Panasonic PV500 User Manual page 165

Machine vision system imagechecker
Hide thumbs Also See for PV500:
Table of Contents

Advertisement

Running a Test and Confirming Result
Confirm if the current settings perform an inspection properly. To observe the image easily, set "Window
Transparency (SETUP menu)" to a larger value. ("Changing Window Transparency (SETUP Menu)", page
341 )
1.
Press the TRIG key.
When a live image is displayed on the
screen, PV captures a new image first and
runs a test. When a memory image is
displayed, it runs a test using the current
memory image without capturing any
images.
Position adjustment is also executed at the
same time if it is used.
2.
Check data of detected area list.
No.:
Pitch;
Judgement:
Distance Difference:
Judgement:
X0, Y0, Diff.0:
X1, Y1, Diff.1:
·
When Calibration is employed, the data is displayed after calibration.
·
When highlighting each No., Gray Edge cells displayed on the screen window turn to pink.
Gray Edge cell No.
Data of Pitch, Gap, Float, and Width. (Regardless of execution modes, the name is
fixed to "Pitch".)
Judgment of each pin (or width for Width measurement)
Distance Difference of "Float" (Available only in the case of Execution Mode =
Float)
Judgement of Distance Difference of "Float" (Available only in the case of
Execution Mode = Float)
Coordinates and differential value of edges detected with Area 0.
Coordinates and differential value of edges detected with Area 1.
163

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pv500v2

Table of Contents