Sign In
Upload
Manuals
Brands
ApenGroup Manuals
Heater
PCH160
ApenGroup PCH160 Manuals
Manuals and User Guides for ApenGroup PCH160. We have
2
ApenGroup PCH160 manuals available for free PDF download: Maintenance And Service Manual
ApenGroup PCH160 Maintenance And Service Manual (44 pages)
Condensing Warm Air Heater Module
Brand:
ApenGroup
| Category:
Industrial Equipment
| Size: 2 MB
Table of Contents
Table of Contents
4
General Cautions
5
Safety Instructions
5
Fuel
5
Gas Leaks
5
Power Supply
6
Use
6
Maintenance
6
Transport and Handling
6
Unpacking
7
Disposal and Demolition
7
Installation
7
Technical Data
8
Regulation (EU) 2016/2281
11
Operating Cycle
12
Air/Gas Premixing Operation
13
User Instructions
14
Operation of the Heater
14
Interface Panel
14
Reset
16
Flame Indication LED
16
Modulation PCB Parameters
19
Analysis of Lockouts - Exx
24
Connections to the Flue
27
Condensate Drain
29
Gas Connection
30
Starting up for the First Time
35
Combustion Analysis
36
Conversion to LPG
36
Conversion to Gas G25 - G25.1 - G27
37
Conversion to Gas G2.350
37
Replacing the Gas Valve
37
CPU Modulation PCB Replacement
38
Maintenance
38
Wiring Diagrams
40
Analysis of Faults
41
List of Spare Parts
42
Parts for the Electrical Panel
42
Parts for the Burner Unit
43
Other Spare Parts Available
44
Advertisement
ApenGroup PCH160 Maintenance And Service Manual (40 pages)
condensing warm air heater module
Brand:
ApenGroup
| Category:
Heater
| Size: 7 MB
Table of Contents
Table of Contents
3
1 General Cautions
4
2 Safety Instructions
4
Fuel
4
Gas Leaks
4
Power Supply
4
Operation
5
Maintenance
5
Transport and Handling
5
Dismantling and Demolition
5
Installation
5
3 Technical Data
6
Regulation (EU) 2016/2281
9
4 Operating Cycle
10
Air/Gas Premixing Operation
11
5 User Instructions
12
Operation of the Heater
12
Interface Panel
12
Reset
13
Modulation PCB Parameters
14
Analysis of Lockouts - Faults
18
Connections to the Flue
20
Condensate Drain
22
Gas Connection
23
Starting up for the First Time
28
Combustion Analysis
28
Conversion to LPG
29
Conversion to Gas G25 - G25.1 - G27
29
5.13. Conversion to Gas G2.350
30
5.14. Replacing the Gas Valve
30
5.15. Replacing the Modulation PCB
31
6 Maintenance
31
7 Wiring Diagrams
35
8 Analysis of Faults
36
9 List of Spare Parts
37
Parts for the Electrical Panel
37
Parts for the Burner Unit
38
Other Spare Parts Available
39
Advertisement
Related Products
ApenGroup PCH105
ApenGroup PCH130
ApenGroup Aermax PCH132
ApenGroup Aermax PCH162
ApenGroup Aermax PCH045
ApenGroup Aermax PCH065
ApenGroup PCH080
ApenGroup Aermax PCH210
ApenGroup Aermax PCH320
ApenGroup Aermax PCH212
ApenGroup Categories
Heater
Boiler
Water Heater
Air Handlers
Thermostat
More ApenGroup Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL