Sign In
Upload
Manuals
Brands
S&P Manuals
Fan
TRCe1200RTV-230-1P
S&P TRCe1200RTV-230-1P Manuals
Manuals and User Guides for S&P TRCe1200RTV-230-1P. We have
1
S&P TRCe1200RTV-230-1P manual available for free PDF download: Installation, Operation & Maintenance Manual
S&P TRCe1200RTV-230-1P Installation, Operation & Maintenance Manual (28 pages)
ENERGY RECOVERY VENTILATOR
Brand:
S&P
| Category:
Fan
| Size: 4 MB
Table of Contents
Table of Contents
4
1 Overview
6
Description
6
Airflow
7
2 Component Descriptions
7
Cabinet
7
Enthalpic Cores
7
Figure 1.2.0 TRC1200RT Airflow Orientations
7
Fan/Motor Assemblies
8
E-Box
8
Filters
8
Figure 2.4.0 E-Box with Motor Starter
8
Factory Installed Options
9
3 Shipping/Receiving/Handling
9
Unit Weights and Dimensions
9
Unit Dimensions and Weight
9
Maximum Shipping Dimensions and Weight
9
Rigging and Center of Gravity
9
TRC1200RT Hoisting Weights and COG
9
Figure 3.2.0 TRC1200RT Weights and Cogs
9
Receiving
10
Storage
10
Before You Begin
10
Service Clearances
10
Figure 4.2.0 Service Clearances, Top View
10
4 Unit Placement
11
Sound Attenuation
11
Outside the Building
11
At the Curb
11
Ducts
12
Radiated Noise
12
Connecting Horizontal Ducts to Unit
12
5 Installation
12
Curb Specifications
12
Ductwork
13
Inside Ductwork System
13
Duct Insulation
13
Use Dampers to Set and Balance Airflow Rates
13
Electrical Requirements
13
Factory-Recommended Electric Service Entry
14
Low Voltage Control System
14
Figure 5.3.0 E-Box Wiring Entry Points
14
How to Reset the 24 VAC Circuit Breaker
15
Limits of Power Output
15
Wiring Schematics
16
Figure 5.4.0 TRC1200RT Three Phase Unit, Standard
16
External Control Connections
17
Single 2-Wire Control, Unpowered
17
Control Sending 24 VAC "On" Signal
17
Control Operating on Unit's 24 VAC Power Supply
17
Figure 5.5.0 a Switch or Non-Powered Control Using Unit's 24 VAC Power Supply
17
Figure 5.5.1 24 VAC from an External Source
17
Figure 5.5.2 an External Control Using Unit's 24 VAC Power Supply
17
Control on Separate Power Supply
18
Control System Operating Isolation Dampers with End Switches
18
Quick-Start for Testing Correct 3Ph Wiring
18
Field Conversion of Openings
18
To Field Convert the Inlet Opening
18
To Field Convert the Outlet Opening
19
Figure 5.7.0 Example of Ccnverting Vertical Opening to Horizontal Opening
19
6 Operation
20
Principle of Operation
20
Pre-Start up
20
Verify Voltages
20
Verify Transformer Wiring
20
Inspect Filters
20
Inspect Foam Gasketing
20
Inspect Fans
20
Inspect and Clean the Cabinet Interior
20
Inspect Ductwork Connections
20
Measuring Airflow
21
Figure 6.4.0 Pressure Port Locations
21
Filter Pressure Drop
22
Normal Operation
22
Figure 6.4.1 Initial Pressure Drop of MERV 8 Filters, Supplied with this Unit
22
Figure 6.4.2 Initial Pressure Drop of MERV 13 Filters, Available as an Accessory
22
Operation in Extreme Cold Weather
23
7 Maintenance
23
Maintenance 24 Hrs. after Start up
23
Maintenance 30 Days after Start up
23
Maintenance Schedule
23
Filters
24
Fan Motor
24
Enthalpic Core
24
Enthalpic Core Maintenance
24
Enthalpic Core Removal
24
Enthalpic Core Replacement
24
Maintenance Records
25
Service Parts
27
8 Troubleshooting
27
Figure 7.8.0 TRC1200RT Service Parts
27
Advertisement
Advertisement
Related Products
S&P TRCe1200RT
S&P TRCe1200RTH-230-1P
S&P ERV TRC1600 P1
S&P ERV TRC1600 P3
S&P TRC1200RT
S&P TRC1200RTH-230-3P
S&P TRC1200RTV-230-3P
S&P TRCeN Series
S&P TRCeN500RT
S&P TRCeN800RT
S&P Categories
Fan
Heater
Ventilation Hood
Controller
Heating System
More S&P Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL