Sign In
Upload
Manuals
Brands
enphase Manuals
Inverter
IQ Combiner 6C
enphase IQ Combiner 6C Manuals
Manuals and User Guides for enphase IQ Combiner 6C. We have
1
enphase IQ Combiner 6C manual available for free PDF download: Quick Install Manual
enphase IQ Combiner 6C Quick Install Manual (76 pages)
Brand:
enphase
| Category:
Inverter
| Size: 33 MB
Table of Contents
Table of Contents
3
Introduction
6
System Configurations
6
Grid-Tied System
7
Grid-Forming System
8
Diagrams
10
What's in the Box
21
Tools/Additional Items Required
21
Mounting
22
Location Planning
22
Recommended Clearance
22
Opening the Door
23
Detaching the Door
24
Removing the Dead Front
24
Install on the Wall
25
Internal View
26
Upper-Side Conduit (Pre-Drilled)
28
Conduit Drilling
28
Wiring Sequence
29
Ride through Power Supply Board
30
Integrated Load Controller: Disassembly
30
Power Supply Board with Capacitors: Assembly
31
Gateway and Combiner Controller Board Connections
33
Control Wiring
33
Sequence 1: Control Wiring between One IQ Battery 10C, IQ Combiner 6C, and IQ Meter Collar
35
Sequence 2: Control Wiring between Two IQ Battery 10C, IQ Combiner 6C, and IQ Meter Collar
36
Sequence 3: Control Wiring between Four IQ Battery 10C, IQ Combiner 6C, and IQ Meter Collar
36
Sequence 4: Control Wiring between Four IQ Battery 10C, IQ Combiner 6C Without the IQ Meter Collar
37
Sequence 5: Control Wiring between Four IQ Battery 10C Units Using One Header in IQ Combiner 6C
38
Consumption CT Wiring
39
Wire Consumption Cts - Method 1 - Replace Load Controller Cts Header with Consumption Cts)
40
Wire Consumption Cts - Method 2 - Parallel Consumption Cts with Load Controller Cts on the same Header
42
IQ Gateway Connections
44
Wiring
45
IQ PV Wiring
45
IQ Battery Wiring
46
IQ EV Charger Wiring
47
Integrated Load Controller Wiring
48
Backfeed Wiring
49
Disconnect and Rapid Shutdown Initiators Wiring
50
PV Side Disconnect
50
Grid Side Disconnect Wiring
51
Wiring Using Upper-Side Conduit (Pre-Drilled)
53
Leds and Push Buttons
53
Setting up Enphase Power Control (EPC)
54
Setting up Enphase Power Control On-Site During Commissioning
55
Locations of Disconnects and Rapid Shutdown Initiator
56
Rapid Shutdown Initiator and Disconnects Locations for Grid-Forming Systems
57
Scenario 1: IQ Combiner 6C and IQ Battery Are Installed in a Readily Accessible Area
57
Scenario 2: IQ Combiner 6C Installed in a Readily Accessible Area
58
Scenario 3: IQ Combiner 6C and IQ Battery Are Installed in an Area that Is Not Readily Accessible
60
Scenario 4: Backfed Panel Installed in a Readily Accessible Area Outdoors
61
Rapid Shutdown Initiator and Disconnects Locations for Grid-Tied Systems
63
Scenario 1: IQ Combiner 6C and IQ Battery Are Installed in a Readily Accessible Area
64
Scenario 2: IQ Combiner 6C Installed in a Readily Accessible Area
65
Scenario 3: IQ Combiner 6C and IQ Battery Are Installed in an Area that Is Not Readily Accessible
67
Scenario 4: Backfed Panel Installed in a Readily Accessible Area
69
Closing the Enclosure
71
Energizing the IQ Combiner 6C
72
Site Commissioning
72
Safety Information
72
Safety and Advisory Symbols
72
Safety Instructions
72
FCC Statement
73
Appendix A: 3-Pole Disconnect Models
73
Appendix B: 2-Pole Disconnect Models
73
Appendix C: Legends
74
Revision History
74
Advertisement
Advertisement
Related Products
enphase IQ Combiner 4
enphase IQ Combiner 4C
enphase IQ Combiner 5
enphase IQ Combiner 5C
enphase IQ Combiner 3
enphase IQ Combiner 2 EU 3P
enphase AC Battery
enphase AC Combiner Box
enphase B280-1200-LL-I-US00-RF0
Enphase C250
enphase Categories
Inverter
Gateway
Cables and connectors
Battery Pack
Controller
More enphase Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL