Sign In
Upload
Manuals
Brands
Cooper safety Manuals
Circuit Tester
Ceag AT-S+ SU2
Cooper safety Ceag AT-S+ SU2 Manuals
Manuals and User Guides for Cooper safety Ceag AT-S+ SU2. We have
1
Cooper safety Ceag AT-S+ SU2 manual available for free PDF download: Mounting And Operating Instructions
Cooper safety Ceag AT-S+ SU2 Mounting And Operating Instructions (76 pages)
Automatic Test System STAR+ Technology
Brand:
Cooper safety
| Category:
Circuit Tester
| Size: 5 MB
Table of Contents
Table of Contents
2
1 General Information
5
Description of Symbols
5
Information Regarding These Instructions
5
Further Applicable Documents
5
Liability and Guarantee
5
Copyright Protection
6
Spare Parts
6
Recycling
6
2 Safety
6
Inteded Use
6
Contents of Operating Instructions
7
Changes and Modifications to the System
7
Responsibility of the Operator
7
Personnel Requirements
7
Operational Safety
7
Personal Protective Equipment
7
3 Technical Data Data Sheet for AT-S
8
C30
8
C16
9
Data Sheet for AT-S + C4
10
Data Sheet for AT-S + C0
11
Data Sheet for AT-S + SU4
12
Data Sheet for AT-S + SU2
12
Data Sheet for AT-S + SU1
12
Data Sheet for AT-SSOU2
13
Data Sheet for AT-SSOU1
13
4 Construction and Function
14
Example of Control Cabinet-Construction
14
Product Description
15
Operation Modes
15
Overview over the Components
16
Control Module CU-S
16
DC/DC Converter.2
19
AC-Module
19
Circuit Change-Over Modules Overview (SU/SOU)
19
F3 Remote Indication
23
External TLS-Bus-Module
24
External Dls/3Ph-Bus-Module and Ext. Dls/3Ph-Bus-Module Inverse
25
Bus-Technology According to RS 485 or CG-S-Bus
27
Label of AT-S
28
Example of Installation
30
5 Transport, Packaging and Storage Safety Notes
32
Transport Inspection
32
Packaging
32
Storage
33
6 Installation Safety Notes
34
Assembly
35
Installation
36
Connection to Mains
36
Connection to Mains Supply of a AT-S
36
Station
36
Connection to Mains of Substations AT-S
37
Connection and Installation of Internal Modules
37
Connection and Installation of External SU S
38
Modules
38
Dls/3Ph-Bus-Module
38
TLS-Bus-Module
39
CEAG 3-Phase Monitors with 24V Current Loop
39
Completing Assembly
40
7 Commissioning and Other Work
41
Checking All Connections
41
Voltage Measurements
41
Insulation Testing
41
Checking / Replacing of Fuses
42
Checking the Fuses of the Mains Supply
42
Checking the Fuses on the Module SU S
42
Checking and Replacing Internal Modules
43
Checking and Replacing External Modules
43
Powering up the System
43
8 Operating Safety Notes
44
General Information about Operating
44
Controls and Displays on the Modules
45
Control Module CU-S
45
DC/DC Converter
45
SU-S + of the Final Circuits
45
Operating the CU S + Control Module
46
Menu 1: "Test & Status Menu
50
Menu 2: "Block, Reset
52
Menu 3: "Basic Settings
53
Menu 4: "DLS/TLS Setup
59
Menu 5: "Circuit Setup
60
Menu 6 "Luminaire Setup
62
Menu 7 "Logbooksetup
64
9 Failures
65
Interference Immunity by Screening
65
Screen Connection
66
The Fail-Safe System
66
10 Maintenance / Checking
67
Safety Notes
67
General Information to Maintenance / Checking
67
Enabling of End Circuits with Maintenance Work
68
Appendix
69
Advertisement
Advertisement
Related Products
Cooper safety Ceag AT-S+ SU4
Cooper safety Ceag AT-S+ SU1
Cooper safety Ceag AT-S+ SOU2
Cooper safety Ceag AT-S+ SOU1
Cooper safety Ceag AT-S+ Series
Cooper safety Ceag AT-S+ C30
Cooper safety Ceag AT-S+ C16
Cooper safety Ceag AT-S+ C4
Cooper safety Ceag AT-S+ C0
Cooper safety Categories
Security Sensors
Control Panel
Lighting Equipment
Safety Equipment
Lantern
More Cooper safety Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL