Sign In
Upload
Manuals
Brands
NORMARC Manuals
Avionics Display
NM 7000 Series
NORMARC NM 7000 Series Avionics Display Manuals
Manuals and User Guides for NORMARC NM 7000 Series Avionics Display. We have
1
NORMARC NM 7000 Series Avionics Display manual available for free PDF download: Installation & Commissioning Handbook
NORMARC NM 7000 Series Installation & Commissioning Handbook (189 pages)
Instrument Landing System
Brand:
NORMARC
| Category:
Avionics Display
| Size: 4.29 MB
Table of Contents
Section 1 Antenna Installation Procedure
4
Table of Contents
4
1 Civil Work Checks
6
Unpacking
6
2 Localizer Antenna System Assembly
8
Positioning of Antenna Frame Work
8
Framework Assembly
8
Cable Duct Assembly
9
Antenna Assembly
9
Anntenna Cables
9
Near Field Monitor Antenna Installation
12
Cable Installation NF
12
3 Glidepath Antenna System Assembly/Towers 10M and 15M
14
General
14
Bottom Section
15
Vertical Beams
15
Bottom Flange
15
Diagonal Struts
16
Third Vertical Leg
16
Ladder
16
Locking of Nuts
16
Middle Section
16
Vertical Legs
16
Top Section
16
General
16
Horizontal Struts
16
Obstruction Light
16
Obstruction Light
17
Antenna Suport
17
Adjustment Rails
17
Mounting of Supports
17
Antenna Assembly
17
Cable Trunks
17
Cable Trunk Brackets
17
Antenna Cables
18
Antenna Mast Erection
18
Erection of the Mast
18
Locking of Nuts
18
Cable Installation into Shelter
18
Cable Tube
18
Cable Installation
18
4 Near Field Monitor
20
Cable Installation
20
NF Monitor Antenna Assembly
20
Marker Beacon Installation Antenna Assembly
22
,167$//$7,21
24
1 General
26
2 Mechanical Installation LLZ/GP
28
Mounting Kit MK1343A
28
Moving RF Connectors
29
3 Electrical Installation LLZ/GP
32
Connection Overview
32
Power and Battery
33
RF Inputs
35
RF Outputs
35
DC Loop (Localizer Only)
36
Remote Control ( CABINET)
37
PC and Modem
38
DME (Localizer Only)
39
Analog Inputs
41
Digital Inputs and Outputs
42
Battery Warning
43
4 Mechanical Installation Marker Beacon
44
Marker Beacon Cabinet
44
5 Electrical Installation Marker Beacon
46
Marker Beacon Cabinet
46
Connection Overview
46
RF in and out
47
Battery
47
Mains
48
Remote Control Cabinet
50
PC and Modem
51
Analogue Inputs
53
Digital Inputs and Outputs
54
6 Remote Control Connections (TWR)
56
Remote Master Connection
56
Power Supply Connection
57
Remote Slave Connection
58
Interlock Switch Connection
59
Section 3 Antenna Systems Adjustments Procedure
60
NM 3522 6 Elements Antenna System Adjustments - LLZ
66
Mechanical Alignment of Antenna Array
66
Right Angle Points with Reference to Runway Center Line
66
Spacing Distance between Lpda's
66
Vertical Alignment of LPDA Support Masts
66
Azimuth Alignment of Lpda's
66
Electrical Measurements
66
CSB and SBO Cables
66
CSB/SBO Phasing
67
Antenna Cable Lengths (Electrical Phase Equality)
67
Antenna Pair Phasing
67
Phase and Amplitude Transfer Measurement
69
Antenna Return Loss
70
Course Sector Width Adjustment
70
DDM Check of ADU O/P (Output Port)
71
DDM Field Check
72
Monitor Combining Unit (MCU) Adjustments
72
Course Line
72
Course Sector
72
Near Field Monitor Adjustments
72
Mechanical Alignment
72
Final Electrical Position Adjustment
72
DC-Loop Adjustment and Testing
73
DC-LOOP Adjustment
73
Antenna Fault Condition Testing
73
NM 3523B 12 Elements Antenna System Adjustments - LLZ (Single Frequency)15
74
Mechanical Alignments of Antenna Array
74
Right Angle Points with Reference to Runway Centre Line
74
Spacing Distance between Lpda's
74
Vertical Alignment of LPDA Support Masts
74
Azimuth Alignment of Lpda's
74
Electrical Measurements
74
CSB and SBO Cables
74
CSB/SBO Phasing
75
Antenna Cable Lengths (Electrical Phase Equality)
75
Antenna Pair Phasing
75
Phase and Amplitude Transfer Measurement
77
Antenna Return Loss
77
Course Sector Adjustment
78
DDM Check of ADU O/P
78
DDM Field Check
79
Monitor Combining Unit (MCU) Adjustments
80
Course Line
80
Course Sector
80
Near Field Monitor Adjustments
80
Mechanical Alignment
80
Final Electrical Position Adjustment
80
DC-Loop Adjustment and Testing
80
DC-LOOP Adjustment
80
Antenna Fault Condition Testing
80
NM 3524 12 Elements Antenna System Adjustments - LLZ (Dual Frequency)
82
Mechanical Alignment of Antenna Array
82
Right Angle Points with Reference to Runway Centre Line
82
Spacing Distance between Lpda's
82
Vertical Alignment of LPDA Support Masts
82
Azimuth Alignment of Lpda's
82
Electrical Measurements
82
CSB and SBO Cables
82
CSB/SBO Phasing
83
Antenna Cable Lengths (Electrical Phase Equality)
83
Antenna Pair Phasing
84
Phase and Amplitude Transfer Measurement
85
Antenna Return Loss
86
Course Sector Width Adjustment
86
DDM Check of ADU O/P
87
Clearance SBO Power
104
DDM Field Check
104
Monitor Combining Unit (MCU) Adjustments
104
Course Line
104
Course Sector
104
Near Field Monitor Adjustments
105
Mechanical Alignment
105
Final Electrical Position Adjustment
105
DC-Loop Adjustment and Testing
105
DC-LOOP Adjustment
105
Antenna Fault Condition Testing
105
Clearance
105
Electrical Measurements
106
Antenna Cable Lengths (Electrical Phase Equality)
106
Preparation of Mechanical- and Electrical Data
106
Forward Shift (FWD)
106
Antenna Heights
106
Antenna Offsets
106
Mechanical Alignment of Mast and Antennas
106
Monitor Return Cable Length
107
Phase and Amplitude Transfer Measurement
107
Antenna Return Loss
108
CSB/SBO Phasing and Sector Width Adjustment
108
CSB/SBO Phasing
108
Sector Width Adjustment
109
Monitoring Combining Unit (MCU) Adjustments
110
Procedure
110
Location of Near Field Antenna Position
110
SBO Power Adjustment
115
Monitor Combining Unit (MCU) Adjustments
115
Procedure for Horizontal Terrain (FSL = 0°)
115
Procedure for Sloping Terrain (1° > FSL > -1°)
115
Location of Near Field Antenna Position
116
Near Field Monitor Position Search
117
Antenna Distribution Unit (ADU) Phase and Amplitude Check
118
Preparation
118
Procedure
118
NM 3545 M-Array Antenna System Adjustments - Glide Path
120
Mechanical Alignment of Mast and Antennas
120
Preparation of Mechanical- and Electrical Data
120
Forward Shift (FWD)
120
Antenna Heights
120
Antenna Offsets
120
Initial Electrical Measurements
120
Antenna Cable Lengths (Electrical Phase Equality)
120
Monitor Return Cable Length
121
Phase and Amplitude Transfer Measurement
121
Antenna Return Loss
122
CSB/SBO Phasing
122
CSB and SBO Cables
122
Sector Width Adjustment
123
SBO Power Adjustment
123
Monitor Combining Unit (MCU) MOA 338D Adjustments
123
Adjustments Procedure
124
Location of Near Field Antenna Position
124
Near Field Monitor Position Search
124
Antenna Distribution Unit (ADU) DIA 346A Phase and Amplitude Check
125
Preparation
125
Procedure
126
NM 3561 Single Antenna System Adjustments - MKR
128
Mechanical Alignment
128
Antenna Mast
128
Electrical Measurements
128
Antenna Return Loss
128
Section 4 Test and Adjustements
133
1 Tests and Adjustments LLZ/GP
135
Configuration Settings
135
ILS Configuration
135
Remote Ports Access Level Configuration
136
Warning Configuration
136
Transmitter Alignments and Calibration
136
RF Phase Feedback Adjustment
137
RF Power
138
LF Phase Adjustment
138
RF Power Balance Adjustment
139
RF Phase at Combiner I/P
140
SDM Calibration
141
DDM Calibration
141
Ident Tone Modulation Depth
142
RF Frequency Adjustment
142
Antenna System Adjustments
142
Monitor Alignment and Calibration
143
General
143
RF Input Level Adjustment
143
AGC Time Adjustment
144
SDM Adjustment
144
DDM Adjustment
144
Monitor Alarm Setting Procedure
145
Maintenance Limit Adjustments
146
Adjustment Points
147
2 Tests and Adjustments Marker Beacon
151
Preparations
151
Configuration Settings
151
Adjustment Points
154
Adjustments at Installation
155
Transmitter Output Power Adjustment
155
Monitor Calibration
156
Other Adjustments
156
Output Power Readout Calibration
156
Battery Protection Cut-Off Voltage
157
Battery Charger Voltage
157
Advertisement
Advertisement
Related Products
NORMARC 7013
NORMARC Categories
Avionics Display
Security System
Transmitter
Shelters
More NORMARC Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL