Sign In
Upload
Manuals
Brands
Vitrek Manuals
Measuring Instruments
95 Series
Vitrek 95 Series Hipot Testers Manuals
Manuals and User Guides for Vitrek 95 Series Hipot Testers. We have
1
Vitrek 95 Series Hipot Testers manual available for free PDF download: Operating & Maintenance Manual
Vitrek 95 Series Operating & Maintenance Manual (154 pages)
Brand:
Vitrek
| Category:
Measuring Instruments
| Size: 1 MB
Table of Contents
Table of Contents
2
About this Manual
9
Warranty Information
10
Section 1 - Product Information
11
Features
11
Available Models and Options
12
Interfacing Option
12
DC Voltage Options
12
Internal AC Voltage Options
12
Internal GROUND BOND Option
13
External AC Voltage Option
13
Pulse Testing Option
13
DUT Isolation Option
13
Terminal Option
13
Power Input Option
13
Rack Mounting Option
13
Output Voltage/Current Limiting Options
13
Section 2 - Safety
15
Power and Grounding
15
Terminals and Wiring
15
User Activated Safety Abort
16
Automatic Safety Abort
16
Section 3 -Installation
18
General Specifications
18
Initial Inspection
18
Cooling
18
Mounting Position and Orientation
19
Installing in a 19" Rack Enclosure
19
Line Power
19
Connecting Option AC-30 to the 95X
19
Section 4 - General Front Panel Operation
21
Front Panel
21
Menu Operation and Data Entry
23
Base Menu State
23
Navigating Menus
24
Modifying Menu Entries
24
Adjusting the Display Contrast
26
Locking and Unlocking Menus
26
Unlocking Menus
26
Setting, Changing or Clearing a Menu Lock Password
27
Relocking Menus
27
Unknown Menu Lock Password
28
Displaying Build Information
28
System Configuration Settings
29
Returning All Configuration Settings to Factory Defaults
30
Section 5 - Test Sequences
31
Test Sequence Configuration
32
Creating a New Test Sequence
33
Editing an Existing Test Sequence
34
Deleting an Existing Test Sequence
35
Selecting and Running an Existing Test Sequence
35
Displayed Measurement Results
36
Reviewing Test Results after Running a Test Sequence
37
Printing a Test Results Report
39
Configuring the Test Results Report
39
Manually Commanding a Test Results Report
41
Compensating for External Lead Leakage and Impedance
41
Section 6 - Test Steps
42
Choosing Within the Voltage Withstand and Leakage Testing Group
42
Choosing AC, DC or PULSE Testing
43
Choosing the Limits
43
AC Voltage Withstand and Leakage Testing (Acez, ACW and ACCAP)
46
Actions While Running
47
Configuring
47
Connecting to the DUT
50
Lead Compensation
52
Examples
52
Specifications
53
DC Voltage Withstand and Leakage Testing (Dcez, DCW and DCIR)
56
Actions While Running
57
Configuring
58
Connecting to the DUT
62
Lead Compensation
63
Examples
64
Specifications
66
Pulsed Voltage Withstand Testing (PULSE)
70
Actions While Running
71
Configuring
71
Connecting to the DUT
72
Lead Compensation
72
Examples
73
Specifications
73
DC Breakdown Voltage Device Testing (BRKDN)
74
Actions While Running
74
Configuring
75
Connecting to the DUT
75
Lead Compensation
76
Examples
76
Specifications
77
Choosing Within the Resistance Testing Group
77
DC Low Resistance Testing (Lowω)
77
Actions While Running
77
Configuring
78
Connecting to the DUT
78
Lead Compensation (2-Wire)
79
Lead Compensation (4-Wire)
80
Examples
80
Specifications
80
AC Ground Bond Testing (Gbez and GB)
81
Actions While Running
82
Configuring
82
Connecting to the DUT
83
Lead Compensation
85
Examples
85
Specifications
87
Ground Leakage Testing (DCI and ACI)
88
Actions While Running
88
Configuring
88
Connecting to the DUT
89
Lead Compensation
89
Examples
90
Specifications
91
Switch Unit Control (SWITCH)
92
Actions While Running
92
Configuring
92
Examples
93
Specifications
93
Test Sequence Timing Control (PAUSE and HOLD)
93
Configuring
93
Examples
94
Specifications
94
Section 7 - Connecting and Configuring Interfaces
95
LOCAL and REMOTE Operation
95
Controlling External Switch Matrix Units
95
Configuration
95
Connections
97
Controlling the 95X by the RS232 Interface
97
Specifications
97
Configuration
97
Connections
98
Controlling the 95X by the GPIB Interface
98
Configuration
98
Connections
99
Controlling the 95X by the Ethernet Interface
99
Specifications
99
Configuration
99
Connections
101
Printing from the 95X Using the USB Interface
101
Specifications
101
Connecting
101
Printing
102
Section 8 - Dio Interface
103
Connector and Pinout
103
Configuring
104
Signal Levels
105
Signal Isolation
106
Signal Timing
107
Starting with the START Signal
107
Aborting with the ABORT or INTERLOCK Signals
107
PASS, FAIL and TESTING Signals at the End of a Test Sequence
107
HV PRESENT and DWELL Output Signals
107
Examples
108
Section 9 - Periodic Maintenance
110
Cleaning and Inspection
110
Cable Inspection
110
Fan Filter Cleaning
110
Display Filter Cleaning
110
Terminal Inspection
111
Self Test
111
Section 10 - Performance Verification and Adjustment
112
Adjustment Calibration
112
Equipment Required
113
Procedure
114
Verifying Calibration
116
Equipment Required
117
Starting Verification
117
DC Voltage Verification
118
DC Current Scaling Verification
118
DC Current Zero Verification
119
AC Voltage Verification
119
AC Current Zero Verification
119
Low Ohms Resistance Verification
120
Ground Bond Verification
120
Option HSS Current Verification
121
Section 11 - Programming Via an Interface
123
General Command Syntax
123
Field Syntax
124
Field Separator
125
Command Separator
125
Command Terminator
125
General Response Syntax
125
Delays and Timeouts
126
Multiple Interface Operation
126
Front Panel Operation While Using Interfaces
126
GPIB Bus Commands
127
Device Clear (SDC and DCL)
127
Interface Clear (IFC)
127
Group Execute Trigger (GET)
127
Ethernet Sessions
127
Status Registers
128
STB and SRE Registers
128
OPC Register
128
ESR Register
129
ERR Register
129
Commands
130
*Idn? Response Field S
134
Acez Configuration Fields
134
ACW Configuration Fields
135
Dcez Configuration Fields
136
DCW Configuration Fields
137
DCIR Configuration Fields
138
Gbez Configuration Fields
139
GB Configuration Fields
139
Lowω Configuration Fields
140
ACCAP Configuration Fields
141
ACI Configuration Fields
142
DCI Configuration Fields
142
PULSE Configuration Fields
143
BRKDN Configuration Fields
144
PAUSE Configuration Fields
144
HOLD Configuration Fields
145
SWITCH (948I Configuration) Configuration Fields
145
SWITCH (964I Configuration) Configuration Fields
145
Test Step Status Flags
146
STEPRSLT? Response Fields
147
Programming Example
148
Programming Guidelines
149
Migrating from Earlier Firmware Versions
152
Advertisement
Advertisement
Related Products
Vitrek 944i
Vitrek 951i
Vitrek 952i
Vitrek 953i
Vitrek 954i
Vitrek 955i
Vitrek 959i
Vitrek 957i
Vitrek 956i
Vitrek 930i
Vitrek Categories
Measuring Instruments
Computer Hardware
Switch
Portable Generator
Test Equipment
More Vitrek Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL