Sign In
Upload
Manuals
Brands
Hoppecke Manuals
Battery Pack
grid power VR X FT
Hoppecke grid power VR X FT Manuals
Manuals and User Guides for Hoppecke grid power VR X FT. We have
1
Hoppecke grid power VR X FT manual available for free PDF download: Design Installation, Commissioning And Operating Instructions
Hoppecke grid power VR X FT Design Installation, Commissioning And Operating Instructions (58 pages)
Valve-regulated stationary lead-acid batteries
Brand:
Hoppecke
| Category:
Battery Pack
| Size: 2 MB
Table of Contents
Table of Contents
2
Preface
5
Safety Notices
6
Explanation of the Symbols Used in the Manual
6
Explanation of the Symbols Used on the Battery
7
General Information
7
Personal Protective Equipment, Safety Clothing, Equipment
8
Safety Precautions
9
Sulfuric Acid
9
Explosive Gase
9
Electrostatic Discharges
9
Electric Shock and Burns
10
General Information
11
Specifications
11
Disposal and Recycling
12
Service
13
Warranty
13
References to the Standards and Regulations
14
CE and UKCA Marking
15
Transport
15
General Information
15
Delivery Completeness and Externally Visible Damage
16
Defects
16
Storage
16
General Information
16
Storage Time
17
Recharge
18
Installation
19
Requirements for the Installation Site
19
Ventilation of the Battery Room
20
Avoidance of Explosion Hazards
21
Calculating Ventilation Requirements for Battery Rooms
21
Calculating the Safety Distance
23
Tools and Equipment to Carry out the Installation
24
Commissioning and Maintenance Protocol
25
Installing Racks and Cabinets
25
General Information on Connecting the Batteries
26
Installing the Batteries
27
Inserting Batteries into the Racks
28
Horizontal Installation
29
Open-Circuit Voltage Measurement
31
Connecting Batteries
32
Connection Terminals
32
Type of Connecting Cables
32
Connect Batteries to Battery Connectors
33
Installing the Screw Connectors
33
Clamp the Connection Plates to the Batteries
35
Connect the Battery System to the DC Power Supply
37
Commissioning Charge (Initial Charge)
38
Commissioning Charge with Constant Voltage (IU Characteristic Curve)
38
Extended Commissioning Charge
39
Battery Operation
39
Modes
39
Standby Parallel Operation
39
Floating Operation
40
Switch Mode Operation (Charge/Discharge Operation)
40
General Information on the Operation
41
Discharging
42
Charging - General
42
Float Charging
43
Float Voltage
44
Equalizing Charge (Correction Charge)
44
Battery Maintenance
46
Cleaning the Battery
47
Check the Battery System
47
Preparing the Battery System for Capacity Testing
47
General Information on How to Carry out the Capacity Check
49
Implementation of the Capacity Test and Evaluation
50
Notes on Impedance Measurement
52
Troubleshooting
52
Scattering of the Individual Cell Voltages
52
Available Capacity too Low
53
Insulation Resistance too Low
53
Battery Voltage Not Measurable
53
Replacement of a Cell/Battery in the String
54
Disassembly
55
Parameter Data Sheet for Sun | Power VR Batteries
56
Advertisement
Advertisement
Related Products
Hoppecke grid XtremeStack
Hoppecke grid power VX
Hoppecke grid power V L
Hoppecke grid power V H OGi bloc
Hoppecke grid power V M
Hoppecke grid power V H
Hoppecke grid power VR L
Hoppecke grid power VR M
Hoppecke grid power VR X
HOPPECKE grid|power FNC
Hoppecke Categories
Battery Pack
Camera Accessories
Battery Charger
Inverter
Industrial Equipment
More Hoppecke Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL