Sign In
Upload
Manuals
Brands
Bard Manuals
Air Conditioner
Fusion-Tec
Bard Fusion-Tec Manuals
Manuals and User Guides for Bard Fusion-Tec. We have
2
Bard Fusion-Tec manuals available for free PDF download: Installation Instructions Manual, Quick Start Manual
Bard Fusion-Tec Installation Instructions Manual (41 pages)
Brand:
Bard
| Category:
Air Conditioner
| Size: 2 MB
Table of Contents
Installation Instructions
1
Table of Contents
2
General Information
3
Shipping Damage
4
Figure 24 Communication Wiring: Termination Table
4
List of Necessary Materials/Tools
6
Figure 25 Communication Wiring: Termination Table
6
Site Preparation
7
FIGURES and TABLES Figure 1 FUSION-TEC Model Nomenclature
7
Model Identification
7
New Shelter Installation Vs. Retrofit Installation
7
Clearance Required for Service Access and Adequate Condenser Airflow
8
Clearance to Combustibles
8
Minimum Clearance
8
Minimum Clearance Required to Combustible Materials
8
Figure 2 Dimensions
9
Supply Air Grill Installation
10
Hoses
11
Access to Control Panel
11
Figure 5 Fold-Out Diverter
12
Figure 6 Downward Curved Diverter Blades
12
Figure 7 View of Installed Grille
12
Figure 8 Mounting Instructions
13
Figure 9 Electric Heat Clearance
14
Figure 10 Wall Mounting Instructions
14
Figure 11 Wall Mounting Instructions
15
Figure 12 Common Wall Mounting Installations
15
Wall-Mount Unit Mounting
10
Mounting the Units
10
Wall-Mount Unit Wiring
16
Main Power Wiring
16
Electrical Specification
16
Unit Voltage Wiring
17
Figure 13 Wire Routing
17
Landing Points
17
Transformer
18
Preliminary Start up
19
Running in Stand Alone (Orphan) Mode
19
Figure 16 Cool and Heat Setpoints
19
Figure 17 Typical LV1000 Component Location
20
LV1000 Controller
21
Figure 18 LV1000 Fused Power Supply Terminal
21
Mounting the LV Controller
21
Installing Remote Indoor Temperature/Humidity Sensor(S)
22
Sensor Installation
22
Figure 20 Additional Remote Sensor Installation
23
Additional LV1000 Connections
24
Communication Wiring
25
Figure 21 Communication Wiring (Daisy Chain)
25
Figure 22 Communication Wiring (Alt. Method)
25
Figure 23 Placement of Communication Filters
26
At the Controller
27
Figure 24
27
At the First Wall-Mount Unit
28
Figure 26 Communication Wiring: Termination at Additional Wall-Mount Units
29
Figure 3 Prefilling Traps on Indoor Drain Pan Figure
29
LV1000 Supply Wiring
30
LV1000-100 Controller Supply Wiring
30
Controller Grounding Posts
30
Figure 4 Hanging Front Access Panel to Allow Figure
31
LV1000-100 Terminal Block Index
31
Manual 2100-674A
31
Manual 2100-674A
32
WIRING: LV1000 Wiring Diagram
32
LV1000 Controller Installation
20
System Set up
33
TEC-EYE Hand-Held Diagnostic Tool
33
TEC-EYE Connection to Unit Control
33
TEC-EYE Display and Interface
33
LV1000/TEC-EYE Passwords (Default)
33
Setting up Wall-Mount Units for Operation
34
Changing Unit Setup Values
34
Changing Economizer Control Type
35
Executing Run Test
35
Clearing Unit Alarm Logs
35
Setting up LV1000 for Operation
36
LV1000 Controller Display/Interface
36
Changing Timezone
36
Setting Controller Date and Time
36
Configuring Indoor Humidity 1 Sensor
37
Configuring Indoor Humidity 2 Sensor
37
Configuring Indoor Humidity 3 Sensor
37
Configuring Indoor Temp 1 Sensor
38
Configuring Indoor Temp 2 Sensor
38
Configuring Indoor Temp 3 Sensor
38
Entering Total Number of Units
39
Verifying Units
39
Clearing LV1000 Alarm Logs
39
1 Address each Wall-Mount Unit
34
2 Execute a Run Test on each Unit
35
3 Clear Unit Alarm Logs
35
4 Set LV Controller Timezone and Date/Time
36
5 Configure Sensors
37
6 Enter Total Number of Units
38
7 Verify Units Are Online
39
8 Clear Controller Alarm Logs
39
9 Complete Installation
39
Additional Information
40
Adjusting Sensor Offset Value
40
Restoring Factory Default Settings
40
Unit Status Messages
41
LV1000 Status Messages
41
Advertisement
Bard Fusion-Tec Quick Start Manual (2 pages)
Free Cooling Unit System
Brand:
Bard
| Category:
Cooling boxes
| Size: 0 MB
Table of Contents
System Set-Up
1
Address Wall Unit and Select Unit of Measure (UOM) and Economizer Control Type (TEC-EYE)
1
Execute a Run Test on each Unit to Verify the Equipment Is Functioning Correctly (TEC-EYE)
1
Run Test Approximate Timings (in Minutes)
1
Clear Unit Alarm Logs
1
Set LV Controller Timezone and Date/Time (LV Controller)
2
Configure Sensors (LV Controller)
2
Enter Total Units (LV Controller)
2
Verify Units Are Online (LV Controller)
2
Clear Controller Alarm Logs (LV Controller)
2
Advertisement
Related Products
Bard FUSION-TEC HR Series
Bard FUSION-TEC WR Series
Bard FH085D36F
Bard FLR110D48F
Bard FLF085D36E
Bard FLF110D60E
Bard FLF085D36D
Bard FLR085D36D
Bard FLR140D60D
Bard FH110V48A
Bard Categories
Air Conditioner
Heat Pump
Medical Equipment
Furnace
Controller
More Bard Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL