Pre-Fi Lter Installation - Sea Clear Watermakers G-20 Installation Manual

Table of Contents

Advertisement

PRE-FILTER INSTALLATION
The Pre-fi lter Housing should be located for easy access, away
from any electronics or other surfaces that cannot get wet.
❶ Mount the Pre-fi lter Housing to a bulkhead using the
supplied bracket.
►►►
Be sure to leave enough room below the housing to
allow for Pre-fi lter changes.
❷ Glue PVC fi ttings with PVC glue as required per your
installation.
❸ Run a 1/2" hose from the intake side of the Pre-fi lter Housing to the hose barb on the Control Panel
labeled "To H.P. pump."
❹ During the Control Panel installation, you attached a 1/4" hose to the back of the Control Panel and
left it loose. Connect this hose to the 1/4" hose barb on the output side of the Pre-fi lter Housing.
❺ Run a 1/2" hose from the output side of the Pre-fi lter Housing to the input hose barb on the High
Pressure Pump.
❻ Place the 5-micron Pre-fi lter that was included with your kit into the Pre-fi lter Housing. Screw the
Pre-fi lter Housing back into place.
❼ The fi rst time the Seawater Lift Pump is started or when the Pre-fi lter is changed, you must release
the air from the Pre-fi lter. Push and hold the red button on top of the Pre-fi lter Housing and turn on
the Seawater Lift Pump. Continue to hold the button until air stops being released. As soon as water
is seen, release the button.
Sea Clear Watermakers™ Manual - Version 1.1-G
Page 26

Advertisement

Table of Contents
loading

This manual is also suitable for:

G-40

Table of Contents