Sign In
Upload
Manuals
Brands
Lucent Technologies Manuals
Camera Accessories
415B Battery Plant
Lucent Technologies 415B Battery Plant Manuals
Manuals and User Guides for Lucent Technologies 415B Battery Plant. We have
1
Lucent Technologies 415B Battery Plant manual available for free PDF download: Product Manual
Lucent Technologies 415B Battery Plant Product Manual (150 pages)
Brand:
Lucent Technologies
| Category:
Camera Accessories
| Size: 1 MB
Table of Contents
Table of Contents
5
List of Figures
11
Battery Plant
15
Introduction
15
Product Manual
15
Applications
16
Figure 1-1: 415B Battery Plant
16
Installation and Testing
16
Customer Assistance Contacts
17
Customer Service
17
Customer Training
17
Product Repair and Return
17
Technical Support
17
On-Line Power Systems Product Manuals
18
Warranty Service
18
Battery Plant Overview
19
Power Distribution Service Cabinet (PDSC)
19
System Description
19
Figure 2-1: Typical 415B Battery Plant AC Feeds
20
Alarm Panel
21
Control and Distribution Bay
21
DC/DC Converters
21
Distribution Breakers
21
Galaxy Controller
21
Plant Shunt
21
Battery Equalize/Boost Feature
22
Battery Strings
23
Capacitors
23
Load Capacitor Charge Tool
23
MOV Assembly for PDF Frames
23
Remote Peripheral Monitoring Unit
23
Shunts
23
Design
24
Documentation References
24
Enhanced Ground Current Monitor
24
Admonishments
27
Information
27
Rubber Gloves
27
Safety
27
Safety Statements
27
Precautions
28
Personal Safety
29
Warning Statements and Safety Symbols
30
Electrostatic Discharge (ESD)
31
Required Tools
33
Safety
33
System Installation
33
Unpacking Equipment
33
Figure 4-1: Bracket Mounting Locations
34
General Installation
34
4ESS ™ ™ ™ ™ ™ ™ ™ ™ ™ ™ ™ ™ ™ ™ ™ ™ ™ ™ ™ ™ ™ Configurations
35
Figure 4-2A: AC Distribution Floor Mounting Configuration
35
Figure 4-2B: AC Distribution Wall Mounting Configuration
35
And Distribution Bay
36
Figure 4-3: Typical Floor Mounting Detail
36
Figure 4-4: Floor Mounting Template for Control
36
(K1 Contactor)
38
Alarms
38
Figure 4-6: Connecting the AC to the Rectifier
38
Figure 4-7: Connections for the RPM
40
Power up of 415B Battery Plant
45
Distribution Frames
47
Table 5-A: DIP Switch Default Settings
47
Control and Distribution Bay Precharge Procedure
49
Pre-Test Setup
50
Rectifier Tests
50
System Test Procedures
50
Current Limit Adjustment
51
Rectifier Walk-In
51
Buhvsd
53
FA Test
53
Ishvsd
53
Rectifier Equalize Adjustment (on Battery)
54
AC Failure Test
55
Table 5-B: Load Settings for AC Failure Test
55
Galaxy Controller
56
Table 5-C: Circuit Packs/Kit Furnished with the Galaxy Controller
56
Table 5-D: Optional Circuit Packs for the Galaxy Controller
56
Galaxy Readouts
57
AC Fail (ACF) Leads
58
Galaxy and Rectifier Interface Leads
58
CB Leads
59
PH Leads
59
HV and RS Leads
60
TR and TRH Leads
60
VI and VP Leads
60
Circuit Breaker Panel
63
Control and Distribution Bay
63
Equalize/Boost Leads
63
BD and VLV Alarms
65
Miscellaneous Alarms
65
Checking High and Low Alarm Set Points
71
Life Test
71
Heat Scan
72
Capacitor Charging from the Power Distribution Frame
73
Connecting Telecommunication Loads to
73
The Power Distribution Frame
73
Configuration 2 (Adding Two Rectifiers)
75
Retrofit Configurations
75
Retrofit of 415A Battery Plant
75
Figure 7-1: Three Configurations of the 415B Battery Plant
77
Group 3
80
5-Rectifier Plant)
81
Group 4 or 5
81
Figure 7-2: H569-429 Groups 3, 4, or 5
82
Figure 7-3: Typical 415B Retrofit Battery Plant AC Feeds for Total Replacement
84
Required Tools
85
Retrofit System Installation and Testing for One or Two Rectifiers
85
Unpacking Equipment
85
Figure 7-4: Retrofit with One or Two Rectifiers
86
Figure 7-5: Bracket Mounting Locations
87
Mounting Brackets on Control and Distribution Bay
87
Bolting Hardware
88
Figure 7-6: Typical Floor Mounting Detail
88
(K1 Contactor)
89
Figure 7-8: Connecting AC to the Rectifiers
89
Rectifier and AC Connections
89
Rectifier Output Connections for One Rectifier
90
Retrofit Connections for the Group 3 to the 415A
90
Second Rectifier Addition
90
Shunt Connections
90
System (Adding One or Two Rectifiers)
90
Sense Voltage Connections
91
Table 7-A: BJT1 Connections
92
Required Test Equipment
93
Testing for Group 3 (One or Two Rectifiers)
93
Connections
96
Startup
96
Table 7-B: Test Set Connections
96
Control Board
97
Figure 7-9: Partial Sketch of CM2 (208G)
97
Figure 7-10: CM1 (329B) Fuse Board
98
Internal Tests
98
Control Test
99
HV Shutdown and Restart
99
Figure 7-11: Partial Sketch of CM3 Digital Meter Board
100
Phase Failure Test
100
And VP Test Leads
102
Current Limit Adjustment
102
Required Tools
105
Unpacking Equipment
105
Figure 7-12: Bracket Mounting Locations
106
Figure 7-13A: AC Distribution Floor Mounting Configuration
107
Figure 7-13B: AC Distribution Wall Mounting Configuration
107
And Distribution Bay
108
Figure 7-14: Typical Floor Mounting Detail
108
Figure 7-15: Floor Mounting Template for Control
108
Figure 4-5: AC Breaker Locations with Spare
109
Figure 7-17: Connecting the AC to the Rectifier (K1 Contactor)
110
Figure 7-18: Connections for the RPM
112
For 208G Circuit Module
117
Table 7-C: DIP Switch Default Settings
117
Table 7-D: Load Settings for AC Failure Test
126
Table 7-E: Circuit Packs/Kit Furnished with the Galaxy Controller
127
Table 7-F: Optional Circuit Packs for the Galaxy Controller
127
Figure 5-1: Circuit Breaker Feeds to Power
135
Figure 7-19: Circuit Breaker Feeds to Power Distribution Frames
135
Table 8-A: Reference Documentation
145
Advertisement
Advertisement
Related Products
Lucent Technologies 4VR125E
Lucent Technologies 4VR125EL
Lucent Technologies MERLIN 410
Lucent Technologies PARTNER II Release 4.1
Lucent Technologies 4406D+
Lucent Technologies 4424D
Lucent Technologies 4ESS
Lucent Technologies 4ESS SCS
Lucent Technologies PortMaster 4
Lucent Technologies 4424D+
Lucent Technologies Categories
Telephone
Switch
Conference System
Software
Telephone System
More Lucent Technologies Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL