Sign In
Upload
Manuals
Brands
ProMinent Manuals
Industrial Equipment
Ultromat ATF/96 Series
ProMinent Ultromat ATF/96 Series Manuals
Manuals and User Guides for ProMinent Ultromat ATF/96 Series. We have
1
ProMinent Ultromat ATF/96 Series manual available for free PDF download: Operating Instructions Manual
ProMinent Ultromat ATF/96 Series Operating Instructions Manual (49 pages)
Three-compartment Plant for the Preparation of Polyelectrolyte
Brand:
ProMinent
| Category:
Industrial Equipment
| Size: 1 MB
Table of Contents
Table of Contents
3
General User Guidelines
6
Ultromat ® AT/96 (for Powdered Polymer Batching)
7
Transport and Storage of the Plant
7
Plant Information
7
Applications
7
Capacity
7
ATF/96 (for Powder and Liquid Polymer Batching)
8
Ultromat AT/96 Dimensions
8
Ultromat ATF/96 Dimensions
9
Description of Functions
10
Plant Construction
10
Description of Individual Units
10
Three-Compartment Tank
10
Inlet Water System and Wetting Equipmentk
10
Powder Feeder
11
Agitators
11
Control Cabinet
12
Concentrate Pipework (ATF/96 Only)
12
Plant Function
12
Operating Methods
13
Preparation Operation
13
Settings Configuration Option
13
Remote Control Option
13
Ultromat Options
13
Storage Compartment Agitator (Agitator 3)
13
Remote Control
13
Overflow Safety Cut-Out
13
Evaluation of after Dilution Unit
14
Power Socket for Automatic Hopper Loader
14
Empty Signal for Concentrate Supply Drum (Ultromat ATF Only)
14
Liquid Concentrate Dosing Monitoring (Ultromat ATF Only)
14
Ultromat Accessories
14
Detachable Hopper; 50 L, 75 L and 100 L
14
Automatic Hopper Loader for Powdered Polymers
14
BIG-BAG Batching Unit
14
Step Ladder
14
After Dilution Unit
15
Lifting Lugs
15
General Safety Guidelines
15
Assembly and Installation
16
Installation of the Plant
16
Electrical Installation
16
Connecting Mains Supply Cable
16
Opening the Controller (See Diagram 4)
16
Fitting Options
16
Controller
17
Design and Function
17
Display and Operation Module
17
Display Supplement (Displays State)
18
Operating Elements
18
Operating State Displays and Plant Operation
18
Menu System
19
Menu Layout
19
Operating the Controller - Selecting a Menu Option
19
Display Mode
20
Normal Operation
20
Interrupting Normal Operation
20
Identcode Display
20
Commissioning
20
Assembly, Initial Tasks
20
Checking Identcode
21
Start up Settings
22
Setting Feed Water Minimum Flow
22
Setting Feeder Screw Pipe Heater
22
Setting Prerinsing Time and Rinsing Delay Time
23
Agitators 1 and 2
23
Agitator 3
23
Concentrate Pump Minimum Frequency
23
Change Access Code
23
Concentration Settings
24
Calibration Settings
24
Adjust Water Flow
24
Calibration of Powder Feeder
24
Calibration of Dosing Pump for Liquid Concentrate
25
Atf)
25
Configuring Dosing Monitor for Liquid Concentrate
25
Service Menu
25
Flow Settings
25
Testing Agitator and Powder Feeder
26
Running Ultromat Empty
26
Speed Controller Settings
27
Ultromat at Configuration
27
Configuration of Ultromat
27
ATF ("Speed Controller" Control Option)
27
Level Sensor Settings
28
Commissioning
28
Operating the Plant
28
Normal Operation
28
Preconditions for Correct Operation
28
Supplying Dry Feeder with Powder
29
Switching on Mains Power and Mains Power Failure Procedure
29
Emergency Measures
29
Plant Idle
29
Operational Errors
30
Plant Malfunctions/Error Messages - Breakdown Advice
30
Fault Identification/Malfunctions/Breakdown Advice
31
Malfunctions in the Water Inlet Pipe
32
Water In-Flow Malfunctions
32
Water Meter Malfunctions
32
Solenoid Malfunctions
32
Powder-Feed Malfunctions
32
Malfunctions in the Wetting Cone
32
Malfunctions in the Storage Compartment
33
Storage Compartment Runs Dry
33
Overflow in Storage Compartment
33
Contradictory Liquid Level Messages in the Storage Compartment
33
Agitator Malfunctions
33
Concentration Errors
33
Error Messages in Initial Start up
33
Hardware Fault Analysis
34
Dilution Faults
34
Maintenance
34
Inspecting the Dry Feeder and the Wetting Cone
34
Cleaning the Filter Insert in the Pressure-Reducing Valve
34
Opening and Cleaning the Solenoid Valve
34
Dismantling and Examining the Flow Meter (Turbodos)
35
Changing the Mains Power Safety Fuse in the Controller
35
Removing the Inspection Cover on the Three Compartment Tank
35
Rinsing the Multi-Chamber Tank
35
Appendix
36
Declaration of Conformity
36
Assembly Drawing at 400
37
Assembly Drawing at 1000
38
Assembly Drawing at 2000
39
Assembly Drawing at 4000
40
Assembly Drawing at 8000
41
Assembly Drawing ATF 4000
42
Assembly Drawing ATF 1000
43
Assembly Drawing ATF 2000
44
Assembly Drawing ATF 4000
45
Assembly Drawing ATF 8000
46
Programming Menu Ultromat
47
Programming Menu Ultromat ATF/96
48
Commissioning Protocol
49
Advertisement
Advertisement
Related Products
ProMinent Ultromat ATF 400
ProMinent Ultromat ATF 1000
ProMinent Ultromat ATF 2000
ProMinent Ultromat ATF 4000
ProMinent Ultromat ATF 6000
ProMinent Ultromat ATF 8000
ProMinent Ultromat ATFP 400
ProMinent Ultromat ATFP 1000
ProMinent Ultromat ATFP 2000
ProMinent Ultromat ATFP 4000
ProMinent Categories
Water Pump
Controller
Measuring Instruments
Industrial Equipment
Accessories
More ProMinent Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL