Download Print this page

Crown CRN2.5 Operating & Installation Instructions Manual

Advertisement

Quick Links

Crown Celsius 100
OPERATING & INSTALLATION INSTRUCTIONS
MODELS: CRN2.5, CRN5, CRN7.5,CRN10, CRN15, CRN20, CRN25 CI & EI
CELSIUS 100 BOILING WATER UNITS
PROUDLY MADE IN AUSTRALIA
Boiling Water Units
Features:
Automatic filling.
Electronically controlled.
Economical to use.
Serviced without
removing the tap.
Boil dry protected
element.
Steam free operation.
Available in white or stain-
less steel cover.

Advertisement

loading

Summary of Contents for Crown CRN2.5

  • Page 1  Boil dry protected element.  Steam free operation.  Available in white or stain- less steel cover. OPERATING & INSTALLATION INSTRUCTIONS CELSIUS 100 BOILING WATER UNITS MODELS: CRN2.5, CRN5, CRN7.5,CRN10, CRN15, CRN20, CRN25 CI & EI...
  • Page 2 (above) for the corresponding model. If you require a larger element specify this in the product order form. All models are supplied as White powder coated finish unless Stainless Steel is specified. WARRANTY 12 Months Parts and Labor against system failure. CROWN INDUSTRIES...
  • Page 3: Product Guarantee

    Failure to fit adequate filters will void the warranty of the product. Service If this boiling water unit requires service of any kind just contact Crown Industries, direct on Melbourne (03) 9739 6966 for your nearest supplier of service and spare parts.
  • Page 4 CROWN INDUSTRIES...
  • Page 5 TROUBLE SHOOTING ACTION ONLY TO BE PERFORMED BY A QUALIFIED PERSON WE RECOMMEND THAT IF THE ABOVE SYMPTOMS AND ACTIONS CAN NOT BE REPAIRED TO RING CROWN INDUSTRIES FOR TECHNICAL ASSISTANCE ON MELBOURNE AUSTRALIA 61-3-97396966 OR CONTACT YOUR NEAREST CROWN DISTRIBUTOR.
  • Page 6: To Replace The Circuit Board

    Carefully fit the plugs to the appropriate sockets on the new replacement circuit board and proceed to screw the circuit board assembly onto the back panel. Turn the power on at the power point then proceed to check the Boiling Water Unit for correct operation ie; heating, filling and stand by. CROWN INDUSTRIES...
  • Page 7 Carefully fit the plugs to the appropriate sockets on the new replacement circuit board and proceed to screw the circuit board assembly onto the back panel. Turn the power on at the power point then proceed to check the Boiling Water Unit for correct operation ie; heating, filling and stand by. CROWN INDUSTRIES...
  • Page 8 ELECTRICAL REPAIRS TO BE PERFORMED BY A QUALIFIED PERSON ONLY. Wiring diagram for Celsius 100 CROWN INDUSTRIES FACTORY 47 70-72 CAVE HILL ROAD LILYDALE VIC TORIA AUSTRALIA 3140 Phone: 61 3 9739 6966 Fax: 61 3 9769 6977...

This manual is also suitable for:

Crn7.5Crn15Crn5Crn20Crn10Crn25 ci ... Show all