Sign In
Upload
Manuals
Brands
Reznor Manuals
Furnace
HRPD 250
Reznor HRPD 250 Manuals
Manuals and User Guides for Reznor HRPD 250. We have
1
Reznor HRPD 250 manual available for free PDF download: Installation, Operation And Maintenance Manual
Reznor HRPD 250 Installation, Operation And Maintenance Manual (40 pages)
OUTDOOR DUCT FURNACE
Brand:
Reznor
| Category:
Furnace
| Size: 4 MB
Table of Contents
Table of Contents
2
General Information
3
References
3
Important Safety Information
3
Important Safety Information-Continued
4
Installation Codes
4
Warranty
4
Dimensions
5
Weights
7
Clearances
7
Unit Location
7
Combustion Air Requirements
7
Hazards of Chlorine
7
Installation
8
Uncrating/Unpacking
8
Shipped-Separate Parts
8
Pre-Installation Modifications
8
High CFM Conversion
8
Reverse Airflow Conversion
11
Mounting
11
Duct Connections
11
Ductwork Requirements
12
Discharge Air Temperature Sensor Installation
13
Duct Furnace Airflow
15
Duct Furnace Blower Connections
15
Bypass Duct Construction
16
Piping Connections
18
Gas Supply Pressure
18
Gas Supply Piping
18
Supply Piping Connections
19
Electrical Connections
21
Control Wiring
21
Controls
22
Thermostat
22
Fan Control
22
Limit Control
22
Combination Gas Valve
22
Combustion Air Proving Switch
23
Optional Two-Stage Control (Heating Only Application)
23
Optional Two-Stage Control (Makeup Air Application)
23
Optional Ductstat with Capillary Tubing (Options AG3 and AG4)
25
Optional Ductstat with Electronic Remote Setpoint Module (Options AG15 and AG17)
25
Optional Electronic Modulation
25
Electronic Modulation between 50% and 100% Firing Rate (Options AG7, AG8, and AG9)
25
Computer-Controlled Electronic Modulation between 50% and 100% Firing Rate (Option AG21)
26
Electronic Modulation between 20-28% and 100% Firing Rate (Options AG39 and AG41)
26
Electronic Modulation between 20-28% and 100% Firing Rate (Options AG40 and AG42)
28
Pilot and Ignition Systems
28
Burners and Carryover System
29
Operation
29
Pre-Startup Checklist
29
Startup
30
Post-Startup Checklist
30
Adjustments
31
Measure and Adjust Manifold (Outlet) Gas Pressure
31
High Elevation (>2,000 Feet/609 Meters) Installations
31
Conversion to LP (Propane)
33
Burner Air Shutter Adjustment
33
Adjust Heat Stage Controllers (Model HRPD Units with Option AG41 or AG42)
33
Maintenance
34
Service Checklist
34
Maintenance Procedures
34
Combination Gas Valve Maintenance
34
Burner Rack Maintenance
35
Cleaning Pilot and Burners
36
Spark Ignition System Maintenance
37
Heat Exchanger Cleaning
37
Troubleshooting
39
Installation Record (to be Completed by Installer)
40
Advertisement
Advertisement
Related Products
Reznor HRPD
Reznor HRPD 300
Reznor HRPD 350
Reznor HRPD 400
Reznor HRPD 500
Reznor HRPD 600
Reznor HRPD 700
Reznor HRPD 800
Reznor HURACAN HAC
Reznor HURACAN HACE
Reznor Categories
Heater
Gas Heater
Furnace
Air Handlers
Electric Heater
More Reznor Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL