Manuals and User Guides for Fröling S1 Turbo F 15. We have
1
Fröling S1 Turbo F 15 manual available for free PDF download: Installation Instructions Manual
Fröling S1 Turbo F 15 Installation Instructions Manual (64 pages)
Firewood boiler
Brand:
Fröling
| Category:
Boiler
| Size: 5 MB
Table of Contents
Table of Contents
2
General
4
About this Manual
4
Operating Principle
4
Disposal of Packaging Materials
5
Safety
6
Hazard Levels of Warnings
6
Qualification of Assembly Staff
7
Personal Protective Equipment for Assembly Staff
7
Design Information
8
Overview of Standards
8
General Standards for Heating Systems
8
Standards for Structural and Safety Devices
8
Standards for Heating Water
8
Regulations and Standards for Permitted Fuels
9
Installation and Approval
9
Installation Site
9
Chimney Connection/Chimney System
10
Connection Line to the Chimney
11
Measuring Port
12
Draught Limiter
12
Electrostatic Particle Separator
13
Combustion Air
14
General Requirement
14
Room Air-Independent Operation
14
Domestic Hot Water
16
Pressure Maintenance Systems
18
Storage Tank
19
Return Lift
21
Boiler Ventilation
21
Technology
22
Dimensions of S1 Turbo (F)
22
Components and Connections
23
Technical Specifications
24
Boiler Data for Planning the Flue Gas System
25
Data for Planning a Backup Power Supply
25
Transport and Storage
27
Delivery Configuration
27
Temporary Storage
27
Positioning
28
Positioning at the Installation Site
29
Removing Boiler from Pallet
29
Operating and Maintenance Areas of the Equipment
30
Assembly
32
Required Tools and Equipment
32
Accessories Supplied
32
Assembly Overview S1 Turbo (F)
33
Before Installation
35
Changing Door Stops (as Needed)
35
Checking the Seal on the Doors
37
Adjusting the Doors
38
Positioning the Boiler on the Boiler Base Frame (Optional)
39
Installing the Boiler
40
Fit the Induced Draught Fan
40
Installing the Insulation
40
Fitting the Air Control
44
Installing the WOS Lever
45
Installing the Insulated Door
45
Fitting the Controller Box
47
Installing the Lambda Probe, Sensor and Thermal Discharge Valve
47
Attaching the Induced Draught Cable
48
Hydraulic Connection
49
Electrical Connection and Wiring
51
Board Overview
52
Connecting Components
53
Potential Equalisation
54
Concluding Work
55
Positioning the Boiler Stickers
56
Insulate the Connection Line
56
Install the Brackets for Accessories
57
Affixing the Identification Plate
57
Start-Up
58
Before Commissioning / Configuring the Boiler
58
Initial Startup
59
Permitted Fuels
59
Fuels Permitted under Certain Conditions
61
Non-Permitted Fuels
61
Heating up for the First Time
61
Decommissioning
62
Mothballing
62
Disassembly
62
Disposal
62
Appendix
63
Pressure Equipment Regulation
63
Advertisement
Advertisement
Related Products
Fröling S1 Turbo 15
Fröling S1 Turbo 20
Fröling S1 Turbo F 20
Fröling S1 Turbo
Fröling SP Dual compact 15
Fröling S3 Turbo 28
Fröling S3 Turbo 40
Fröling S4 Turbo 34
Fröling S4 Turbo 50
Fröling S4 Turbo F 32
Fröling Categories
Boiler
Industrial Equipment
Boiler Supplies
Pellet stove
Control Systems
More Fröling Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL