Sign In
Upload
Manuals
Brands
CPS Manuals
Storage
ES-250kW/559.1kWh
CPS ES-250kW/559.1kWh Manuals
Manuals and User Guides for CPS ES-250kW/559.1kWh. We have
1
CPS ES-250kW/559.1kWh manual available for free PDF download: Installation And Operation Manual
CPS ES-250kW/559.1kWh Installation And Operation Manual (71 pages)
Energy Storage System
Brand:
CPS
| Category:
Storage
| Size: 5 MB
Table of Contents
Table of Contents
2
Before You Start
6
1 Important Safety Instructions
7
Warnings and Markings on the Product
8
Owner Safety Requirements
9
Operation and Maintenance Personal Safety Requirements
10
Prerequisites
10
Responsibility
10
Operation and Maintenance Safety Instructions
11
2 Overview
12
Key Features
13
PCS Cabinet Nameplate
13
Battery Cabinet Design
14
Battery Cabinet Appearance
14
Battery Cabinet Dimensions
15
Battery Cabinet Internal Components
16
Battery Cabinet Cable Entry
17
PCS Cabinet
18
PCS Cabinet Appearance
18
PCS Cabinet Dimensions
19
PCS Cabinet Internal Components
20
PCS Cabinet Cable Entry
22
Built-In PCS Inverters
23
PCS Appearance
23
PCS Dimensions
23
PCS Module Front Panel
24
PCS Schematic Diagram and Circuit Design
24
PCS Key Features
26
Battery Rack Design
27
Battery Thermal Management
29
Fire Suppression System
31
Parallel Operation
32
3 Shipping and Delivery
33
Shipping Requirements
33
Product Package Weight and Dimensions
33
Transportation Process and Requirements
34
Lifting and Transportation
35
Lifting Precautions
35
Lifting Procedures
36
Hoisting Precautions
37
Hoisting Risk Identification
38
Hoisting Safety Measures
39
Ambient Thermal Insulation
40
Fastening the Cabinets
40
Lifting Using Forklift
42
Inspection
43
Product Storage Requirements
43
4 Mechanical Installation
44
Components Checklist
44
Pre-Installation Inspection
46
Installation Site Selection
46
Installation Space Requirements
47
Installation Site Surface Requirements
48
ESS Installation Procedure
48
Base Mounting
49
Installation Surface
50
5 Electrical Connection
51
Required Tools for Installation
51
Opening the Cabinets
52
Cabinet Door Closing Procedure
53
Closing the Battery Cabinet Door
53
Battery Cabinet Door Inspection
54
AC / DC Wiring
54
Precautions for AC / DC Connection
54
AC / DC Wiring Terminal Locations
55
Cable Specifications
58
Grounding Connection
59
Cabinet Internal Equipment Grounding
59
Cabinet Chassis Grounding
59
Inspections before Startup
60
Power-On Procedure
61
6 Troubleshooting and Maintenance
62
General Maintenance
62
Faults and Troubleshooting
64
7 Technical Data
69
Datasheet
69
Advertisement
Advertisement
Related Products
CPS ES Series
CPS ES-125kW/279.55kWH
CPS ES-5015KWH-US-M
CPS ECB200KTL/US-800
CPS ESSR-05KH1
CPS ESSR-10KH1
CPS ESSR-15KH1
CPS ESSR-20KH1
CPS Power Block 2.0 ES-5015KWH-US-M
CPS Power Block 2.0 Series
CPS Categories
Inverter
Measuring Instruments
Two-Way Radio
Test Equipment
Security Sensors
More CPS Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL