Sign In
Upload
Manuals
Brands
GEZE Manuals
Control Systems
myGEZE Control maximum system expansion
GEZE myGEZE Control maximum system expansion Manuals
Manuals and User Guides for GEZE myGEZE Control maximum system expansion. We have
1
GEZE myGEZE Control maximum system expansion manual available for free PDF download: User Manual
GEZE myGEZE Control maximum system expansion User Manual (104 pages)
Building automation and control system
Brand:
GEZE
| Category:
Control Systems
| Size: 7 MB
Table of Contents
Table of Contents
2
1 Introduction
4
Symbols and Illustrations
4
Reference Documents
4
2 Safety
5
Safety Notes
5
Intended Use
6
3 Functions and Properties
7
Modular Principle
7
Control Unit Components
7
Power Supply (Depending on the Version)
7
Terminals
7
Standard Control Units
8
Distributor
8
4 Installation
9
Equipment and Configuration of the Control Unit
9
Space Required for the Bus Terminals and Components on the Top hat Rail (Width)
10
Fig. 1: Mounted Terminals
10
Fig. 2: Standard Power Supply
10
Layout of the Terminals on the Top hat Rail
11
Changing the Module Configuration/System State
11
Approved Type of Installation / Minimum Distances
12
Fig. 3: Type of Installation at Temperatures up to 60°C
12
Installation / Removal
13
Fig. 4: Installation
13
Fig. 5: Disassembly
13
Wiring
14
Fig. 6: Wiring
14
Connection of the Control Unit
15
Mains Connection
15
Connecting External Components
15
5 Hardware Description
16
Mygeze Control CPU MODULE 8191
16
Fig. 7: Mygeze Control CPU MODULE 8191
16
Fig. 8: DIP Switch S101, Switches 1 to 10
18
Mygeze Control CAN MASTER TERMINAL
19
Fig. 9 : Mygeze Control CAN MASTER TERMINAL
19
Mygeze Control CAN Connector
21
Fig. 10 : Mygeze Control CAN Connector
21
Fig. 11: Mygeze Control CAN Connector Connection Illustration
22
Mygeze Control KNX-System
23
Fig. 12 : Mygeze Control KNX System
23
Fig. 13: Structure Bus Terminals for Communication with KNX
24
Fig. 14: LED Indicators KNX
25
Fig. 15: Example Structure for Communication with KNX
26
Fig. 16: LED Indicators KNX
27
Mygeze Control 8-Channel Digital Input Terminal
28
Fig. 17 : Mygeze Control 8-Channel Digital Input Terminal
28
Fig. 18: LED Indicators KNX
29
Mygeze Control Potential Distribution Terminal 24 V DC
30
Fig. 19 : Mygeze Control Potential Distribution Terminal 24 V DC
30
Mygeze Control Potential Distribution Terminal 0 V DC
31
Fig. 20: Mygeze Control Potential Distribution Terminal 0 V DC
31
Mygeze Control Output Terminal 2-Channel Relay
32
Fig. 21 : Mygeze Control Output Terminal 2-Channel Relay
32
Mygeze Control Output Terminal 4-Channel Relay
34
Fig. 22 : Mygeze Control Output Terminal 4-Channel Relay
34
Mygeze Control Power Supply Terminal
36
Fig. 23: Mygeze Control Power Supply Terminal
36
Mygeze Control Coupler
37
Fig. 24: Mygeze Control Coupler
37
Mygeze Control Extension
38
Fig. 25: Mygeze Control Extension
38
Mygeze Control 2-Port Junction
39
Fig. 26: Mygeze Control 2-Port Junction
39
Mygeze Control Bus End Cover
40
Terminal Name with Mygeze Control Assignment to Beckhoff
40
Fig. 27: Mygeze Control Bus End Cover
40
6 System Structure and System Limits
41
Max. Possible Terminals in the Template Project
41
Technically Possible Order of Terminals in the Template Project
42
System Limits
43
Substations
43
Fig. 28: Example of Substation System Structure
43
Detached Inputs and Outputs with GEZE IO 420
44
Determination of the Necessary Hardware Components
44
Electrical Wiring Diagram
44
Fig. 29: Detached Inputs and Outputs with GEZE IO 420
44
Licence Model
45
Fig. 30: Twincat Systemid
45
7 Putting the Software into Operation
46
Basic Information about Beckhoff and Twincat 3
46
Mygeze Control Configurator
47
Introduction
47
Overview
47
Fig. 31: Example of Non-Valid Input
47
Fig. 32: Input Screen Header
47
Fig. 33: Header in Other Screens
48
Fig. 34: Input Screen
49
Fig. 35: Import Local
50
Fig. 36: Import Controller
51
Fig. 37: Import Successful
52
Fig. 38: Import Failed
52
Fig. 39: Controller and Local Export
53
Fig. 40: Device Overview Empty
54
Fig. 41: Device Overview with Content
54
Fig. 42: Adding Devices - Step 1 (Default Setting)
55
Fig. 43: Example of Pattern Entered
57
Fig. 44: Adding Devices - Step 2
58
Fig. 45: Adding Devices - Step 3.1
59
Fig. 46: Adding Devices - Step 4
60
Fig. 47: Editing Devices - Step 4
61
Fig. 48: Calendar Function
62
Fig. 49: Notification Function (Default)
63
Fig. 50: Edit Reporting Classes
64
Fig. 51: State Texts Function
65
Fig. 52: Scene Function
66
Fig. 53: Configuration of Actions
67
Installation
68
Updating
68
Deinstallation
68
Preparations for a New Controller
69
Settings that Are Set with this Image
69
Preparations
70
Fig. 54: DIP Switch S101, Switches 1-10
70
Fig. 55: Edit Route
71
Fig. 56: Add Route Dialogue
72
Fig. 57: Example CX745FD0
73
Preparing an Application for a Project
74
IP Addresses and Bacnet Settings of the Controller
74
Fig. 58 : Mygeze Control Configurator IP Address Example
74
Loading a GEZE Project
75
Preparing Twincat Project
75
Fig. 59: Advanced Settings
75
Fig. 60: Tcxaeshell_Openproject 01
76
Fig. 61: Tcxaeshell_Openproject 02
76
Fig. 62: Project Selection_Solutionexplorer
77
Fig. 63: Tcxaeshell_Openproject 03
77
Fig. 64: Tcxaeshell_Openproject 04
78
Fig. 65: Twincat References
79
Fig. 66: Twincat References Faulty
79
Fig. 67: Twincat References
80
Fig. 68: Mygeze_Tcxaeshell_Openproject
81
Fig. 69: Mygeze_Tcxaeshell_Openproject
81
Fig. 70: Mygeze_Tcxaeshell_Openproject
81
Fig. 71: Mygeze_Tcxaeshell_Openproject
82
Fig. 72: Mygeze_Tcxaeshell_Openproject
82
Checking Bacnet Objects and Generating Bacnet-EDE File with Twincat
83
Checking Bacnet Objects
83
Fig. 73: Mygeze LED Status
83
Generating Bacnet-EDE File
85
Expanded Bacnet Settings in Twincat
87
Assigning the Bacnet Device Instance Using the Mygeze Control Configurator
87
Fig. 74: Setting_Bacnet ID.PNG
87
Setting the Bacnet UDP Port
88
Fig. 75: Setting_Bacnet UDP01
88
Fig. 76: Setting_Bacnet UDP02
89
Setting the Bacnet Broadcast Management Device BBMD
90
CAN Monitor Application
92
Fig. 77: Project_Selection_Solutionexplorer_Can-Monitor
92
Fig. 78: Mygeze_Tcxaeshell_Openproject08
93
Fig. 79: Mygeze_Tcxaeshell_Openproject09
93
Fig. 80: Access_Can-Monitoring
94
Fig. 81: Twincat_Log-In
95
Fig. 82: CAN-Monitor-V_CAN Side
95
Fig. 83: CAN-Monitor List
96
Fig. 84: CAN-Monitor-Button_All.png
96
Fig. 85: CAN-Monitor-Button_Export.png
96
Fig. 86: CAN-Monitor-Device_List.png
97
Fig. 87: CAN-Monitor-Web-Browser.png
98
8 Transportation and Storage
99
9 Disposal
100
10 Technical Data
101
List of Figures
102
Advertisement
Advertisement
Related Products
GEZE myGEZE Control
GEZE myGEZE Control with GEZE CAN bus
GEZE MBZ300
GEZE MSW
GEZE MSW sliding wall system
GEZE MCRdrive
GEZE E 260 N12
GEZE E 260 N12/1
GEZE E 260 N12/2
GEZE E 260 N2
GEZE Categories
Door Opening System
Control Unit
Security Sensors
Accessories
DC Drives
More GEZE Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL