Sign In
Upload
Manuals
Brands
ABB Manuals
Battery Charger
PD Control Box Depot
ABB PD Control Box Depot Manuals
Manuals and User Guides for ABB PD Control Box Depot. We have
1
ABB PD Control Box Depot manual available for free PDF download: Operation And Installation Manual
ABB PD Control Box Depot Operation And Installation Manual (117 pages)
for HVC 200/300/360 multi-outlet cabinet
Brand:
ABB
| Category:
Battery Charger
| Size: 57 MB
Table of Contents
Table of Contents
3
Introduction and General Information
5
Disclaimer and Warranty Conditions
5
Function and Target of this Document
5
Language
6
How to Use this Document
6
Abbreviations
6
Terminology
7
Document Revision History
8
Safety
9
Liability
10
Responsibilities and Qualifications for the Users
10
Intended Use
11
Risks Related to Improper Use or Product Defect
11
Residual Risks
12
General Signs and Signal Words
12
Symbol Description
12
Personal Protective Equipment
14
Safety Instructions
14
Safety Instructions During Transport
14
Safety Instructions During Installation
15
Safety Instructions During Cleaning or Maintenance
15
Safety Instructions During the Use
15
Discard the EVSE or Parts of the EVSE
16
Cyber Security
16
Conformity
16
Description
18
Orientation Agreements
18
Orientation Agreement
18
Type Plate - Identification of Equipment
19
EVSE Identification Code
19
System Overview
20
Overview
21
Overview of the System
21
PD Control Box - Overview
22
Overview - Outside
22
Overview - Inside
23
Overview - Cable Glands
25
Overview - Pantograph down
26
EVSE Status Beacon
28
Authorization to Charge
29
RFID (Radio Frequency Identification) Device
29
Long Distance Communication Kit
30
Long Distance Communication
30
Overview Inside - Long Distance Kit
30
Working Principles
31
Optionals
32
Transport Frame
32
External Emergency Stop Button
33
External Charge Stop Button
33
Transport, Handling and Unpacking
34
Transport of the EVSE - Preliminary Operation
35
Move the Packaged EVSE
36
Move the PD Control Box and the PD Bracket with a Forklift Truck
36
Move the Pantograph down with a Forklift Truck
36
Hoist the Pantograph down
38
Unpacking
39
Unpacking the PD Control Box and the PD Bracket
39
Unpacking the Pantograph down
40
Move the Unpacked EVSE
41
Move the Unpacked Panto down with a Forklift Truck
41
Preliminary Operations
41
Components Supplied with the EVSE
46
Components Supplied with the PD Control Box
46
Components Supplied with the Pantograph down
46
Components Supplied with the PD Bracket (ABB6AGC113049)
47
Access to the Internal Parts
48
PD Control Box
49
Open the Front Door
49
Open/Remove the Internal Covers
49
Close the Doors
50
Installation
51
PD Control Box - Installation
52
Wall/Structure Installation of the Control Box
52
Wall Space Requirements
52
Install the Brackets on the Control Box
53
Install the Control Box on the Wall/Structure
53
Parameter Description
53
Pantograph down - Installation
54
Preliminary Installation Checks
54
Ceiling Space Requirements
55
Front View
55
Top View
55
Position of the PD Kit with Respect to the Bus
55
PD Bracket Assembly on the Pantograph
56
Ceiling Installation of the Pantograph down
60
Electrical Connection
62
Electrical Connection PD Control Box - Pantograph down
62
Protective Earth Connections
62
DC Power Cables Connection
66
Control Pilot (CP) and Control Pilot PE (CP PE) Connection
68
ACS and 24V DC Cable Connection
71
Heater Power Supply Cable Connection
73
Electrical Connection PD Control Box - Pantograph Bracket Devices
75
Wireless Antenna Cable Connection
76
RFID (Optional) Cable Connection
77
Connection Specifications
77
LED Tower Light Cable Connection
79
Terminal Description
80
Electrical Installation HVC 200/300/360 - PD Control Box
81
Protective Earth (PE) Connection
81
Connect the Main PE
82
Connect the Lighting Protection Earth
83
AC Auxiliary Connection
83
DC Input Power Connection
85
Interlock and DC Guard Connection
86
Ethernet Connection (Standard Communication Line)
89
Use of the Long Distance Communication (Optical Fiber)
91
Optic Fiber Cable Specification (Not Supplied)
91
Optical Fiber Connection
92
HVC 200/300/360 Reconfiguration for Optical Fiber Communication
93
Ethernet Connectors
94
Emergency and External Stop Buttons Connection (Optional)
95
Operation and Correct Use
97
Prepare for Commissioning
98
Prepare before Use
99
Operation in the Winter
99
Alignment of the EV
99
Admitted Pantograph Position Tolerance
100
Charge Session
101
Start a Charge Session
101
Stop a Charge Session
103
Maintenance and Troubleshooting
104
Maintenance Schedule for the Owner
105
Troubleshooting
105
Technical Data
106
Technical Data Specification - PD Kit
107
Technical Data - PD Control Box Depot
107
Technical Data - Pantograph DP40
108
Cable Specifications
109
Torque Specification
110
Charging Interface
110
Attachments
111
Overall Dimensions
112
Pantograph down
112
Pantograph down - Pantograph Working Range
113
Pantograph down - Transport Frame
114
PD Control Box Dopot
115
PD Control Box Depot - Connection Diagram
116
Advertisement
Advertisement
Related Products
ABB Power2 800-M
ABB Power2 850-M
ABB PDP32.0
ABB PD501-4CH
ABB PDCOM
ABB TruFit PDU 750 kVa
ABB TruFit PDU 850 kVa
ABB TruFit PDU 950 kVa
ABB PVS-175-TL-3700
ABB PVS-175-TL-5920
ABB Categories
Industrial Equipment
Controller
Measuring Instruments
Battery Charger
DC Drives
More ABB Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL