Sign In
Upload
Manuals
Brands
Reznor Manuals
Heater
NUDX45
Reznor NUDX45 Manuals
Manuals and User Guides for Reznor NUDX45. We have
1
Reznor NUDX45 manual available for free PDF download: Installation, Operation And Maintenance Manual
Reznor NUDX45 Installation, Operation And Maintenance Manual (44 pages)
GAS-FIRED UNIT HEATER
Brand:
Reznor
| Category:
Heater
| Size: 2 MB
Table of Contents
Table of Contents
2
General Information
3
References
3
Important Safety Information
4
Warranty
4
Model Configuration
4
Certification
5
Installation Codes
5
Heater Location
5
Heater Throw
6
Mounting Height Requirements
7
Hazards of Chlorine
7
Dimensions
8
Clearances
10
Weights
11
Combustion Air Requirements
11
Installation
12
Unpacking and Inspection
12
Pre-Installation Checklist
12
Heater Suspension
13
Suspension of Heater Using Option CK8 or CK10 Hanger Kit
14
Suspension of Heater Using Option CK22 Hanger Kit
15
Heater Suspension Using Field-Supplied Threaded Rods
15
Suspension of Heater with Downturn Nozzle
15
Vent Connections
15
Piping Connections
15
Gas Supply Pressure
15
Gas Supply Piping
16
Supply Piping Connections
16
Electrical Connections
17
Controls
19
Pressure Switch
19
High Temperature Limit Control
21
Flame Rollout Switch (UDX and UDZ Model Unit Sizes 030-125)
21
Interlock Door Switch (UBZ and UDZ Models)
21
Combination Gas Valve
21
Fan Motor
21
Venter Motor
21
Thermostat Options
22
Circuit Board (DSI Control Module)
22
Operation
23
Pre-Startup Checklist
23
Startup
23
Operating Sequences
25
Vent System Testing
27
Post-Startup Checklist
28
Adjustments
28
Pressure Switch Replacement
28
Measure and Adjust Manifold (Outlet) Gas Pressure
29
Measure and Adjust Manifold Gas Pressure-Elevation ≤2,000 Feet (≤610 Meters)
29
Measure and Adjust Manifold Gas Pressure-Elevation >2,000 Feet (>610 Meters)
31
Maintenance
33
Service Checklist
33
Maintenance Procedures
33
Burner Maintenance
33
Burner Orifice Maintenance
36
Heat Exchanger Maintenance
36
Ignition System Maintenance
36
Maintenance of Fan Motor, Fan Blades, and Fan Guard
36
Venter Motor and Wheel Assembly Maintenance
38
Combination Gas Valve Maintenance
39
Pressure Switch Maintenance
39
High Temperature Limit Control Maintenance
39
Interlock Door Switch Maintenance (Models UBZ and UDZ Only)
39
Flame Rollout Switch Maintenance (Models UDX and UDZ Unit Sizes 030-125 Only)
40
Transformer Maintenance
40
Disconnect Switch Replacement (Models UBZ and UDZ Only)
40
Vent or Vent/Combustion Air System Maintenance
40
Troubleshooting
40
General Troubleshooting
40
Unit Troubleshooting Using DSI Control Module
42
Installation Record (to be Completed by Installer)
44
Advertisement
Advertisement
Related Products
Reznor NUDX150
Reznor NUDX250
Reznor NUDX75
Reznor NUDX200
Reznor NUDX350
Reznor NUDX300
Reznor NUDX30
Reznor 100
Reznor 12
Reznor 120
Reznor Categories
Heater
Gas Heater
Furnace
Air Handlers
Electric Heater
More Reznor Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL