installation
Cutting Hole in Ceiling
DOUBLE
HEADERS
ceiling for 8" dia. pipe will fit between standard
spacing of ioists.
Drill hole in center of opening through ceiling and
layout 14!$" square opening on ceiling for 8" dia.
pipe,
3. Cut out opening. Double headers should be
placed between ioists for extra support and nailed
in place. (See Figs. 11 and 12.) NOTE: If 30'
must be 22%", with 8" dia. pipe; or 24%" with
10" dia. pipe.
NOTE: If BFSL Thimble is used, boxed area will
have to be 17%" sq.

installing the chimney

If Chimney Passes Through
Floor or Ceiling
If chimney passes through a floor or ceiling, a fire-
stop spacer must be used. Firestop spacer should be
B O X E D J O I S T S FOF
8" DIA.
located at the bottom of each framed opening in any
floor or ceiling that the Triple Wall Pipe passes through,
(See Fig. 13). except uppermost where insulation is
between ioists. Then spacer must be on top of ioists.
FIRE STOP SPACER
8
BOTTOM SIDE OF JOISTS
Portions of the chimney that may pass through ac-
cessible spaces must be enclosed maintaining 1" mini-
mum clearance to avoid personal contact with or
damage to the chimney.
Keep Insulation Away From Chimney!
TRIPLE WALL PIPE
REMOVE
NAILS FROM
SHINGLES
WHERE
FLASHING
A T T A C H W I T H

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bi36bBi42b

Table of Contents