Sign In
Upload
Manuals
Brands
Bauer Compressors Manuals
Industrial Equipment
UN 4i 25
Bauer Compressors UN 4i 25 Manuals
Manuals and User Guides for Bauer Compressors UN 4i 25. We have
1
Bauer Compressors UN 4i 25 manual available for free PDF download: Instruction Manual And Replacement Parts List
Bauer Compressors UN 4i 25 Instruction Manual And Replacement Parts List (170 pages)
Stationary Integrated Systems High Pressure Breathing Air System
Brand:
Bauer Compressors
| Category:
Industrial Equipment
| Size: 7 MB
Table of Contents
Fcc Compliance Statement
3
Table of Contents
4
Chapter 1: Introduction
13
How to Use this Manual
13
Manual Safety Notices
13
How to Use the Replacement Parts List
14
How to Use the Appendix
15
Figure 1-1 Compressor Identification Label
15
Unit Specifications
16
UNICUS 4I - 25
16
Compressor Block
16
Compressor Drive
16
Purification System Applicability
16
Component Locations
17
Figure 1-2 UNICUS 4I
17
Figure 1-3 UNICUS 4I Rear
18
Figure 1-4 UNICUS 4I Front Panel
19
Chapter 2: Operating Instructions
20
Figure 2-1 Control Panel
20
Emergency Stop Button
20
Operator Interface
20
Badge Screen
20
Admin. Main Menu Screen
21
Figure 2-2 Initial Screen
21
Figure 2-3 Admin. Main Menu Screen
21
Personnel
22
Figure 2-4 Personnel
22
Cylinders
23
Figure 2-5 Add New
23
Figure 2-6 Cylinders
23
Settings
24
Figure 2-7 Add New Cylinder
24
Figure 2-8 Settings
24
Setup
25
Parameters
25
Figure 2-9 Setup
25
Figure 2-10 Parameters
25
Maintenance
26
Gas Sensor
26
Reports
26
Diagnose
26
Figure 2-11 Reports
26
Home Screen
27
Figure 2-12 Diagnostic
27
Figure 2-13 Home Screen, Operator
27
Compressor Status
28
Fill Cylinders
28
Figure 2-14 Compressor Status
28
Remote Fill
29
Figure 2-15 Fill Cylinders
29
Fill Station Operation
30
Figure 2-16 Bottle Riser
30
Remote Fill Connection
31
Figure 2-17 Bottle Valve Sequences
31
Connecting an Air Bottle
32
Filling the Air Bottle
32
Removing the Air Bottle
32
Description
33
Component Location
33
Figure 3-1 Compressor Block (Front View)
33
Air Flow Diagram
34
Intake Filter
34
Lubrication System
34
Description
34
Figure 3-2 Five Stage Compressor Air Flow
34
Oil Level Check
35
Oil Change Interval
35
Oil Capacity
35
Oil Change
35
Lubrication Oil System Figure 3-4 Oil Sight Gauge
35
Figure 3-5 Oil Sight Gauge & Drain
36
Removing the Oil Filter Cover Figure 3-7 Replacing the Oil Filter
36
Venting the Oil Pump
37
Intake Filter
37
Description
37
Maintenance
37
Figure 3-8 Intake Filter
37
Interstage Separators
38
Description
38
Maintenance
39
Figure 3-9 2Nd Stage Interstage Separator
39
Figure 3-10 3Rd & 4Th Stage Interstage Separator
39
Compressor Valves and Valve Heads
40
Functional Description
40
Initial Operational Check of the Valves
40
General Instructions for Changing the Valves
40
Figure 3-11 1St Stage Valve Function
40
Figure 3-12 Valve Function
40
Changing the 1St Stage Valves
41
Removal Procedure
41
Figure 3-13 1St Stage Valve and Head
41
Installation Procedure
42
Changing the 2Nd Stage Valves
42
Removal Procedure
42
Figure 3-14 2Nd Valve Head and Valves
42
Changing the 3Rd Stage Valves
43
Removal Procedure
43
Installation Procedure
43
Figure 3-15 3Rd Stage Valve Head and Valves
43
Changing the 4Th/5Th Stage Valves
44
Figure 3-16 4Th/5Th Stage Valve and Head
44
Discharge Valve Removal Procedure
45
Discharge Valve Installation Procedure
45
Figure 3-17 Discharge Valve Removal
45
Inlet Valve Removal and Installation
46
Repair and Troubleshooting
46
Repair
46
Figure 3-18 Assembly Tool
46
Figure 3-19 Using Special Tool
46
Troubleshooting
49
Replacement Parts List
50
Figure 3-20 Crankcase Assembly
50
Figure 3-21 Complete Crankshaft Assembly
52
Figure 3-22 1St Stage Piston and Cylinder
53
Figure 3-23 2Nd & 4Th Stage Piston and Cylinder
54
Figure 3-24 3Rd Stage Piston and Cylinder
56
Figure 3-25 5Th Stage Cylinder and Piston
57
Figure 3-26 1St Stage Valve Head
58
Figure 3-27 2Nd Stage Valve Head
59
Figure 3-28 3Rd Stage Valve Head
60
Figure 3-29 4Th Stage Valve Head
61
Figure 3-30 5Th Stage Valve Head
62
Figure 3-31 Flywheel Drive Assembly
63
Figure 3-32 Intake Filter Assembly
64
Figure 3-33 1St Stage Interfilter (Optional)
66
Figure 3-34 2Nd Stage Interstage Separator
68
Figure 3-35 3Rd Stage Interstage Separator
69
Figure 3-36 4Th Stage Interstage Separator
70
Figure 3-37 Cooling System Assembly
72
Figure 3-38 Lubricating System Assembly
74
Figure 3-39 Lubricating System
75
Figure 3-40 Crankcase Venting
76
Automatic Condensate Drain System; Asy-4011
77
Description
77
Figure 3-41 Automatic Condensate Drain System
77
Block Regulator Assembly
78
ACD Operation
78
Figure 3-42 120 II Block Regulator Assembly
78
Figure 3-43 ACD Operation Diagrams
78
Start Unloading
79
Standstill Drainage
79
Condensate Drain Separator
79
ACD Maintenance
79
Condensate Collector
80
Figure 3-44 Condensate Collector
80
ACD Replacement Parts List
82
Figure 3-45 ASY-4011 Replacement Parts List
82
Figure 3-46 ACD Assembly, ASY-4001
84
Figure 3-47 ACD O-Rings
86
Figure 3-48 Regulator Assembly
87
Trouble Shooting
88
Introduction
89
General Purification System Procedures
89
Chamber Safety Bore
89
Manual Condensate Drainage
90
Model, Serial Number and Part Number Identification
90
Compressor Data Plate
90
Figure 4-1 Cartridge Safety Venting
90
Figure 4-2 P0 & P31 Safety Venting
90
Figure 4-3 Purification System Data Plates (Typical)
90
Purification System Data Plate
91
Cartridge Installation Data Plate
91
Purification System Configurations
91
Industrial Purification System Configurations
92
Cartridge Operating Life
92
Calculating the Maximum Cartridge Operating Hours
93
Calculating the Adjusted Cartridge Operating Hours
93
Chambers
93
Figure 4-4 Correction Factor for Cartridge Operating Hours
94
Figure 4-5 Example Record of Adjusted Operating Hours
94
Purification Cartridge Operating Hours Form
95
1P5S Securus II® Purification System
96
P5S Securus II® Purification System Major Components
96
Figure 4-6 P5S Securus II® Purification System
96
Component Description
97
Oil and Water Separator
97
Chamber
97
Cartridge
97
Cartridge Construction
97
Figure 4-7 Oil and Water Separator Labels
97
Securus II ® Electronic Moisture Monitor System
98
Cartridge Handling
98
Condensate Drain Valve
98
Check Valves
98
Bleed Valve
98
Pressure Maintaining Valve
98
Safety Valve
98
Securus® Cartridge
98
Transmitter
98
Maintenance
99
Oil and Water Separator
99
Figure 4-8 Oil and Water Separator
100
Figure 4-9 Sintered Metal Filter Assembly
100
Removal of the Securus II® Transmitter
101
Cartridge Replacement
101
Figure 4-10 Removal of the Securus II® Transmitter
101
Figure 4-11 Cartridge Replacement
101
Leaking at the Safety Bore
102
Replacement Parts List
103
Figure 4-12 P5 Purification System Parts List
103
Figure 4-13 Oil and Water Separator Parts List
104
Figure 4-14 27" Chamber Assembly Parts List
105
Figure 4-15 Securus II® Electronic Moisture Monitor System Parts List
106
Vertical Compressor Drive
108
Maintenance of the V-Belt and Sheaves
108
Check the Sheaves
108
Figure 5-1 Vertical Drive with Idler (Typical)
108
Check the V-Belt
109
Replacing the Belt
109
Replacing the Sheave
109
Figure 5-2 Tensioning 1
109
Figure 5-3 Tensioning 2
109
Replacement Part List
110
Figure 5-4 UNICUS 4I, Vertical Drive with Idler
110
Overview
111
Electrical Panel
111
Wiring Diagram
111
Electrical Panel Interior Access
111
Figure 6-1 ASY-1191
111
Ac Power Requirements
112
Figure 6-2 Electrical Panel Label
112
Figure 6-3 PLC, CNT-0104
112
Electrical Panel Components
112
Programmable Logic Controller (PLC)
112
Input Leds
112
Replacing the PLC
113
Installing a New Program
113
Figure 6-4 Connector Block Removal
113
Installing a Memory Card
114
Hour Meter
114
Motor Starter
114
Figure 6-5 Hour Meter
114
Overload Relay
115
Power Supply
115
Motor Starter (Typical) Figure 6-7 Overload Relay (Typical)
115
Figure 6-8 Power Supply
115
Alarms
116
Final Separator Warning
116
Compressor High Temperature
116
Figure 6-9 High Temperature Switch
116
Figure 6-10 Pressure Sensor (Typical)
116
Compressor Low Oil Pressure
117
Replacement Parts List
118
Figure 6-11 Electrical Panel, Interior
118
Chapter 7
120
Description
120
Components
120
Figure 7-1 Components
120
Rfid Option
120
Functions
121
Assigning the Cylinder
121
Filling the Cylinder with RFID Option
121
Kit-0585
121
Figure 7-2 Add New Cylinder
121
Figure 7-3 KIT-0585
122
Replacement Parts List
123
Figure 7-4 RFID Assembly
123
Figure 7-5 KIT-0585
124
Description
125
Operation
125
Figure 8-1 Regulator & Monitors
125
Calibration
126
Figure 8-2 Basic Calibration Kit & Test Gases
126
Replacement Parts
128
Figure 8-3 Regulator and Monitors
128
Figure 8-4 Monitors
129
Figure 8-5 Calibration Components
130
Description
131
Fill Station Air Flow
131
Maintenance
131
General Maintenance
131
Nonadjustable Valves
132
Pressure Gauges
132
Safety Valves
132
Pneumatic Connections
132
Figure 9-1 Safety Valves
132
Bearings for Bottle Door Pivot
133
Pressure Hoses
133
Door Gas Spring
133
Figure 9-2 Special Tool, TOO-0020
133
Replacement Parts List
134
CFS III Assemblies
134
Figure 9-3 CFS III Assembly
134
Figure 9-4 Fill Whips & Brackets
135
Figure 9-5 CFS III Door Lock Assembly
136
Figure 9-6 Door Handle, Pivot and Bracket
137
Figure 9-7 CFS III Door Interlock
138
Fill Hose Assemblies
139
Figure 9-8 Standard Fill Hose Assemblies
139
Figure 9-9 Fill Whips with Options
140
Chapter 10
142
Bottle Specifications
142
ISO/UN; ISO 9809-PART2 / United Nations
142
ASME; American Society of Mechanical Engineers
142
Chapter 11
142
Description and Maintenance
143
Description
143
Maintenance
144
Storage Bottles
144
Pressure Gauges
144
Figure 10-1 UNICUS III Storage Systems
144
Tube Connections
145
Safety Valve
145
Pressure Hoses
145
Figure 10-2 Safety Valve; VAL-0022
145
Autocascade System
146
General
146
Figure 10-3 Autocascade System
146
Electrical
147
Filling the Storage Banks
147
Filling Bottles from the Storage Banks
147
Manual Bypass
147
Chapter 11
148
Safety
148
General Safety Precautions
148
Safety Warning Labels
150
Unpacking, Handling and Installation
151
Unpacking and Handling
151
Figure 11-1 Lifting Devices
151
Installation of the Compressor Unit
152
General
152
Figure 11-2 Leveling Feet
152
Ventilation
153
Outdoor Installation
153
Indoor Installation
153
Natural Ventilation
153
Forced Ventilation
154
Intake Gas
154
Inside Gas Source
154
Outside Gas Source
155
Compressor Intake Piping
155
Installation Procedures
156
Electrical Installation
156
Electric Drive
156
Electrical Supply
156
Figure 11-3 Example of Gas Intake Piping
156
Figure 11-4 Incoming Power Wiring Label
157
Pneumatic Leaks
158
Long Term Storage
159
General
159
Preparations
159
Units Equipped with a Filter System
159
Preserving the Compressor
159
Preventive Maintenance During Storage
160
Lubrication Oils for Preservation
160
Reactivating the Compressor Unit
160
Reproducible Forms
161
Scheduled Maintenance Form
161
Cartridge Operating Hours
164
Record of Operating Hours
165
Reference Data
166
Tightening Torque Values
166
Torque Sequence Diagrams
166
Conversion Formulas
166
Figure 11-5 6 Bolt and 4 Bolt Torque Sequence
166
Approved Lubricants Chart
167
Glossary of Abbreviations and Acronyms
167
Additional Documents
168
Diagrams and Drawings
168
Other Documents
168
Unit Information
169
Advertisement
Advertisement
Related Products
Bauer Compressors BF 100-6
Bauer Compressors UNICUS 4i-25
Bauer Compressors Categories
Air Compressor
Industrial Equipment
Air Cleaner
More Bauer Compressors Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL