Installation - Pelc VS5104 Installation & Operation Manual

Vs5100 series sequential switcher
Table of Contents

Advertisement

Installation

The VS5104/VS5108 switcher is designed for either looping or terminating operation. The unit is shipped ready for terminating operation, but it
can be modified for looping operation. Looping and terminating inputs may be mixed.
1. To install the VS5104/VS5108, do the following:
a.
Terminating operation: Proceed to step 2.
b.
Looping operation: To convert to looping operation, remove the cover. Locate the 75-ohm resistors at the rear of the BNC jacks. Use wire
cutters to clip one of the resistor leads for each input that you want to loop. Refer to Figure 1. Replace the cover.
2. Connect all equipment for your system to the connectors located on the back of the unit. Refer to Figure 2.
3. Connect the AC adapter to the 12 VAC input socket on the switcher. Connect the transformer to a 120 power supply.
4. Set all channel switches to the AUTO (center). If a video input is not connected, set the corresponding channel switch to the BYPASS (down)
position.
5. Adjust the DWELL interval control with a screwdriver to the desired switching interval, 1 to 70 seconds nominal. Rotate the control
clockwise for longer intervals and counter-clockwise for shorter intervals. This control is a 15-turn precision potentiometer. The
approximate ratio is one full turn per 4 to 5 seconds of delay.
C831M-G (8/12)
CLIP
HERE
Figure 1. Rear Panel Internal View
VS5104
MONITOR
AUTO
BYPASS
DWELL
1
2
3
4
VS5104 VIDEO SWITCHER
FRONT VIEW
12 VAC
INPUT
MON
OUT
BACK VIEW
Figure 2. VS5104/VS5108 System Configuration
75-OHM RESISTOR
BNC CONNECTOR
VS5108
MONITOR
AUTO
BYPASS
DWELL
1
2
3
4
5
6
7
8
VS5108 VIDEO SWITCHER
FRONT VIEW
12 VAC
INPUT
BACK VIEW
MON
OUT
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vs5108

Table of Contents