Out Tool
The clean-out tool is mounted to the rear of the auger housing
and is designed to clear a clogged chute. See Figure 3-10. Refer
to the Operation section for more detailed information regarding
the chute clean-out tool.
NOTE: This item is fastened with a cable tie to the rear of the
auger housing at the factory. Cut the cable tie before operating
the snow thrower.
WARNING:
and ice from the chute assembly or auger housing.
Final Adjustments
Make these final adjustments before operating your snow
thrower for the first time. Failure to follow these instructions may
cause damage to the snow thrower.
Wheel Drive Control & Shift Lever
Perform the following test to determine need for adjustment:
Move the shift lever into sixth (6) position. See Figure 4-1.
With the drive control released (see Figure 3-11), push the
snow thrower forward, then pull it back. The machine
should move freely.
Engage the drive control and attempt to move the machine
both forward and back, resistance should be felt.
Move the shift lever into the fast reverse (R2) position and
repeat the previous two steps.
If you experienced resistance rolling the unit, either when
repositioning the shift lever from 6 to R2 or when attempting
to move the machine with the drive control released, adjust the
drive control immediately. To adjust, proceed as follows:
Loosen the Nylock nut on the drive control cable and
unthread the cable one full turn. See Figure 3-13.
Recheck adjustment.
10
S
3— a
ectioN
SSeMbly
Never use your hands to clean snow
Clean-Out Tool
Fig. 3-10
& S
-u
et
p
NOTE: For more details, refer to Drive Control Adjustment in the
Maintenance and Adjustment Section of this manual.
Chute Tilt Control
Auger
Control
Auger
Control
Cable
Fig. 3-11
Auger Control Test
Check the adjustment of the auger control as follows:
When the auger control is released and in the disengaged
"up" position (see Figure 3-11), the cable should have very
little slack, but should NOT be tight.
WARNING:
Do not over-tighten the cable. Over-
tightening may prevent the auger from
disengaging and compromise the safety of the
snow thrower.
In a well-ventilated area, start the snow thrower engine as
instructed in the separate engine manual.
While standing in the operator's position (behind the snow
thrower) engage the auger.
Allow the auger to remain engaged for approximately ten
seconds before releasing the auger control. Repeat this
several times.
With the auger control lever in the disengaged "up"
position, walk to the front of the machine.
Confirm that the auger has completely stopped rotating
and shows no signs of motion.
IMPORTANT: If the auger shows any signs of rotating,
immediately return to the operator's position and shut off the
engine. Wait for all moving parts to stop before readjusting the
auger control cable.
To readjust the control cable, unhook the spring (found
on the end of the auger cable) from the auger actuator
bracket. See Figure 3-12.
Push the cable coupler through the end of the spring to
expose the lock nut. See Figure 3-13.
Shift Lever
Drive
Control
Drive
Control
Cable

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents