Sign In
Upload
Manuals
Brands
horsch Manuals
Farm Equipment
LEEB 12 TD
horsch LEEB 12 TD Manuals
Manuals and User Guides for horsch LEEB 12 TD. We have
1
horsch LEEB 12 TD manual available for free PDF download: Operating Instructions Manual
horsch LEEB 12 TD Operating Instructions Manual (181 pages)
Brand:
horsch
| Category:
Farm Equipment
| Size: 19 MB
Table of Contents
Table of Contents
6
Introduction
10
Foreword
10
Notes on Representation
10
Service
11
Warranty Claim Processing
11
Consequential Damage
11
Safety and Responsibility
12
Intended Use
12
Qualification of Personnel
13
Children in Danger
14
Personal Protective Outfit
14
Safety in Traffic
14
Safety in Operation
15
Crop Protection Agents and Liquid Fertiliser
19
Environmental Protection
20
Retrofitting and Conversions
20
Care and Maintenance
20
Danger Zone
22
Safety Stickers
23
Commissioning
28
Delivery
28
Transport
28
Installation
28
Initial Commissioning of the Service Brake System
29
Initial Commissioning of the Suspension
29
Adjusting the Hydraulic System on the Hydraulic Valve Block
30
Assemble the Wheels
30
Technical Data
31
Dimensions
33
Permissible Total Weight and Tyres
34
Noise Development Data
37
Required Tractor Equipment
37
Design
39
Overview
39
Hydraulics
40
Safety and Protective Features
41
Fluid Circuit - Construction Elements on Machines of the CCS Pro Variant
42
Two-Tank System with Variant CCS Pro
43
Supply Lines between Tractor and Machine
43
Traffic Compliant Equipment
44
Instruction Stickers
46
Components
47
Drawbar and Connecting
47
Hydraulic Support
47
Shut-Off Valve (Only for Machines with Passive Follow-Up Steering)
48
Hydraulics Lockout Switch
48
Steering
49
Vehicle Version Passive Follow-Up Steering
49
Vehicle Variant Active Steering of both Axles (Option)
50
Adjusting the Mechanical Steering End Stop
51
Trailing Control on Hillside Locations Via Manual Control
51
Hydropneumatic Suspension
52
Brake System
53
Automatic Load Dependent Brake Pressure Regulator (ALB)
54
Connection of Brake System
55
Uncoupling the Brake System
56
Spraying Mixture Container
56
Fresh Water Tank
57
Access Steps
58
Platform
58
Dome
59
Hand Washing Tank
59
Spraying Pump
60
Piston Diaphragm Pump
61
Illuviation Valve
61
Stainless Steel Induction Hopper
63
CCS - Continuous Inside Cleaning
64
External Cleaning System (Option)
64
Agitator
65
Filter
66
Control Unit
68
Main Control Terminal
68
Multi-Function Handle
69
Default Assignment Multi-Function Handle
70
Transport, Document and Safety Container
71
Document Roll
71
Lifting Points
72
Folding Boom
73
Folding Variants - Folding Boom
74
Boomcontrol
76
Transport Lock
77
Collision Protection
79
Spraying Line
80
Nozzle Body
81
Optional Equipment
84
Hydraulic Connections
84
Coupling Hydraulic Hoses
84
Uncoupling Hydraulic Hoses
84
PTO-Shaft Pump (Optional)
85
Hydraulic Compressor (Optional)
86
GPS Receiver (Optional)
89
Camera (Optional)
91
Wind Meter (Optional)
91
Edge and Border Nozzles
92
Sectionbox (Optional)
93
Nightlight (Optional)
94
Automatic Tyre Pressure Control (ATP) (Optional)
95
Pack Storage (Optional)
96
Operation
97
Commissioning / Tractor Change
97
Connecting/Parking
97
Connecting
98
Transport Position
99
Parking
100
Manoeuvring the Uncoupled Machine
100
Folding the Folding Boom
101
Unfolding
102
Folding
102
Preparation for Spraying Operation
103
Calculating Filling / Refill Quantities
105
Filling Table for Residual Areas
106
Filling the Spraying Mixture Container through the Filling Port
108
Direct Filling / External Filling (Optional)
108
Filling Via the Filling Dome
109
Filling the Fresh Water Tank through the Filling Port
109
Illuviation of Preparations
110
Illuviation Valve
110
Flushing in Liquid Preparations During the Filling Process on Machines of the CCS Pro Variant
111
Flushing in Liquid Preparations for Full or Partly Filled Spraying Mixture Container on Machines of the CCS Pro Variant
112
Illuviation of Powdery Preparations and Carbonyl Diamide on Machines of the CCS Pro Variant
113
Pre-Cleaning the Canister with Spraying Mixture
113
Canister Cleaning with Fresh Water
114
Spraying Operation
114
Special Notes for Spraying Operation
114
Folding Boom Control
115
Spraying Pressure, Nozzle Size, Placing Quantity, Travel Speed, Agitator
115
Spraying
116
Measures for Windward Drift Reduction
117
Spraying with 25 CM Nozzle Spacing and Reduced Target Area Distance
117
Draining the Spraying Mixture Container Via the Pressure Output
117
Faults
119
Nozzle Selection
120
Residual Quantities
126
Technical Residual Quantities
126
Draining off Technical Residual Quantities
126
Draining of Technical Residual Quantities on Machines of the CCS Pro Variant
126
Diluted Residual Quantity
127
Draining the Fresh Water Tank
127
Cleaning
128
CCS - Continuous Inside Cleaning
129
(Continuous Cleaning System)
129
Cleaning the Filter
130
Cleaning the Sprayer with the Tank Empty
131
Cleaning the Sprayer with the Tank Filled
132
Folding Boom Cleaning with "Air Valve" (Option)
133
Changing the Track Width
134
Care and Maintenance
135
Maintenance Overview
138
Ball-And-Socket Coupling
140
Lubrication Instructions
143
Overview of Lubrication Points Basic Machine
145
Overview of Lubrication Points Middle Section
147
Overview of Folding Boom Lubrication Points
149
Maintenance of Brake System
153
General Visual Inspection
153
Inspection of Brake Lining
154
Brake Adjustment
154
Air Vessel
154
Test Instructions for Dual Line
155
Service Brake System (Workshop Work)
155
Maintenance of Axle
155
Checking the Bearing Play of the Wheel Hub (Workshop Work)
155
Check the Wheel Hub Bearing Clearance (Workshop Work)
156
Replacing the Grease of the Wheel Hub Bearing
156
Axle Adjustment (Workshop Work)
158
Maintenance of the Hydraulic System
159
Inspection Criteria for Hydraulic Hoses
160
Assembly and Disassembly of Hydraulic Hoses
160
Replacing the Pressure Filter of the Hydraulic System
161
Calibrating the Flow Meter
161
Wheels and Tyres
162
Changing Wheels
162
Autonomous Hydraulic System (Optional)
164
PTO-Shaft Pump Oil Change
164
Inspection of the Crop Protection Sprayer
164
Pump Capacity Test
164
Flow Meter Test
165
Storage
166
At the End of the Season
166
Drain
166
Draining the Spraying Mixture Container
166
Draining the Fresh Water Tank
166
Putting the Sprayer System into Winter Storage
167
Before the New Season
168
Waste Disposal
170
Appendix
171
Tightening Torque
171
HORSCH Leeb Metering Cup
173
Determining the Placing Quantity in L/Ha
173
Nozzle Selection and Control
173
Liquid Fertiliser Operation
174
Index
176
Advertisement
Advertisement
Related Products
Horsch LEEB LT
Horsch LEEB GS
horsch Leeb 8 GS
horsch Leeb 7 GS
horsch LEEB 7.300 PT
horsch Leeb 6.280 VL
horsch Leeb 8.280 VL
horsch Leeb 5.300 VL
horsch Leeb 6.280 VN
horsch Leeb 5.300 VN
horsch Categories
Farm Equipment
Seeders
Control Unit
Paint Sprayer
Tiller
More horsch Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL