Required Facility Needs - GE Vivid T8 Basic Service Manual

Hide thumbs Also See for Vivid T8:
Table of Contents

Advertisement

Site Preparations

2-3-3 Required facility needs

NOTE:
2-14
GE Healthcare requires a dedicated power and ground for the
proper operation of its Ultrasound equipment. This dedicated
power shall originate at the last distribution panel before the
Ultrasound system.
Sites with a mains power system with defined Neutral and Live:
The dedicated line shall consist of one phase, a neutral (not
shared with any other circuit), and a full size ground wire from
the distribution panel to the Ultrasound outlet.
Sites with a mains power system without a defined Neutral:
The dedicated line shall consist of one phase (two lines), not
shared with any other circuit, and a full size ground wire from the
distribution panel to the Ultrasound outlet.
Vivid T9/Vivid T8 – Basic Service Manual
5795591-100 English Rev. 3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vivid t9

Table of Contents