Page 3
Supplementary Installation Instructions SUPPLEMENTARY INSTALLATION INSTRUCTIONS FOR THE UK MARKET TO BE READ IN CONJUNCTION WITH THOSE IN THE INSTRUCTION BOOKLET READ THE INSTRUCTION BOOKLET AND THESE SUPPLEMENTARY INSTRUCTIONS CAREFULLY BEFORE INSTALLATION These instructions together with those in the instruction booklet cover the basic principles to ensure the satisfactory installation of the boiler, although detail may need slight modification to suit particular local site conditions.
Supplementary Installation Instructions 2. Health and Safety HEALTH AND SAFETY PRECAUTIONS Special care must be taken when installing the boiler such that the requirements of the Health and Safety atWork Act are met. CO Alarms Building regulations require that when ever a new or replacement fixed solid fuel or wood/biomass appliance is installed in a dwelling a carbon monoxide alarm must be fitted in the same room as the appliance.
Supplementary Installation Instructions 3. PREPARATORY WORK AND SAFETY CHECKS IMPORTANT WARNING This boiler must not be installed into a chimney that serves any other heating appliance. If a boiler is to be fitted where there is mechanical extraction in same or adjoining room as the boiler a safety test must be undertaken in accordance with Building Regulations Approved Document J, to ensure that the appliance operates safely whether or not the fans are running.
Page 6
Supplementary Installation Instructions 3. PREPARATORY WORK AND SAFETY CHECKS Any existing chimney must be clear of obstruction and have been swept clean immediately before installation of the lining system. Where the chimney is believed to have previously served an open fire installation it is possible that the higher flue gas temperature from a closed appliance may loosen deposits that were previously firmly adhered, with the consequent risk of flue blockage.
Supplementary Installation Instructions 4. General Notes Electrical connections The installation of any electrical services during the installation of this boiler and any associated heating system controls must be carried out by a registered competent electrician and in accordance with the requirements of the latest issue of BS 7671. Combustion Air Supply In order for the appliance to perform efficiently and safely there must be an adequate air supply into the room in which the boiler is installed to provide combustion air.
Page 8
Supplementary Installation Instructions 4. General Notes Connection to chimney All boilers have a flue gas connector that allows connection to either a masonry chimney or a prefabricated factory made insulated metal chimney in accordance with the instructions. This connection should never be reduced in diameter to lower than that of the flue gas connector of the boiler.
Page 9
Supplementary Installation Instructions 4. General Notes Commissioning and handover Ensure all parts are fitted in accordance with the instructions. On completion of the installation allow a suitable period of time for any fire cement and mortar to dry out, before lighting the boiler. Once the boiler is under fire check all seals for soundness and that the boiler and water system are operating correctly.
Page 10
Supplementary Installation Instructions 5. Approvals The Clean Air Act 1993 and Smoke Control Areas Under the Clean Air Act local authorities may declare the whole or part of the district of the authority to be a smoke control area. It is an offence to emit smoke from a chimney of a building, from a furnace or from any fixed boiler if located in a designated smoke control area.
Supplementary Installation Instructions READ THE INSTRUCTION BOOK AND THESE INSTRUCTIONS CAREFULLY BEFORE USING THE BOILER WARNING NOTE Properly installed, operated and maintained this appliance will not emit fumes into the dwelling. Occasional fumes from de-ashing and re-fuelling may occur. However, persistent fume emission is potentially dangerous and must not be tolerated.
Supplementary Installation Instructions IMPORTANT NOTES General Before lighting the boiler check with the installer that the installation work and commissioning checks described above have been carried out correctly and that the chimney has been swept clean, is sound and free from any obstructions. As part of the boilers’...
Page 17
Supplementary Installation Instructions Important Notes Periods of Prolonged Non-Use If the boiler is to be left unused for a prolonged period of time then it should be given a thorough clean to remove ash and unburned fuel residues. Empty the combustion chamber of any unburnt fuel.
Page 18
Supplementary Installation Instructions Approvals The Clean Air Act 1993 and Smoke Control Areas Under the Clean Air Act local authorities may declare the whole or part of the district of the authority to be a smoke control area. It is an offence to emit smoke from a chimney of a building, from a furnace or from any fixed boiler if located in a designated smoke control area.