Adjustments
Adjust LP Fuel System
1. Park machine on a level surface, stop engine, en
2
gage parking brake, and remove key from the ignition
switch.
2. Read carefully Precautions for Working on Liquid
Propane Gas (LP) Fuel Systems before proceeding fur
ther.
3. Slowly open valve on propane fuel tank and close.
1
Use leak check or soap solution to check all fittings,
valves, couplers, and lines for leaks. No fuel leaks
should be present. Any detected fuel leaks must be re
paired before engine is started.
IMPORTANT:Use exhaust gas analyzer to monitor
CO readings.
4. Reopen tank valve and start engine. Allow engine to
reach normal operating temperature. Using idle adjust
Figure 7
ment screw, adjust for a CO readIng of 1 to 3% at idle
1. Vaporizer–regulator
2. Idle adjustment screw
speed of 1200 rpm (Fig. 7).
5. Run engine at 3000 rpm and recheck idle CO adjust
ment. High load mixture is not adjustable but will pro
duce a CO readIng of 3 to 7%.
6. To prevent tampering with adjustment, install welsh
plug over idle mixture screw (Fig. 7).
Liquid Propane Conversion Kit
Page 11 – 10 Rev. D
Workman 3000/4000 Series