Chapter 2. Installing the Pipe Nozzles
2.2.3 Determining and Marking the Second Nozzle Location - Diametrical (cont.)
5. Remove the strip of film and fold it as shown in Figure 12 below to determine the position which is
diametrically opposite the overlap position when the film is reapplied to the pipe.
6. Mark the outside of the fold for reference, as shown in Figure 13 below.
7. Place the strip of film back on the pipe. This time, line up the overlap mark with the horizontal and vertical
scribe lines (see Figure 14 below). Again, make sure you wrap the strip of film squarely around the pipe.
10
Overlap Mark
Figure 12: Folding the Film
Figure 13: Marking the Film
Overlap Mark
First Edge
Figure 14: Placing the Film on the Pipe
Fold to Here
Mark the Edge
Side View