Sign In
Upload
Manuals
Brands
Centurion Manuals
Gate Opener
D20 SMART
Centurion D20 SMART Manuals
Manuals and User Guides for Centurion D20 SMART. We have
1
Centurion D20 SMART manual available for free PDF download: Installation Manual
Centurion D20 SMART Installation Manual (87 pages)
SLIDING GATE OPERATORS
Brand:
Centurion
| Category:
Gate Opener
| Size: 12 MB
Table of Contents
Table of Contents
3
Introduction
5
Important Safety Information
5
Warnings for the Installer
5
Safe Disposal of Batteries
6
Lightning Protection
7
Theft Protection
7
Safety First
7
Product Specifications
8
Physical Dimensions D3 SMART and D5-Evo SMART D6 SMART
8
D10 SMART, D10 Turbo SMART and D20 SMART
8
Technical Specifications (12V Operators)
9
D3 SMART and D5-Evo SMART
9
Technical Specifications (24V Operators)
10
D6 SMART and D10 SMART
10
D10 Turbo SMART and D20 SMART
11
Operations Whilst in Battery Backup (Standby) Mode
12
General Specifications
13
Product Identification
14
D3 SMART and D5-Evo SMART D6 SMART
14
D10 SMART, D10 TURBO SMART and D20 SMART
16
Required Tools and Equipment
17
New Site Installation Preparation
18
General Considerations for the Installation
18
End-Stops
18
Guide-Rollers and Anti-Lift Brackets
19
Starting and Running Forces
19
Cabling Requirements
20
Lubrication
21
Operator Installation
22
New Site Installations
22
Locating an Initial Reference Point
22
Minimum Clearances - Sides
22
Minimum Clearances - Front
22
Locate the Operator's Position
22
Foundation Plate Installation
22
Retro-Fit Installations (Existing Sites)
22
Retro-Fitting If The Existing Foundation Plate Is Unusable
22
Conduit and Cable Length
35
Preparing for Installation
36
Removing the Charger
37
Removing the Control Card
39
Mounting the Gearbox
40
Routing the Cables
43
Manual Override
46
Height Adjustment
47
Mounting the Rack
49
Override Sensor
55
Routing the Override Sensor Harness
55
Placing the Control Card Back into Position
58
Reconnecting the Harnesses to the Control Card and Charger
60
Completing the Installation
65
Fitting the Battery
65
Wiring and Connecting the Earth and AC Mains Input
68
Accessory Installation and Storage
70
Wiring the Contoller on Default Settings
71
Closing Infrared Beam Wiring (I5 Infrared Beams)
71
Closing Infrared Beam Wiring (Photon Infrared Beams)
71
Wireless Photon SMART Beams
71
External Radio Receiver and Loop Detector Wiring
71
Solar Panel Wiring
71
Earth Spike Installation
71
Commissioning the System
71
Apply Warning Decal
71
Solar Panel Wiring
75
Commissioning the System
80
General Maintenance
82
Gate Maintenance
82
Product Ancillaries
83
Installation Handover Checklist
84
Warranty Information
86
Advertisement
Advertisement
Related Products
Centurion D2 Turbo Low-Voltage
Centurion D2 Turbo
Centurion D5
Centurion D3
Centurion D5-EVO REPAIR
Centurion D10
Centurion D Series
Centurion D5-Evo SMART
Centurion D6 SMART
Centurion DE330
Centurion Categories
Gate Opener
Garage Door Opener
Bicycle
Intercom System
Boat
More Centurion Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL