Download Print this page

Direct Vent Thru Fitting And Cap; Installation Procedure - Dickinson Newport P1200000-NEW-P12000 Installation And Operating Manual

Propane fireplace/heater

Advertisement

Additional 28" (70cm) lengths of pipe are sold as an option ( Part No. 19-000). This pipe can be
cut with a fine hacksaw blade to the required length. A coupling fitting is provided with the
optional length.
DIRECT VENT THRU-FITTING AND CAP
Deck Flange
Screw Pilot Holes
Deck
4 Mounting Screws

INSTALLATION PROCEDURE

Step - 1 Cut a 3" hole through the deck, ceiling or wall.
Step - 2
Step - 3
Step - 4
Step - 5
Step - 6
Step - 7
www.ahoycaptain.com
Make sure the sealing gasket is installed under the above deck-flange before
screwing down the fitting.
the boat, so that it is not visible.
secure with the 6 S/S screws supplied.
Attach the dress ring on the inside, and on the underside, of the fitting with the 4
S/S screws supplied. Make sure that the opening lines up with the underside of
the thru-deck or the pipe will not fit correctly.
Install the flexible pipe on the heater.
Make whatever bends are necessary in the flexible pipe and push into the thru-
fitting.
Secure the heater in position by attaching the back mounting plate.
Using the screw pilot holes in the outer pipe of the thru-fitting drill two 1/8"
o
6" (15cm)
3" (75mm)
Flexible Double Pipe
Rotate the fitting to position the pipe seam, inside
Holding the deck flange firmly in position
6 Mounting Screws
Sealing Gasket
Dress Ring
6

Advertisement

loading