Sign In
Upload
Manuals
Brands
Sofar Manuals
Battery Pack
ESS-215KLA-SA1
Sofar ESS-215KLA-SA1 Manuals
Manuals and User Guides for Sofar ESS-215KLA-SA1. We have
1
Sofar ESS-215KLA-SA1 manual available for free PDF download: User Manual
Sofar ESS-215KLA-SA1 User Manual (114 pages)
400V C&I Energy Storage System
Brand:
Sofar
| Category:
Battery Pack
| Size: 8 MB
Table of Contents
Table of Contents
2
About this Manual
5
Caution
5
Target Group
5
Copyright Statement
5
Symbol Explanations
5
Abbreviations
6
Revision History
6
1 Safety Precautions
7
Statement
7
Personal Safety
7
Equipment Safety
10
Energy Storage System Safety
10
Battery Safety
11
Environmental Requirements
12
2 Product Introduction
15
Product Description
15
Functions and Features
15
Description of the Model
17
System Architecture Description
19
Overall Dimension
20
Components Introduction
23
3 Transport and Storage
29
Transport Considerations
29
Storage Requirements
31
4 Installation
33
Installation Requirements
33
Installation Environment Requirements
33
Installation Operation Requirements
33
Foundation
34
Foundation Construction Requirements
34
Requirements for Installation Space
36
Recommended Foundation Drawing
39
Optional Customized Steel Base
41
Hoisting and Fixing
41
Preparation Tools
41
Check before Installation
44
Installation and Fixing Work
44
Fixed Operation of Cabinets Connection Scheme
50
Customized Steel Base Installation
52
5 Electrical Connection
55
Safety Precautions
55
Wiring Requirement
55
Short-Circuit Protection
56
Grounding Requirement
57
Antistatic Requirements
58
Wiring Preparation
58
Preparation of Installation Tools
58
Prepare Cables
59
Cable Compression and Connection
60
Open the Cabinet Doors and Equipment Compartment Doors
62
Cable Entrance Design
63
Ground Connection
63
Cable Wiring between Cabinets
64
AC Power Cord Connection of PCS
73
Signal Terminal Wiring
75
Communication Cable Connection
78
Operations after Cable Wiring
80
6 Powering up and Shutdown Operation Specificat-Ions
82
Indicator Lights and Status Descriptions
82
Power-On Operation
83
Check before Powering on
83
Steps for Powering up under Normal Conditions
84
Power-Down Operation under Normal Conditions
87
Emergency Power-Down Operation
89
Maintenance Work (Semi-Annually to Annually)
91
Maintenance Work (Every One to Two Years)
92
Maintenance Work (Every Two Years)
93
8 Monitoring System Commissioning
95
Communication Cable Wiring
95
Communication Settings
95
Login Interface
95
Home Main Interface
97
CSU System Management Interface
103
CSU System Upgrade Interface
104
CMU Homepage Main Interface
104
Status Data Display on the Home Page
105
Charge/Discharge Power Curve
105
Cumulative Charge and Discharge Quantity Statistics
105
Topological Graph
106
Control Commands
106
Operation Log
107
Fault Log
108
CMU Summary Information Screen
109
Real-Time Alarm Interface
109
Click on the Real-Time Alerts Icon
109
Parameter Configuration Interface
110
Historical Data Interface
111
Log out
113
9 Contact Information
114
Advertisement
Advertisement
Related Products
Sofar ESS-215KLA-BD1
Sofar ESS-258KLA-SA1
Sofar ESS-258KLA-BD1
Sofar ESI 3K-S1
Sofar ESI 3.68K-S1
Sofar ESI 4K-S1
Sofar ESI 4.6K- S1
Sofar ESI 5K-S1
Sofar ESI 6K-S1
Sofar ESI 4.6K-S1
Sofar Categories
Inverter
Battery Pack
Switch
Marine Equipment
Conference System
More Sofar Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL