Sign In
Upload
Manuals
Brands
AHRI Manuals
Air Conditioner
OM 210
AHRI OM 210 Manuals
Manuals and User Guides for AHRI OM 210. We have
1
AHRI OM 210 manual available for free PDF download: Operation Manual
AHRI OM 210 Operation Manual (82 pages)
UNITARY SMALL AIR-CONDITIONERS AND AIR-SOURCE HEAT PUMPS (INCLUDES MIXED-MATCH COILS) (RATED BELOW 65,000 BTU/H) CERTIFICATION PROGRAM
Brand:
AHRI
| Category:
Air Conditioner
| Size: 1.73 MB
Table of Contents
Table of Contents
5
Applicable Rating Standard
9
Unitary Small Air-Source Heat Pumps (and MIX-Matched Coils Certification Program (USHP)
10
Original Equipment Manufacturer (OEM) Applicants
11
STEP 2.1.4 Qualification Testing
12
STEP 2.2.1 Certification Application Package
13
Location of Test
14
System Manufacturer's Required Equipment Provisions
15
Tests, Air-Conditioning (Systems and MIX-Matched Coils)
16
Disqualified Unit
17
Alternate Outdoor Unit Failures
18
First Sample Certified Rating Test Failure
18
Test Sampling Plan Failure
18
Following a First Sample Failure
19
Test Additional Samples Option
19
Re-Rate Following First Additional Test "Second Sample
20
Re-Rate Following Test Additional Sample
20
Statistical Analysis Procedure
20
Consequences for Improper Ratings
21
Double Selection Mode Requirements
21
NAECA and Energy Policy Act (EPACT) Re-Rating Requirements
21
Penalty Mode Requirements
21
Probation Mode Requirements
21
Test Sample Refrigerant Charge
21
Challenge Tests
21
System Manufacturer Challenges
21
ICM Challenges
21
Test the System HSVTC
21
ICM Challenge Test Failure
22
ICM Challenge Test Pass
22
System Challenge Test Failure
22
Test the ICM Match
22
Test Challenge Fees
22
Final Outcome ICM Challenge Test Failure
22
Final Outcome ICM Challenge Test Pass
22
Final Outcome System Challenge Test Failure
22
AHRI Directory of Certified Product Ratings Data Listings
23
Publication of Ratings in Certified Directory
23
Data Forms
23
Making Changes to Submissions
23
NAECA Requirements
23
DOE Approved Alternate Rating Method
24
ARM Ratings and Test Report Submission
24
Minimum Requirements of Test Reports Submitted to AHRI by Participants
24
Designation of Highest Sales Volume Tested Combination (HSVTC)
24
Challenge of HSVTC Designation
24
Single-Speed, Split System Air-Conditioner Requirements
24
Split System Heat Pumps
24
ICM Listing Requirements
24
Heat Pump Listing Requirements
25
Identical Coil Ratings
25
Listing Equipment with Enhancement Components
25
ICM Notice of Revised System HSVTC And/Or Baseline Rating
25
Test Locked Ratings
25
Specific Indoor Coil Data
25
Condenser Curve Coefficients
25
Rating Screening for Icms
25
Air-Conditioner Regional Label Requirement
26
Coil Geometry Screening
26
DOE Regional Standard Requirements
26
Entering Data above 6% Screen
26
Internal Refrigerant Volume (IRV) Screening
26
Condenser Characteristics
27
Regional Efficiency Range
27
Regional Standards for Mass Upload Add/Edits
27
Regional Standards for Single Line Add/Edits
27
Assessment and Payment of Certification Fees
27
Equipment Delivery/Disposal Fees
27
Issuance of Violations And/Or Termination
27
Program Hierarchy, Complaints, and the Appeals Process
27
Proper Use of the AHRI Certification Mark and Claims to Certification
27
Appendix A Requirements for Certification of ICM Heat Pump Ratings
28
Table B1 AHRI Submittal Requirements for High or Single Stage
30
Appendix B Condenser Curve Information
30
Table B2 AHRI Submittal Requirements for Low Stage
31
Figure B1 Equation Coefficients
32
Table B3 DOE HSV Test Data
33
Table B4 Simulation Inputs for High or Single Stage
33
Table B5 Simulation Inputs for Low Stage
34
Figure B2 Typical Condenser Capacity Curve
35
Figure B3 Typical Condenser Power Curves
35
Figure C1 Use of Provisionally Qualified Outdoor Units for ICM Testing
36
Appendix C Condensing Units for Coil Only Certification
36
Figure C2 Use of Unqualified Outdoor Units for ICM Testing
37
Figure D1 Selection and Testing Process
38
Appendix D Compliance Program Flow Charts
38
Figure D2 System Manufacturer First Test Failure Options
39
Figure D3 ICM First Test Failure Options
40
Figure D4 ICM Second Sample Test
41
Figure D5 Test Additional Samples Process
42
Figure D6 System Manufacturer Test Additional Samples Failure Options
43
Figure D7 ICM or System Manufacturer First or Additional Sample Failure Options
44
Table E1 ICM BMG Definitions
45
Table E2 ICM BMG Bucket - Coil Capacity
46
Appendix E Independent Coil Manufacturer BMG Definitions
46
Appendix F Setup, Commissioning and Operating Checklist for Laboratory Personnel
47
Appendix G Coil Geometry Screening
48
Figure G1 Part 1 of the ORNL Flowchart
49
Figure G2 Part 2 of the ORNL Flowchart
50
Figure G3 Part 3 of the ORNL Flowchart
51
Appendix H Uniform Test Method for Measuring the Energy Consumption of Central Air Conditioners and Heat Pumps - Normative
52
Table of Contents
54
Test Procedure
58
Test Setup
59
Data to Collect
62
Application of Code Tester Correction Factors
63
Interpretation and Application of the Data
63
Sensible Capacity Energy Balance
63
Equipment Classification
65
Equipment Size and Configuration
65
Evaluation of Thermal Energy Storage Effect for C Testing
65
Purpose of the Test
65
Reporting and Retention of the Data
65
Selection of Equipment
65
Test Setup
65
Data to Collect
66
Running the Test Procedure
66
Interpretation and Application of the Data
67
Equipment Classification
68
Equipment Size and Configuration
68
Evaluation of External Static Pressure Measurement System
68
Purpose of the Test
68
Reporting and Retention of the Data
68
Selection of Equipment
68
Test Setup
69
Data to Collect
70
Interpretation and Application of the Data
70
Running the Test Procedure
70
Equipment Classification
71
Equipment Size and Configuration
71
Full System Psychrometric Round Robin Testing
71
Purpose of the Test
71
Reporting and Retention of the Data
71
Secondary Capacity Check Type
71
Selection of Equipment
71
Test Setup
71
Test System Preparation/Charge
71
Test System Preparation/Cyclic
71
AHRI 210/240 Standard Tests
72
Capacity Measurement
72
Data to Collect
72
Evaluation of Latent Capacity Measurement
72
Interpretation and Application of the Data
72
Purpose of the Test
72
Reporting and Retention of the Data
72
Selection of Equipment
72
Minimum Data Collection Requirements
73
Running the Test Procedure
73
Test Setup
73
Interpretation and Application of the Data
74
Reporting and Retention of the Data
74
APPENDIX I Secondary Capacity Check Requirements
75
Advertisement
Advertisement
Related Products
AHRI OM 240
AHRI 4MXA2024A10NUA
AHRI 4MXA2036A10NUA
AHRI 4MXA2048A10NUA
AHRI 4MXA2060A10NUA
AHRI 4TXD2036A10NUA
AHRI 4TXD2060A10NUA
AHRI LX SERIES
AHRI RLNL-C 13 SEER Series
AHRI RLNL-C 14 SEER Series
AHRI Categories
Air Conditioner
Boiler
Heat Pump
Water Heater
Furnace
More AHRI Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL