BandLuxe E580 Series Installation Manual

(embedded sim)

Advertisement

E580 Series
(Embedded SIM)
Installation Guide

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the E580 Series and is the answer not in the manual?

Questions and answers

Summary of Contents for BandLuxe E580 Series

  • Page 1 E580 Series (Embedded SIM) Installation Guide...
  • Page 2: Package Contents

    Package Contents LTE Outdoor CPE Mounting bracket Optional: Plug head water resistant kits (RJ-45) Passive PoE adapter (E580A series) Passive PoE adapter (E580P series) Product Overview Power: Power LED will remain lit while power is applied. Signal strength: Indicate receive signal strength. The Signal Strength LEDs are only used at the power on to assist the installation.
  • Page 3: Notice Before Installation

    - Choose the best location of the house and the orientation of the CPE to get the strongest signal reception from base station. - The ambient temperature for E580 series must be within: E580A series : -10°C to 55°C E580P series : -40°C to 55°C...
  • Page 4 Mount assembly package 13.5 Hex Head Bolt Kit-1 Kit-2 M8 Spring Washer (M8x50mm) Quantity: 1 Quantity: 1 Quantity: 3 Quantity: 2 Washer M8x22 Spring Washer Hex Head Bolt M8 Hexagon Nuts (OD) mm (M5x35mm) (M5) Quantity: 2 Quantity: 2 Quantity: 2 Quantity: 6 12.7 Hex.
  • Page 5: Wall-Mount Assembly

    Wall-mount Assembly Step 1: Align the mounting bracket on the wall. Using the bracket as mounting template, mark the positions to drill the holes. Step 2: Assemble the bracket as shown in the illustration. Step 2. Step 1. Step 3: Attach the bracket to the back of the CPE. Step 3.
  • Page 6: Pole-Mount Assembly

    Pole-mount Assembly Step 1: Align the mounting bracket on the wall. Using the bracket as mounting template, mark the positions to drill the holes. Step 2: Assemble the bracket as shown in the illustration. Step 2. Step 1. Step 3: Attach the bracket to the back of the CPE. Step 3.
  • Page 7 Step 4: Align a pole on the bracket and assemble the pole bracket as shown. Step 5: Adjust the CPE position to an appropriate direction and secure the pole bracket using the designated screws and washers. Step 4. For 2.5” diameter Step 4.
  • Page 8 Connect to PC Prepare two Ethernet cables for connection. Step 1: Insert the other end of the Ethernet cable to “P+D OUT” port of the PoE adapter. Step 2: Connect another Ethernet cable to a Network Hub/Router or directly to PC/Laptop via PoE adapter (“Data/IN” port). Step 3: Plug the PoE adapter to an electrical outlet.
  • Page 9 Adjusting CPE position For optimum reception, fine tune the CPE orientation (horizontally or vertically) to have the best signal strength shown from LED or other test equipment. Note: LEDs (on the front panel) indicate signal strength. Horizontal angle adjustment Step 1: Loose the top knob using the wrench as shown.
  • Page 10 Step 3: Click OK to login to the main screen. Step 4: Click one of the header tabs for advanced features. E580 series CPE uses network domain 192.168.1. X. For any downstream connections, all devices should avoid using this network domain otherwise there might be IP address conflict and cause communication failure.
  • Page 11 Appendix 1. Water-proof RJ-45 cable jack assembly RJ45 Plug Seal Gasket Lock Nut Housing Sealing Nut 40.0(REF) 3.5(REF) Cable Seal Lock Nut Strip Cable Sheath Insert The Lock Nut Insert The Seal At Insert The Cable All Recommended Wire Into The Housing. The Back End Of The The Through.
  • Page 12 Appendix 2. Important Installation Considerations Before installing the outdoor CPE, consider the appropriate location, clearance, and device orientation. Location and Cable wiring  Consult your Service Provider to find the best location and angle for getting the strongest signal from the base station. ...
  • Page 13: Position Adjustment

    Appendix 2. Position Adjustment  The CPE must be directed towards the nearest base station. By pointing the CPE in the proper direction ensures that you receive the strongest signal.  Fine tune the signal by adjusting the orientation horizontally or vertically to increase the CPE signal strength.
  • Page 14 68060211021 P/N: 68060211021 Rev.A...

Table of Contents