Page 4
Proprietary Rights Notice This document contains proprietary information of LSI Corporation. The information contained herein is not to be used by or disclosed to third parties without the express written permission of an officer of LSI Corporation. Document Description Document 46277-00, Rev. A. March 2010.
Things to Know – Connecting the Storage Enclosure to Another Storage Enclosure ....3-2 Steps to Connect – Storage Enclosures with the Power Off .............3-3 Steps to Connect – Storage Enclosure with the Power On ...............3-4 Things to Know – Basic Cabling Configurations ...................3-5 630J Storage Enclosure Installation and Overview Guide...
Page 6
LEDs on the Storage Enclosure ......................4-3 ID Diagnostic Codes on the Seven-Segment Display..............4-8 General Behavior of the LEDs ........................4-9 Service Action LEDs..........................4-11 A: A (ESM) C PPENDIX DDING A ECOND NVIRONMENTAL ERVICES ONITOR ANISTER 630J Storage Enclosure Installation and Overview Guide...
Chapter Preparing for an Installation Use this document to install the 630J storage enclosure. If you are adding the storage enclosure to an existing storage array, look at the profile for your storage array. The profile shows information about the number of drives that are supported by your storage array, such as the following: •...
Included with Basic Hardware and Tools Item the Storage Enclosure 630J storage enclosure with end caps that are packaged separately. Mounting rails, clip nuts, and screws The mounting rails that are available with the Optional storage enclosure are designed for an industry- standard cabinet.
Labels – To help you to identify cable connections and to more easily trace cables • A cart – To hold the storage enclosure and its components • A Phillips screwdriver • A flat-blade screwdriver • Antistatic protection • A flashlight 630J Storage Enclosure Installation and Overview Guide...
IMPORTANT Each storage enclosure in the storage array must have a minimum of two drives for proper operation. If an enclosure has fewer than two drives, a power supply error is reported. Figure 1–1 630J Storage Enclosure – Front View 97001-02 1 Left End Cap (has the storage enclosure LEDs)
If you replace or add more than one drive without powering down the storage enclosure, install the drives one at a time. Wait 10 seconds after you insert each drive before inserting the next one. 630J Storage Enclosure Installation and Overview Guide...
If the top half of the cabinet is heavier than the bottom half, the cabinet might fall and cause bodily injury. Always install a component in the lowest available position in the cabinet. 630J Storage Enclosure Installation and Overview Guide...
Page 13
Fans pull air through the storage enclosure from front to back across the drives. Lower the feet on the cabinet to level it and to keep the cabinet from moving. Remove the storage enclosure and all contents from the shipping carton. 630J Storage Enclosure Installation and Overview Guide...
Page 14
If you are installing the mounting rails above an existing storage enclosure, position the mounting rails directly above the storage enclosure. If you are installing the mounting rails below an existing storage enclosure, allow 8.8-cm (3.5-in.) vertical clearance for a storage enclosure. 630J Storage Enclosure Installation and Overview Guide...
Page 15
The front flange of each mounting rail has two alignment spacers. The alignment spacers are designed to fit into the mounting holes in the cabinet. The alignment spacers help position and hold the mounting rail. 630J Storage Enclosure Installation and Overview Guide...
Page 16
Tighten the adjustment screws on the mounting rail. Repeat substep through substep to install the second mounting rail on the other side of the cabinet. 630J Storage Enclosure Installation and Overview Guide...
Page 17
1 Mounting rail 2 Clip 3 Partial view of the storage enclosure rear sheet metal 4 Align the hole in the storage enclosure sheet metal with the captured nut in the mounting rail. 630J Storage Enclosure Installation and Overview Guide...
Page 18
Insert one M4 (8mm) screw through the side sheet metal of the storage enclosure into the captured nut on the side of the mounting rail. Tighten the screw. Repeat substep for the other side. 630J Storage Enclosure Installation and Overview Guide...
Page 19
Gently press on the bottom of the end cap until it snaps into place over the retainer on the bottom of the storage enclosure mounting flange. Figure 2–7 Attaching the End Caps to the 630J Storage Enclosure 78040-03 1 Hinge Tab...
The HDD mounting screws should be tightened to 6 in-lb to securely hold the drive in the drive canister. Figure 2–8 Installing a Drive in a Drive Canister 97008-01 1 Drive 2 Drive Canister 2-10 630J Storage Enclosure Installation and Overview Guide...
IMPORTANT Make sure that you do not turn on the power to the storage enclosure until this installation and overview guide instructs you to do so. For the correct procedure for turning on the power, see “Steps to Turn On – Power” on page 4-1. 630J Storage Enclosure Installation and Overview Guide 2-11...
Make sure that both of the Power switches on the storage enclosures are turned off (Figure 2–10). Connect the primary power cords from the cabinet to the external power source. Figure 2–10 Power Switches on a Storage Enclosure 97002-10 1 Power Switches 2-12 630J Storage Enclosure Installation and Overview Guide...
“Steps to Connect – Storage Enclosure with the Power On“ Page “Things to Know – Basic Cabling Configurations“ Page Key Terms drive channel The path for the transfer of data between the hosts and the drives in the storage array. 630J Storage Enclosure Installation and Overview Guide...
“universal key. ” Otherwise, the two ends of the cables might need to be switched with each other so that they match with the proper ESM connectors. High-quality, compatible cables with universal keys from LSI are available from your system supplier. Table 3–1 Cabling Configurations...
Plug the other end of the cable into the connector with an up arrow on the next storage enclosure. Repeat step through step for each storage enclosure that you intend to add to the storage array. Repeat step through step for a second host. 630J Storage Enclosure Installation and Overview Guide...
Plug the other end of the cable into the connector with an up arrow on the ESM in the storage enclosure. Are you adding more storage enclosures? Yes – Go to step 5. No – Go to step 8. 630J Storage Enclosure Installation and Overview Guide...
Single ESM, single host, and multiple storage Figure 3–2 on page enclosures Single ESM, dual host, and multiple storage Figure 3–3 on page enclosures Dual ESMs, dual hosts, and multiple storage Figure 3–4 on page enclosures 630J Storage Enclosure Installation and Overview Guide...
Figure 3–1 Simple Configuration: Single ESM, Single Host, and Single Storage Enclosure HOST 1 ESM A 97009-01 Figure 3–2 Single ESM, Single Host, and Multiple Storage Enclosures HOST 1 ESM A ESM A ESM A 630J Storage Enclosure Installation and Overview Guide...
Page 29
HOST 2 ESM A ESM A ESM A 97009-03 Figure 3–4 Dual ESMs, Dual Hosts, and Multiple Storage Enclosures HOST 1 HOST ESM A ESM B ESM A ESM B ESM A ESM B 630J Storage Enclosure Installation and Overview Guide...
Page 30
Connecting the Storage Enclosure to the Host ......... 630J Storage Enclosure Installation and Overview Guide...
Turn on the Power switch on each power-fan canister in all of the newly installed storage enclosures. Figure 4–1 Power Switches on a Storage Enclosure 97002-10 1 Power Switches 630J Storage Enclosure Installation and Overview Guide...
ESM Link LED comes on. If any one PHY becomes nonoperational, the amber ESM Link Fault LED comes on. It is possible for both the ESM Link LED and the ESM Link Fault LED to be on at the same time. 630J Storage Enclosure Installation and Overview Guide...
Power Green Power is present. Power is not present. Standby Power Green The storage enclosure is in The storage enclosure Standby Power mode. is not in Standby Power mode. 630J Storage Enclosure Installation and Overview Guide...
Page 34
Normal operation – The power is turned on, but drive I/O activity is not occurring. Normal operation – Drive I/O activity is Blinking occurring. Service action required – A fault condition exists, and the drive is offline. 630J Storage Enclosure Installation and Overview Guide...
Page 35
At least one PHY of the No link error has occurred. four connections is working, but another PHY cannot establish the same link to the device connected to the Host IN port connector. 630J Storage Enclosure Installation and Overview Guide...
Page 36
Power is not present to present. the ESM. Seven-Segment Green See note. Not applicable. Tray ID NOTE For more information about the Seven-Segment Tray IDs, see “ID Diagnostic Codes on the Seven-Segment Display” on page 4-8. 630J Storage Enclosure Installation and Overview Guide...
Page 37
A fault exists within the Normal status. Action Required power-fan canister. Power-Fan AC Green AC power to the power- AC power to the power- Power fan canister is present. fan canister is not present. 630J Storage Enclosure Installation and Overview Guide...
SFP transceivers are present in currently unsupported ESM slots, either 2A or 2B. Secondary trunking SFP transceiver slots 2A and 2B are not supported. Look for the SFP transceiver with the blinking amber LED, and remove it. 630J Storage Enclosure Installation and Overview Guide...
Allowed canister, the power-fan canister, or Power-fan canister the drive. Drive Off – Do not remove the ESM canister, the power-fan canister, or the drive. The drive has an LED, but no symbol. 630J Storage Enclosure Installation and Overview Guide...
Page 40
On – The cable is attached and at above each least one lane has a link-up status. expansion Off – The cable is not attached, or connector the cable is attached and all lanes have a link-down status. 4-10 630J Storage Enclosure Installation and Overview Guide...
Check your storage management software to determine the action that you should take. NOTE In most cases, the Service Action Allowed LED comes on when the Service Action Required LED is on for a canister. 630J Storage Enclosure Installation and Overview Guide 4-11...
Page 42
Turning on the Power and Checking for Problems ........4-12 630J Storage Enclosure Installation and Overview Guide...
Page 43
If possible, use the storage management software to create, save, and print a new storage array profile. Put on antistatic protection. 630J Storage Enclosure Installation and Overview Guide...
Page 44
ESM canister into place. Connect all of the interface cables from the other storage enclosures to the new ESM canister. See “Things to Know – Basic Cabling Configurations” on page 3-5. 630J Storage Enclosure Installation and Overview Guide...
Page 45
LSI Corporation, is not responsible for any radio or television interference caused by unauthorized modification of this equipment or the substitution or attachment of connecting cables and equipment other than those specified by LSI. It is the user’s responsibility to correct interference caused by such unauthorized modification, substitution, or attachment.
Page 46
FCC-2 630J Storage Enclosure Installation and Overview Guide...
Need help?
Do you have a question about the 630J and is the answer not in the manual?
Questions and answers