Installing The Second Welding Boss And Nozzle Mr2 Mid-Radius - GE T17 Installation Manual

Ultrasonic flow transducer
Hide thumbs Also See for T17:
Table of Contents

Advertisement

Chapter 2. Installing the Pipe Nozzles

2.4.6 Installing the Second Welding Boss and Nozzle MR2 Mid-Radius

Install the second welding boss and nozzle at the marked position (see Figure 64 below) as described in "Installing the
First Welding Boss - MR2 Mid-Radius" on page 47 and "Installing the First Nozzle - MR2 Mid-Radius" on page 50.
Top View
Figure 64: Installing the Second Welding Boss and Nozzle
The completed installation should appear as shown in Figure 65 below.
Nozzle (2 places)
Welding Boss (2 places)
45º
Flow
Top View
End View
Figure 65: Completed MR2 Mid-Radius Installation
52
Model T17 Installation Guide

Advertisement

Table of Contents
loading

Table of Contents