Sign In
Upload
Manuals
Brands
Cray Manuals
Air Conditioner
T3E
Cray T3E Manuals
Manuals and User Guides for Cray T3E. We have
2
Cray T3E manuals available for free PDF download: Manual, Installation Manual
Cray T3E Installation Manual (134 pages)
AC Multiple-cabinet
Brand:
Cray
| Category:
Industrial Equipment
| Size: 2 MB
Table of Contents
Table of Contents
1
Record of Revision
8
Overview
8
Safety Information
10
Hazard Statements
10
ESD Precautions
10
ESD Smock
10
Wrist Strap
11
Safety Precautions
11
Preinstallation Activities
13
Tools Required
13
Checking Site Planning Requirements
13
Checking the Power Cord Receptacles
14
Table 1. Required Power Receptacle Test Readings
15
Power Wiring for High-Leakage Current
16
Figure 1. Power Plugs and Receptacles
16
Unloading the Computer System
17
Figure 2. Single-Cabinet Shipping Configuration
18
Inspecting the System
19
Figure 3. Three-Cabinet Shipping Configuration
19
Opening the "OPEN FIRST" Box
20
Transporting the Mainframe to the Designated Location
20
Shipping Specifications
21
Unpacking the CRAY T3E AC Cabinets
22
Unpacking a Crate that Contains a Single Cabinet
22
Figure 4. Cabinet Shipping Crate
23
Figure 5. Retaining Block and Screws
24
Figure 6. Installing the Ramp
25
Figure 7. Cardboard Shipping Container
26
Figure 8. Removing the Inside Retaining Bar
27
Figure 9. Shipping Bolts
28
Unpacking a Crate that Contains Two or Three Cabinets
30
Figure 10. Remove the Blocks
31
Figure 11. Remove the Bumpers
31
Figure 12. Place the Blocks Beneath the Corner Levelers
32
Figure 13. Lower the Cabinets Onto the Blocks and Remove the Lifts
32
Figure 14. Remove the Straps
33
Figure 15. Remove the Cardboard Lid and Panels
33
Figure 16. Remove the Four Shipping Bolts
34
Figure 17. Remove the Pallet
34
Figure 18. Remove the Blocks
35
Figure 19. Lower the Cabinets to the Floor
35
Unpacking and Positioning the
37
Unpacking and Positioning the System Workstation (SWS)
37
Unpacking and Positioning Additional System Components
37
Joining Two or more CRAY T3E AC Cabinets
38
Preparing the CRAY T3E Cabinets for Internal Wiring
38
Positioning Cabinets Temporarily When no Cabinets Are Prejoined
38
Figure 20. CRAY T3E AC Cabinet Layout
38
Figure 21. Door Latches and Handle (Front Door)
39
Figure 22. Cabinet Floor Plan
40
Figure 23. Temporary Cabinet Positions
41
Positioning Cabinets Temporarily When some Cabinets Are Prejoined
42
Figure 24. CRAY T3E AC Cabinet Layout
42
Figure 25. Door Latches and Handle (Front Door)
43
Figure 26. Cabinet Floor Plan
44
Figure 27. Temporary Cabinet Positions for Prejoined Cabinets
45
Removing Doors
46
Removing the Blower Exhaust Shields
47
Removing Access Panels
47
Figure 28. Access Panel Locations
48
Removing Wire-Duct Covers
49
Figure 29. Frame-Bolt Holes and Wire-Duct Locations
50
Removing the Side Trim and Logic Panels (Optional)
51
Attaching Cable Troughs
52
Figure 30. Cable Troughs
52
Joining the Cabinets
53
Figure 31. Six-Cabinet System
53
Figure 32. Frame-Joiner Bolt Locations
54
Figure 33. Frame-Joiner Bolts
55
Opening the Cable Ducts
56
Figure 34. Intercabinet Cable Duct Locations
56
Figure 35. Intercabinet Cable Duct (as Viewed from Inside Cabinet)
57
Grounding the Mainframe Chassis
58
Figure 36. Chassis Ground Connections (Rear View of Cabinet)
58
Removing Clock and Logic Modules
59
Figure 37. Module Camming
59
Figure 38. Module Setscrew Locations (Rear View of Cabinet)
61
Preparing the Rails for Wire Insertion
62
Removing Slot Plugs
62
Figure 39. Removing Plugs from the Top Clock Rail
62
Removing Rail Connectors
63
Figure 40. Loosening the Wires
63
Figure 41. Clock Connector Locations
64
Figure 42. Removing Clock Rail Connectors
64
Figure 43. Connector Locations - Bottom Clock Rail
65
Figure 44. Removing a Connector Spring
65
Removing Connector Pin Locks
66
Figure 45. Removing a Connector Pin Lock
66
Completing the Internal Wiring
67
Completing the Clock Connections
67
Figure 46. Example - Clock Wire Labels
68
Figure 47. Clock Connections
69
Figure 48. System and Gigaring Clock Wire Connections
69
Figure 49. Pin Locations
71
Figure 50. 2-Pin Connector Position
72
Figure 51. Wire Insertion
72
Figure 52. Wire Insertion with Wire Rod
73
Completing the Boundary Scan Connections
74
Connecting the Point-To-Point Wires - 4 or more Cabinets
75
Figure 53. Edge-To-Edge Connection - P/N 15224009
75
Figure 54. Edge-To-Edge Connection - P/N 15223701
75
Figure 55. Direct Boundary Scan Connections
76
Connecting 4-Pin Edge-To-Pigtail Cables - P/N 15237701
77
Figure 56. 4-Pin Edge-To-Pigtail Connections
78
Figure 57. 4-Pin Edge-To-Pigtail Cable - P/N 15237701
79
Connecting the Daisy Chain
80
Figure 58. TDOM > TDIM Daisy Chain Connection - between Cabinets
80
Figure 59. Scan Jumper/Intermediate Connection - P/N 15223802
81
Connecting Scan Chain 0 to the Scan Master
82
Figure 60. Connection - Scan Master to End of Daisy Chain
82
Figure 61. 2-Position Socket, Edge-To-Pigtail Cable - P/N 15237601
83
Connecting Scan Chain 1 to the Scan Master
84
Figure 62. Boundary Scan Connections to Cabinet 3, Slot 1
84
Figure 63. Scan Jumper/Intermediate Connection - P/N 15223802
85
Figure 64. 2-Position Pin, Edge-To-Pigtail Cable - P/N 15237801
86
Figure 65. 2-Position Socket, Edge-To-Pigtail Cable - P/N 15237601
87
Reinstalling the Connectors in the Top Clock Rail
88
Figure 66. Inserting and Seating a Plastic Connector Pin Lock
88
Completing the Torus Interconnect Network Connections
90
Figure 67. Example of Torus Connections
90
Figure 68. Connectors P2 and P3 - Torus Cable Assembly
91
Closing the Cable Ducts
93
Installing Modules
93
Figure 69. Module Camming
94
Installing Side Access Panels and Trim
95
Figure 70. Installing the Side Panels
96
Positioning Cabinets (for Prejoined Cabinets)
97
Figure 71. CRAY T3E AC Cabinet Layout
97
Figure 72. Door Latches and Handle (Front Door)
98
Figure 73. Cabinet Floor Plan
99
Grounding the Mainframe Chassis (for Prejoined Cabinets)
100
Figure 74. Chassis Ground Connections (Rear View of Cabinet)
100
Installing the Cabinet Side Panels (for Prejoined Cabinets)
101
Figure 75. Installing Side Panels
102
Verifying the CRAY T3E AC Hardware
103
Figure 76. CRAY T3E Cabinet Components -- Front View
103
Verifying the Voltage Selector Switch
104
Figure 77. Voltage Selector Switch (SW1)
104
Connecting the Optional Customer Alarm
105
Figure 78. Power-Cord Cover and Power-Box Cover (Removed)
105
Figure 79. Filter Bracket
106
Figure 80. Remote Alarm Contacts - Locations
107
Table 2. Remote Alarm Contacts - Descriptions
107
Verifying the Control System Hardware
108
Figure 81. WACS Front Panel
108
Figure 82. WACS with Front Panel Open
109
Table 3. Bottom Scanner DIP Switch Functions
109
Verifying Additional Power Hardware
110
Figure 83. Power Supply Rack
110
Verifying that the Modules Are Seated and Cammed
111
Figure 84. Module Setscrew Locations (Rear View of Cabinet)
111
Completing the System Cabling
112
Figure 85. Typical System - Block Diagram
112
Cable Labels
113
Table 4. Cable Labels
113
Table 5. Example Cable Label
113
Connecting the WACS
114
Figure 86. WACS Connector Location on I/O Bulkhead
114
Connecting the Gigaring Cables
115
Figure 87. I/O Bulkhead - Connector Locations
115
Table 6. CRAY T3E AC I/O Bulkhead Gigaring Connections
115
Figure 88. Example Gigaring Connections
116
Figure 89. Gigaring Connectors on PC-10 (Rear View)
117
Figure 90. NSR-1 Gigaring Connectors
118
Figure 91. MPN-1 Gigaring Connectors
118
Verifying System Cabling
119
Powering up the System Workstation (SWS)
119
Powering up the
119
Connecting the Input Power to the CRAY T3E Cabinets
119
Verifying Cabinet Operation
120
Verifying WACS Control
120
Figure 92. WACS Summary Screen - Standby Mode
120
Verifying Operation of the Blower
121
Verifying Operation of the Thermistors
121
Verifying Cabinet Power Switch and Shunt Trip Operation
121
Verifying Remote Alarm Operation (Optional)
122
Powering up the Modules
122
Verifying Remote Power On/Off
123
Figure 93. Power Supply Circuit Breakers and Leds
123
Running Boundary Scan and Diagnostics
124
Figure 94. T3EMS Main Window
125
Figure 95. T3EMS Scan Tool Options Window
126
Figure 96. Load Program Window
127
Figure 97. PE Configuration Window
128
Table 7. Offline Diagnostic Tests
130
Installing Panels and Doors
131
Installing Rear Access Panels
131
Figure 98. Access Panel Locations
131
Installing the Doors
132
Appendix - Wire Removal
133
Figure 99. Connector Removal with Mechanical Pencil
133
Advertisement
Cray T3E Manual (206 pages)
Brand:
Cray
| Category:
Desktop
| Size: 3 MB
Table of Contents
Table of Contents
1
Record of Revision
3
Introduction
4
Safety and ESD Precautions
4
Field-Replaceable Units (Frus), On-Site Spares, and Tools
5
Cabinet Overview
11
FRP 1: Opening and Removing the Cabinet Doors
13
FRP 2: Removing the Cabinet Side Panel
16
FRP 3: Power Supply Replacement
21
FRP 4: Auxiliary Clock Power Supply Replacement
29
FRP 5: Module Replacement
32
FRP 6: Daughter Card Replacement
42
FRP 7: Power Supply Rail Replacement
49
FRP 8: Top Module Rail Replacement
52
FRP 9: Bottom Module Rail Replacement
59
FRP 10: Logic Cable Replacement
65
FRP 11: Gigaring Cable Replacement
71
FRP 12: Clock Wire Replacement
76
FRP 13: Boundary Scan Cable/Wire Replacement
87
FRP 14: Module-To-WACS Cable Replacement
99
FRP 15: WACS Microprocessor (EPROM) Replacement
109
FRP 16: WACS Scanner Board Replacement
113
FRP 17: WACS Display Replacement
117
FRP 18: WACS Panel Switch (SW6, SW7, SW8) Replacement
120
FRP 19: Blower Controller Bypass Switch (SW3) Replacement
122
FRP 20: Cabinet Power Switch (SW2) Replacement
124
FRP 21: Clock Switch Board Replacement
126
FRP 22: Module Thermistor Replacement
129
FRP 23: Inlet Air Thermistor Replacement
132
FRP 24: Exhaust Air Thermistor Replacement
136
FRP 25: Thermostat Replacement
141
FRP 26: WACS Scanner Fuse Replacement
145
FRP 27: Power Supply Fuse Replacement
148
FRP 28: Blower Control Fuse Replacement
150
FRP 29: Main Disconnect Circuit Breaker (CB1) Replacement
152
FRP 30: WACS Panel Circuit Breaker (CB8, CB9, or CB10) Replacement
156
FRP 31: Power Supply Circuit Breaker (CB2 through CB7) Replacement
160
FRP 32: Voltage Selector Switch (SW1) Replacement
164
FRP 33: Time-Delay Relay Replacement
168
FRP 34: Line Filter (FL1) Replacement
170
FRP 35: Contactor (CT1) Replacement
173
FRP 36: Resistor (R1) Replacement
176
FRP 37: Air Filter Replacement
179
FRP 38: Blower Assembly Replacement
182
FRP 39: Blower Controller (SCR1) Replacement
187
FRP 40: Transformer (T1) Replacement
191
FRP 41: Run Capacitor (C1) Replacement
194
Preventive Maintenance and Adjustment Procedures
197
Cleaning the Air Filter
197
Cleaning the EMI Filters
197
Adjusting the Module Power Supply Output Voltage
197
Advertisement
Related Products
Cray Categories
Desktop
Server
Industrial Equipment
Storage
Air Conditioner
More Cray Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL