Sign In
Upload
Manuals
Brands
Nilar Manuals
Camera Accessories
FERROAMP EC HomeBox 6kWh
Nilar FERROAMP EC HomeBox 6kWh Manuals
Manuals and User Guides for Nilar FERROAMP EC HomeBox 6kWh. We have
2
Nilar FERROAMP EC HomeBox 6kWh manuals available for free PDF download: Instruction Manual, Quick Installation Manual
Nilar FERROAMP EC HomeBox 6kWh Instruction Manual (44 pages)
Brand:
Nilar
| Category:
Audio & Video Accessories
| Size: 3.5 MB
Table of Contents
Table of Contents
5
1 Safety Information
10
Safety Markings in this Instruction
10
General Warnings and Cautions
10
2 Warranty
11
3 Environment
12
Compliance
12
Cabinet
12
Battery Management System (BMS)
12
Battery Pack
12
Integrated Monitoring Unit (IMU)
12
4 Function Description
13
Figure 1: Nilar Hydride® Battery Pack 144VDC (12 Modules)
13
Figure 2: Nilar EC Homebox 6Kwh - Ferroamp
13
Figure 3: General Schematic Overview
14
General Schematic Overview
14
System Specification
14
Table 1: Specification for Nilar Homebox
14
Battery Pack Specification and Build-Up
15
Battery String
15
Figure 4: Homebox Unit Measurements (Incl. Mounting Brackets)
15
Figure 5: Measurement Illustration of 144V Battery Pack with Length Incl. and Excl. IMU (Excl. Insulation Tray)
15
Measurements
15
Figure 6: 144VDC Battery Pack with IMU on Front
16
Figure 7: Disconnection of Cable Connectors
16
Integrated Monitoring Unit (IMU)
16
Connections IMU
17
Figure 8: Overview of IMU with Cover Lid Removed
17
Table 2: Description of Visual Signals
17
Figure 9: Indicated Connection Points of IMU '1' Indicates Pin 1 of Connection
18
5 Transportation, Lifting and Storage
19
Figure 10: Orientation of Battery Pack
19
Transportation
20
Moving and Lifting
21
Storage
21
Figure 11: Battery Pack Incl. Lifting Straps
21
Table 3: Relation between Temperature and the Recommended Maximum Storage Time at 75% SOC Initial Capacity
21
6 Installation
22
General Conditions on Site
23
Scope of Supply
23
Figure 12: Scope of Supply
23
Table 4: Denomination Table
23
Placement
24
Adjustment
24
Figure 13: Nilar Homebox with Indicated Minimum Distances to Neighbouring Objects
24
Figure 14: Indication of Support Legs
24
Attachment
25
Dismantling of Cabinet Prior to Installation
25
Figure 15: Mounting Brackets for Wall Attachment
25
Figure 16: Removal of Cover Lid
25
Figure 17: Dismantling of Corner Tops
26
Figure 18: before and after Removal of Side Plate with Indicated Suspension
26
Figure 19: before and after Removal of Front Plate with Indicated Suspension
27
Figure 20: before and after Removal of Top Plate
27
Figure 21: before and after Removal of BMS Cover
27
Power Connection of Ferroamp Energyhub to BMS
28
Figure 22: Location of Cable Entry for Ferroamp Energyhub Power Cable on the Backside of the Cabinet
28
Figure 23: Location of the Connection Terminals for Ferroamp Energyhub Power Cable
28
Figure 24: Dedicated Terminal for Positive (+) Wire
28
Communication
29
Figure 25: Dedicated Terminal for Negative (-) Wire
29
Figure 26: Dedicated Terminal for PE Wire
29
Figure 27: General Overview of the Communication Loop
29
Figure 28: Location of RJ45 Port for Internet Connection
29
Preparation of Connections Prior to Installation
30
Placement of Battery Packs
30
Figure 29: Placement of Battery Pack in Insulation Tray
30
Connection of Battery Packs
31
Figure 30: Placement of Battery Packs W. Trays in Cabinet
31
Figure 31: Attached and Installed Battery Packs with Insulation Trays
31
Figure 32: Position of PCB Connectors
31
Figure 33: Battery String Sorted According to Labeling
32
Figure 34: before and after IMU Cover Lid Removal
32
Figure 35: Installation of Current Sensor Cable on IMU
32
Figure 36: Installation of Ingoing Canopen Communication Cable into CAN2 Socket on IMU
33
Figure 37: Installation of Fan Connection on IMU
33
Figure 38: Installation of 24VDC Power Supply Connection on IMU
33
Figure 39: Installation of Ambient Temperature Sensor Connection on IMU
34
Figure 40: Detail View of Cable Entry on Cover Lid of IMU
34
Figure 41: Installed Negative (-) Cable (IMU Connections Are Not Displayed)
35
Figure 42: Installed Interpack Cable between Battery Pack 'A' and 'B' (IMU Connections Are Not Displayed)
35
Figure 43: Installed Interpack Cable on Positive (+) Terminal for Battery Pack 'B' (IMU Connections Are Not Displayed)
36
Figure 44: Installed Interpack Cable on Negative (-) Terminal for Battery Pack 'C' (IMU Connections Are Not Displayed)
36
Figure 45: Installed Interpack Cable between Battery Pack 'C' and 'D' (IMU Connections Are Not Displayed)
36
Figure 46: Current Sensor
37
Figure 47: Installed Positive (+) Cable Including Current Sensor (Remaining IMU Connections Are Not Displayed)
37
Figure 48: Location of Battery String and Energyhub Fuses Within the BMS
37
Assembly of Cabinet
38
7 Operation
39
Checklist for Operation
39
8 Maintenance
40
Protective Measures During Maintenance
40
Inspection and Monitoring
40
9 Decommissioning
41
Temporarily Decommissioning
41
Permanent Decommissioning
41
Figure 49: WEEE Symbol
41
10 Troubleshooting
42
Advertisement
Nilar FERROAMP EC HomeBox 6kWh Quick Installation Manual (16 pages)
Brand:
Nilar
| Category:
Camera Accessories
| Size: 3.18 MB
Advertisement
Related Products
Nilar 210016E
Nilar 210016EP
Nilar Home Box 288VDC
Nilar Categories
Battery Pack
Camera Accessories
Portable Generator
Audio & Video Accessories
More Nilar Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL