  • Page 1 ECOWOOD 25 INSTALLATION AND OPERATION MANUAL W W W . J A S P I . C O . U K JASPI KNOWS HEATING...
  • Page 2: Table Of Contents

    CONTENTS TECHNICAL DATA ..................3 OPERATING PRINCIPLE ................4 BOILER INSTALLATION ................4 BOILER OPERATION ..................7 BOILER CLEANING..................8 BOILER SPARES.................... 8 WARRANTY ....................8 UK TECHNICAL HELPLINE 0 1392 247 340 EU INSURANCE CERTIFICATE OF COMPLIANCE The insurance certificate pertains to JÄSPI TUPLA, TRIPLEX, ECOPUU, YPV 40, and VPK hand filled solid-fuel boilers manufactured by our company.
  • Page 3: Technical Data

    1. TECHNICAL DATA Power: 25 kW Design pressure: 1.5 bar Recommended flue: Weight: 290 kg Water volume: 65 l - Min. length 5 m - Ø150 mm pipe or brick flue Fig. 1 ECOPUU-25 boiler parts and dimensions NOZZLES: FURNACE PARTS: PARTS: Storage battery supply 10 Background brick extension...
  • Page 4: Operating Principle

    2. OPERATING PRINCIPLE Firewood (coal, briquets) is burnt on the ceramic grate on the basis of the rotary / lower combustion principle. Combustion air flows precisely where needed: to the furnace top, onto the fire bar, and down the bar into the firing throat for the final combustion phase to occur.
  • Page 5 5 (8)
  • Page 6 6 (8)
  • Page 7: Boiler Operation

    4. BOILER OPERATION Caution ! While filling and cleaning the furnace, keep in mind that the background vertical brick (Part number 11) is not shock-resistant. Use a small amount of firewood for the first burning process to avoid bar splitting by boiling water that could soak in.
  • Page 8: Boiler Cleaning

    5. BOILER CLEANING Clean the boiler at the front. Remove ash from the bar brick (14). Remove the firing throat (16) and shake ash out; thus, it is also used as an ash box. Open the cleanout port (22), remove the turbulators (18 and 19), and clean the ducts with the brush supplied in the boiler cleaning kit.