Sign In
Upload
Manuals
Brands
Areva Manuals
Industrial Equipment
FLUOKIT M24+
Areva FLUOKIT M24+ Voltage Switchgear Manuals
Manuals and User Guides for Areva FLUOKIT M24+ Voltage Switchgear. We have
1
Areva FLUOKIT M24+ Voltage Switchgear manual available for free PDF download: Instructions Manual
Areva FLUOKIT M24+ Instructions Manual (60 pages)
Brand:
Areva
| Category:
Industrial Equipment
| Size: 3 MB
Table of Contents
Table of Contents
3
AREVA at Your Service
7
Our Service Unit: Our Specialists, and Suitably Adapted Services
7
AREVA T&D Training Centre: Your Training Partner
7
With Regards to this User Manual
8
Eco−Design Concept and Revalorisation of the Materials Used
8
Responsibilities
8
Reminder Concerning Normal Service Conditions (in Accordance with IEC 60694)
8
Permissible Ambient Temperature
8
Installation Altitude
8
Atmospheric Pollution
8
Permissible Atmospheric Humidity Level
8
Particular Instructions for Operations and Interventions on Energized Equipment
9
Other Technical Notices to be Consulted
9
Tools and Products (Not Supplied) Required for the Operations Described in this Notice
9
Symbols & Conventions
10
Tightening Torque Values for Standard Assemblies (Nut + Bolt)
10
Presentation
11
Description
11
Dimensions and Approximate Weight of the Functional Units
11
Presentation of the Functional Units
12
Packaging − Handling − Storage
16
Transport − Delivery
16
Packaging for the Functional Units
16
The Accessories Package
16
Reception/Acceptance
16
Location of the Technical Data Plates
17
Handling
17
Storage Conditions
18
Intervention Levels
18
Specific Recommendations for Storage Durations of Less than 6 Months
18
Specific Recommendations for Storage Durations of between 6 and 12 Months
18
Specific Recommendations for Storage Durations of between 12 and 24 Months
18
Unpacking and Installing the Equipment
19
Type of Civil Engineering
19
Unpacking the Functional Units
19
Handling the Functional Unit
19
Installation of a Switchboard
20
Installing Functional Units
20
Revalorizing Packaging Waste
20
Installation
21
Installation of each Functional Unit
21
Functional Units with Internal Arc Withstand Protection
21
Fixing the Functional Units to the Floor
22
Connection of the Inter−Functional Units Grounding Circuit
22
General Switchboard Earthing Connection to the Earthing Spike of the Building
22
Standard Busbar Connections
23
Connection of a 1250 a Busbar
24
Connection between 630 a and 1250 a Busbars
24
Connecting a 1,250 a Busbar to a 1,250 a Isolating Switch (PBB or
25
Coupling of a Fluokit M24+ Functional Unit to a Fluokit M24 Functional Unit
26
Connection of the HV Cables
27
Preparation of the HV Cable Connections
27
Connection Instructions
28
Preparation of the Cables
28
Connection of an IS Functional Unit
29
Connection of a PF or PFA Functional Unit
29
Clamping the Cables and Connection of the Screen Braids
30
Connection in a PGC or IS Functional Unit Equipped with Current Transformers
30
Earthing the Screen Braids
30
Fitting the Fuses on to the PF−PFA Functional Units
31
The Sensors (Rings) for Fault Detection and Signalling
32
Mounting the Rings
32
Special Instructions at the End of the Connections
32
Connection of the Low Voltage Circuits
33
Marking the Functional Unit on the LV Box Cover
33
Motorised Remote Control Interface for the Switches [Option]
33
Connection of the "Metering" Low Voltage Wiring to the PGB Functional Unit
34
Connection of the "Metering" Low Voltage Wiring to the TM Functional Unit
34
Double Shunt Layout Function
35
Foolproofing of the Remote Control Connector [Public Distribution]
35
Identification and Function of the Pins [Public Distribution]
36
Mounting and Connection of the Rings
36
Commissioning the Double Shunt Layout
36
Normal/Backup Function
37
Principle
37
Presentation
37
Mechanical Interlocking Forbidding Connection in Parallel
38
Operating Accessories and Instructions
39
Reminder
39
Wall Storage Rack (Optional)
39
Operation of a Functional Unit Equipped with a C410−C410S−C410M Control
39
Operation of a Functional Unit Equipped with a C430−C430M Control
39
Operation of a Functional Unit Equipped with a C440−C440M Control
40
Cable Testing
40
Installing the Removable Earthing Switch Device
40
Operating the TM Functional Unit
41
Operating Manoeuvres for the TM Functional Unit
41
Operating the PGB Functional Unit
42
Opening the Upstream and Downstream Earthing Switches
42
Closing the Load Break Switch
42
Closing the Circuit Breaker
43
De−Energizing a PGB Functional Unit
43
Operating the PGC Functional Unit
44
Opening the Downstream Earthing Switch
44
Opening the Upstream Earthing Switch
44
Closing the Load Break Switch
45
Closing the Circuit Breaker
45
De−Energizing a PGC Functional Unit
45
Locking−Out and Locking Operations
46
Functional Mechanical Interlocks
46
Locking−Out by Padlock (Not Supplied)
46
Locking−Out by Key Locks
47
Commissioning
48
Reminder
48
Inventory of Tools and Accessories on Completion of Work
48
Pre−Commissioning Information
48
Final Checks before Commissioning
48
Energising the "Incoming" Functional Unit
49
Energising a Second 'Incoming' Functional Unit, Supplied from the same Source
49
Control of Phase Balance with a VPIS Voltage Presence Indicator (in Accordance with IEC61958)
49
Energizing the Switchboard
49
Maintenance
50
Levels of Maintenance
50
Preventive Maintenance for the Mechanical Control Mechanisms
50
Preventive Maintenance of the Functional Units
50
Checking HV Connections (Busbars, Cables, Etc.)
51
Specific Case - Switchboards Assembled by AREVA
51
Specific Case - Request for Systematic Verification of Torque Levels (Vibration, Etc.)
51
Greasing of the Contact Surfaces
51
Corrective Maintenance
52
Replacement of the Three HV Fuses
52
Replacement of the VDS (Voltage Detection System − LV Capacitors)
52
Possible Anomalies and Remedies
53
Spare Parts
54
The Spare Part
54
Identification of the Equipment (See § 4.5)
54
Storage Conditions
55
Maintenance Consumables
55
At the End of the Equipment's Operational Life
56
Valorisation of the Equipment
56
Safety Instructions
56
Dismantling of the Equipment Service
56
Specific Recommendations for the "SF6 Gas" Type Circuit Breaker and Load Break Switch
57
Distribution and Valorisation of the Materials Used for PGB (See § 19.1)
57
Notes
58
Advertisement
Advertisement
Related Products
Areva MCAG 19
Areva MVAJ10
Areva MVAJ20
Areva MVAG
Areva MVAG 14
Areva MVAG 34
Areva MVAG 15 MVAG 35
Areva MVAG 17
Areva MVAG 37
Areva MVAG 38
Areva Categories
Relays
Switch
Circuit breakers
Industrial Equipment
Desktop
More Areva Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL