Baxi Combi 133 HE Plus Installation & Servicing Instructions Manual page 23

Gas fired wall mounted condensing combination boiler
Hide thumbs Also See for Combi 133 HE Plus:
Table of Contents

Advertisement

Lower Door
Panel
Fig. 16
Fig. 17
© Baxi Heating UK Limited 2005
Outer Case Fixing
Screw
Service Guidance Note Label
on inside of panel
8.0 Installation
8.3
Preparing The Boiler
1. Remove the outer carton.
2. Hinge up the lower door panel (Fig. 16).
3. Remove the outer case fixing screws (Fig. 16). Slide
the outercase upwards to disengage the hooks on the
backplate and remove (Fig. 17).
NOTE: Service Guidance Note Label is fitted to
the inside of the outercase (Fig. 17).
4. Remove the sealing plugs from the copper bends.
5. Remove cardboard transit packaging at the left hand
rear of the boiler before lifting the boiler onto the
support bracket.
6. Stand the boiler on its base by using the rear lower
edge as a pivot.
NOTE: A small amount of water may drain from
the boiler in the upright position.
Baxi declare that no substances harmful to health
are contained in the appliance or used during
construction of the appliance.
23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Combi 100 he plusCombi 80 he plus

Table of Contents