Supervising Elements - GE c60 Instruction Manual

Breaker protection system
Hide thumbs Also See for c60:
Table of Contents

Advertisement

CHAPTER 5: SETTINGS

5.7.8 Supervising elements

5.7.8.1 Open pole detector
SETTINGS  GROUPED ELEMENTS  SETTING GROUP 1(6)  SUPERVISING ELEMENTS  OPEN POLE DETECTOR
 OPEN POLE DETECTOR
C60 BREAKER PROTECTION SYSTEM – INSTRUCTION MANUAL
Figure 5-106: Auxiliary overvoltage logic
OPEN POLE FUNCTION:
Disabled
OPEN POLE BLOCK:
Off
OPEN POLE CURRENT
SOURCE: SRC 1
OPEN POLE CURRENT
PKP: 0.20 pu
OPEN POLE BROKEN
CONDUCTOR: Disabled
OPEN POLE VOLTAGE
INPUT: Disabled
OPEN POLE VOLTAGE
SOURCE: SRC 1
OPEN POLE A AUX CO:
Off
OPEN POLE B AUX CO:
Off
OPEN POLE C AUX CO:
Off
OPEN POLE PICKUP
DELAY: 0.060 s
OPEN POLE RESET
DELAY: 0.100 s
OPEN POLE TARGET:
Self-reset
OPEN POLE EVENTS:
Disabled
GROUPED ELEMENTS
Range: Disabled, Enabled
Range: FlexLogic operand
Range: SRC 1, SRC 2, SRC 3, SRC 4
Range: 0.05 to 20.00 pu in steps of 0.01
Range: Disabled, Enabled
Range: Disabled, Enabled
Range: SRC 1, SRC 2, SRC 3, SRC 4
Range: FlexLogic operand
Range: FlexLogic operand
Range: FlexLogic operand
Range: 0.000 to 65.535 s in steps of 0.001
Range: 0.000 to 65.535 s in steps of 0.001
Range: Self-reset, Latched, Disabled
Range: Disabled, Enabled
5
5-209

Advertisement

Table of Contents
loading

Table of Contents