Further to the intake and switch-over valves
(solenoid valves for ABD)
Solenoid valves not OK (function or leakage).
Note
A correct test on the ABD solenoid valves is
possible only if there is no fault on an ABS inlet
valve or ABS outlet valve.
Therefore, read out the fault memory beforehand
and remedy this fault first if necessary.
Test step "Intake valve" not OK
8
-Test
sequence not observed.
-Function
of the intake valves not OK.
-Return
pump operation not OK.
Check pump operation. To do this, select re-
turn pump in the Drive links menu (pump
must then run).
-ABD
secondary circuit poorly bled.
Bleeding, see Page 45 -D 43.
-Intake
or switch-over valve leaks.
8
Test step "Switch-over valve" not OK
-Test
sequence not observed.
-Function
of the switch-over valve not
OK.
8
45 -D 38
45 02 Diagnosis/troubleshooting, ,anti-lock brake system
986D451
Printed
in Germany
-3,
1996

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents