Sign In
Upload
Manuals
Brands
CASE CONSTRUCTION Manuals
Excavators
CX75C SR
CASE CONSTRUCTION CX75C SR Manuals
Manuals and User Guides for CASE CONSTRUCTION CX75C SR. We have
1
CASE CONSTRUCTION CX75C SR manual available for free PDF download: Operator's Manual
CASE CONSTRUCTION CX75C SR Operator's Manual (256 pages)
Midi Excavator
Brand:
CASE CONSTRUCTION
| Category:
Excavators
| Size: 18 MB
Table of Contents
Table of Contents
2
General Information
7
Note to the Owner
7
Intended Use
8
Electro-Magnetic Compatibility (EMC)
9
Telematics
9
Product Identification
10
Machine Orientation
13
Machine Components
14
California Proposition 65 Warning
16
Safety Information
17
Signal Word Definitions
17
Safety Rules
18
Hand Signals
27
Safety Signs
31
Controls/Instruments
49
Access to Operator's Platform
49
Frame - Access/Exit
49
Operator's Seat
51
Pneumatically-Adjusted Operator Seat - Control Identification
51
Forward Controls
54
Hand Control Levers and Pedals
54
Dozer Blade Control Lever
57
Offset Boom Controls
58
Windshield
59
Front Lower Window
60
Front Right-Hand Console
61
System Display and Function Control Panel
62
Monitor Switches
66
Menu Screen Display
68
Clock Adjustment
73
Left-Hand Side Controls
74
Heating, Ventilation or Air-Conditioning Control
76
Gate Lock Lever
80
Cab Internal Lighting
80
Emergency Exit Hammer
80
Tool Quick Coupler Locking and Unlocking Control Switch (Optional)
81
Sliding Windows on Door
81
Right-Hand Side Controls
82
Power Sockets
84
Coat Hanger Hook
84
Cup Holder
84
Cab Radio
85
Rearward Controls
87
Fuse Box
87
Magazine Rack
87
Overhead Controls
88
Roof Curtain
88
Roof Hatch
88
Exterior Controls
89
Fuel Tank
89
Rear View Mirrors
90
Rear View Camera (Option)
93
Side Doors
94
Battery Disconnect Switch
95
Engine Hood
96
Lower Panels
97
Windshield Washer Reservoir
98
Load Handling Eyes
99
Towing Holes
100
Safety Valves (Optional)
101
Optional Tool Supply Valves
101
Fuel Tank Filler Pump (if Equipped)
102
Cab Protection (ROPS and FOPS)
104
Operating Instructions
105
Starting the Unit
105
Anti-Theft Protection
105
Starting the Engine
108
Bringing the Machine up to Operating Temperature
110
Engine Operation
111
Operating the Machine in Hot or Cold Weather
112
Machine Operation
113
Stopping the Unit
114
Stopping the Engine
114
Moving the Unit
115
Machine Travel
115
Operating the Machine
118
Load Handling
120
Quick Coupler (Optional)
123
Lowering the Attachment in the Event of a Failure
128
Auxiliary Hydraulic Circuits
129
Bucket Replacement
134
Parking the Unit
135
Parking the Machine
135
Transport Operations
137
Shipping Transport
137
Transporting the Machine
137
Tie Downs for Shipping - Procedure
142
Handling the Machine
144
Recovery Transport
146
Towing the Machine
146
Maintenance
147
General Information
147
Basic Instructions
147
Consumables
151
Capacities
156
Releasing Pressure in the Hydraulic System
157
Breaker : Hydraulic Filters and Hydaulic Oil Replacement
158
Break-In Period
159
Maintenance Chart
160
Every 10 Hours
162
Engine Oil Level
162
Hydraulic Oil Level
163
Engine Coolant Level
164
Fuel Tank
164
Every 50 Hours
165
Grease Points (Arm and Backhoe Bucket)
165
Grease Points (Boom)
167
Grease Points (Offset Boom)
169
Grease Points (Dozer Blade)
171
Grease Points Quick Connect Tool (Optional)
172
Tracks
173
Air Conditioner Filters
176
Every 250 Hours
177
Engine Primary Air Filter
177
Travel Reduction Unit Oil
179
Hydraulic Oil Tank
179
Fuel Pre-Filter
180
Batteries
183
Belt Tension
186
Track Shoe Bolt Torque
188
Track Rollers and Idler Wheels
188
Cab Protection (ROPS and FOPS)
189
Tightening Torques
190
Every 500 Hours
191
Engine Oil and Filter
191
Fuel Filter
193
Radiator and Coolers
196
Swing Bearing
197
Every 1000 Hours
198
Engine Coolant
198
Hydraulic Reservoir Breather
201
Engine Air Filters
202
Travel Reduction Unit Oil
203
Alternator
204
Starter Motor
204
Engine Valve Rocker Clearance Adjustment
204
Hydraulic Fluid Analyse
204
Grease Points (Easy Maintenance System)
205
Every 2000 Hours
206
Hydraulic Suction Filter
206
Hydraulic Return Filter
207
Pilot Line Filter
208
Air Conditioner Filters
209
Every 4000 Hours
210
Hydraulic Hoses
210
Pump Outlet Hose
210
Every 5000 Hours
211
Hydraulic Oil and Filters
211
When Necessary
214
Plastic and Resin Parts
214
Cylinders
214
Bucket Teeth
214
Gas Spring Inspection
216
Fuel Tank Filter
217
Fuel Pre-Filter
217
Feed Pump
218
Air Conditioning System
219
Lamps and Bulbs
220
Quick Coupler
222
Fuses
224
Protecting the Electronic and Electrical Systems During Battery Charging or Welding
226
Storage
227
Preparing for Storage
227
Periodic Checks
228
Starting up the Machine
229
Troubleshooting
231
Fault Code Resolution
231
Engine Troubleshooting
231
Specifications
233
Machine Specifications
233
Dimensions
236
Weights
247
Advertisement
Advertisement
Related Products
CASE CONSTRUCTION CX210D
CASE CONSTRUCTION CX31B
CASE CONSTRUCTION CX250D 2015
CASE CONSTRUCTION CX37C
CASE CONSTRUCTION CX245D SR
CASE CONSTRUCTION CX55B
CASE CONSTRUCTION CX160C
CASE CONSTRUCTION CX27B
CASE CONSTRUCTION CX30C
CASE CONSTRUCTION CX26C
CASE CONSTRUCTION Categories
Excavators
Compact Loader
Construction Equipment
Portable Generator
Tractor
More CASE CONSTRUCTION Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL