Sign In
Upload
Manuals
Brands
CSZ Manuals
Climate chamber
MicroClimate MCB-1.2
CSZ MicroClimate MCB-1.2 Manuals
Manuals and User Guides for CSZ MicroClimate MCB-1.2. We have
1
CSZ MicroClimate MCB-1.2 manual available for free PDF download: Installation, Operation & Maintenance Manual
CSZ MicroClimate MCB-1.2 Installation, Operation & Maintenance Manual (88 pages)
Brand:
CSZ
| Category:
Climate chamber
| Size: 1 MB
Table of Contents
Table of Contents
7
Safety Precautions/Features
11
Introduction
11
General Safety Precautions
11
Safety Features
15
Electrical Circuit Protection
15
Refrigeration System Protection
15
Overtemperature Protection
15
System Description
17
Controller
17
Chamber
17
Chamber Interior
17
Chamber Exterior
17
Refrigeration/Heating
18
Refrigeration
18
Heater
18
Humidity (Optional)
18
Figure 5. Plenum Area
22
Figure 6. Air Temperature Sensor Location
22
Pen Recorders (Optional)
23
High/Low Limit Control
23
Figure 7. Air Temperature Sensor Location MCH-3
23
Ieee-488 System (Optional)
24
Ln2/Co2 Boost Cooling System (Optional)
24
Humidity Panel/Chamber Components (Optional)
25
Figure 8. MCB 1.2 Recirculating Water
27
Figure 9. MC3 Recirculating Water
27
Figure 10. Steam Generator System
28
Microclimate Specifications
29
Sequence of Operations
40
Start-Up Instruction Summary
47
Summary for Step-By-Step Setpoint Operation - Ezt-430S
47
Chamber Performance (Ezt-430S)
52
High/ Low Limit Control
52
Figure 2. Watlow F4 Controller
54
Single Set-Point Operation - Humidity
55
Chamber Performance (Watlow F4)
55
Pumpdown
57
Single Setpoint Operation
58
Manual Event Control
59
Profile Operation
59
Installation
61
Preparation for Use
61
Lifting Instructions
61
Main Power Connection
61
Single Phase Cord Connected Equipment
62
Three Phase Power Connection
62
Figure 1. Power Distribution Block
62
Removing Top Cover of Chamber
63
Humidity System (if Equipped)
63
Figure 2. Top Cover Removal
63
Figure 3. Refrigeration Power Pack (MCB 1.2 Cascade)
64
Figure 4. Main Power Wiring, MCB
65
Figure 5. Main Power Wiring, MCBH
66
Figure 7. Main Power Wiring (MC-3 with EZT-570S Controller)
68
Figure 8. Refrigeration Power Pack (MC-3)
69
Inspection Schedule
71
Preventive Maintenance Schedule
71
Daily
71
Monthly
71
Yearly
72
General Visual Inspection
73
Test Equipment Required for Maintenance
73
Humidity System Maintenance
79
Changing the Cartridge
79
Cleaning the Humidity Sensor
80
Water Quality
80
How to Contact Csz
83
How to Obtain Replacement Parts/Parts Ordering Procedure
83
Advertisement
Advertisement
Related Products
CSZ MicroClimate Series
CSZ MicroClimate MC-3
CSZ Categories
Controller
Medical Equipment
Accessories
Test Equipment
Control Systems
More CSZ Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL