Sign In
Upload
Manuals
Brands
Shini Manuals
Dryer
SCD-600U/400H
Shini SCD-600U/400H Manuals
Manuals and User Guides for Shini SCD-600U/400H. We have
1
Shini SCD-600U/400H manual available for free PDF download: Manual
Shini SCD-600U/400H Manual (61 pages)
Brand:
Shini
| Category:
Dryer
| Size: 4 MB
Table of Contents
Table of Contents
3
1 General Description
9
Coding Principle
10
Features
10
Technical Specifications
11
Technical Specification
11
Specifications
11
Picture 1-1: Technical Specifications
11
Drying Capacity
14
Safety Regulations
16
Safety Regulations for the Blowers
16
Picture 1-2: Safety Regulations for the Blowers
16
Safety Signs and Labels
17
Transportation and Storage of the Machine
17
Exemption Clause
19
2 Structure Characteristics and Working Principle
20
Working Principle
20
Picture 2-1: SCD Working Principle
20
Picture 2-2: SCD-OP Working Principle (with Plate Heat Exchanger) (Option)
20
Relative Humidity and Dew-Point
21
Why Choose "All-In-One" Compact Dryer
21
Options
22
3 Installation Testing
25
Machine Location
25
Picture 3-1: Installation Drawing
25
Air Pipe and Material Pipe Connection
26
Picture 3-2: Schematic Drawing of Installation (Fully-Integral Design)
26
Picture 3-3: Schematic Drawing of Installation (Semi-Integral Design)
26
Water Connections
27
Cooling Water Connection
27
Picture 3-4: Cooling Water Connection
27
Condensation Drainage Pipe
28
Power Connectors
28
Air Supply Connection
29
Notes of Optional Material Storage bin (MST-80U-OP)
29
Notes of Optional HEPA
29
Picture 3-5: Material Stage bin of Optical Grade MST-80U-OP
29
Notes for Optional SHR-CP-3U
30
Picture 3-6: High-Efficiency Filter
30
Cyclone Dust Collector
31
Picture 3-7: Important Notices for Using
31
Picture 3-8: Installation Diagram of Cyclone Dust Collector
31
Oil Filter
32
Plate Heat Exchanger
32
Picture 3-9: Installation Diagram of Oil Filter
32
Picture 3-10: Plate Heat Exchanger over Figure
32
4 Application and Operation
33
Operation Procedure for HMI
33
Description of Touch Screen
33
Touch Panel Appear Error
33
Picture 4-1: Description of Touch Screen
33
Screen Operation Flow Table
34
Menu Particular
34
System Default Screen
34
Picture 4-2: Screen Operation Flow Table
34
Picture 4-3: System Initial Screen
34
Dehumidifying Process
35
Password Unlock
35
Picture 4-4: Dehumidifying Process Screen
35
Picture 4-5: Password Input Screen
35
Picture 4-6: Drying Process
36
Picture 4-7: Parameter Setting Menu Screen
36
Picture 4-8: Time Setting Screen
37
Picture 4-9: Parameter Setting
37
Working Modes of Regeneration Heater (Dehumidifying Function)
38
Picture 4-10: Parameter Setting Screen
38
Picture 4-11: Drying Process Screen
38
Picture 4-12: Dehumidify Process Screen
39
Picture 4-13: Parameter Setting Screen
39
Picture 4-14: Drying Process Screen
40
Picture 4-15: Dehumidify Process Screen
40
Working Modes of Material Drying
41
Picture 4-16: Drying Process Screen
41
Picture 4-17: Drying Process Screen
41
Picture 4-18: Recipe Setting Screen
42
Picture 4-19: Drying Process Screen
42
Conveying Monitoring
43
Picture 4-20: Drying Process Screen
43
Picture 4-21: Conveying Monitoring Screen
43
Alarms Fault Records
44
Picture 4-22: Conveying Setting Screen
44
Picture 4-23: Alarm Fault Records
44
5 Trouble-Shooting
46
6 Maintenance and Repair
48
Filter & Pressure Regulating Valve
49
Filter & Pressure Regulating Valve Drawing
49
Filter & Pressure Regulating Valve Operation Steps
49
Air Filters
49
Picture 6-1: Filter & Pressure Regulating Valve Drawing
49
Blower Motors
50
Drying Blower
50
Regeneration Blower
50
Picture 6-2: Air Filters
50
Picture 6-3: Installation of Blowers
50
Conveying Blower
51
Blower Cleaning
51
Picture 6-4: Conveying Blower
51
Picture 6-5: Blower Motors
51
Heater Assemblies
52
Warning
52
The Useful Life of the Key Parts of the Product
52
Picture 6-6: Heater Assemblies
52
Honeycomb-Rotor
53
What Is Honeycomb-Rotor
53
Installation of the Rotor
53
Picture 6-7: Honeycomb Rotor
53
Picture 6-8: Installation of the Rotor
54
Ego
55
Picture 6-9: EGO
55
Cooler
56
Dewpoint Monitor(Option)
56
Installation for Dewpoint Monitor
56
Picture 6-10: Hole Site
56
Picture 6-11: Parts of Dew-Point Monitor
57
Picture 6-12: Copper Joint Assembly of Original Machine
57
Picture 6-13: Installation Seat
57
Picture 6-14: Installation for Transmitter
58
Picture 6-15: Connection of Signal Wire
58
Dew-Point Monitor Setting
59
Picture 6-16: Connection of Dew-Point Monitor
59
Maintenance Schedule
60
General Machine Information
60
Installation & Inspection
60
Daily Checking
60
Weekly Checking
60
Monthly Checking
61
Half-Yearly Checking
61
Yearly Checking
61
Year Checking
61
Advertisement
Advertisement
Related Products
Shini SCD-80Ux2/100H
Shini SCD-160Ux2/200H
Shini SCD-750U/400H
Shini SCD-900U/700H
Shini SCD-1200U/700H
Shini SCD-40Ux2/80H
Shini SCD-80Ux2/80H
Shini SCD-120Ux2/120H
Shini SDL-450U
Shini SCD
Shini Categories
Industrial Equipment
Dryer
Chiller
Water Heater
Heater
More Shini Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL